• Title/Summary/Keyword: Underground-Structure

Search Result 996, Processing Time 0.025 seconds

A Case Study on the Boring-Hole Blasting for Offering of the Ground Vibration Source (지진동 Source 제공을 위한 심부 시추공발파 기술사례)

  • 조영곤;김희도;조준호
    • Tunnel and Underground Space
    • /
    • v.13 no.3
    • /
    • pp.187-195
    • /
    • 2003
  • This case study which is to make 2-Dimension earth's crust structures clearly is about the great boring-hole blasting to provide ground vibration source of the reflected wave research on the Korean Peninsula earth's crust structures research. For this study we've done blasting twice-500 ㎏/charge per delay, 1,000 ㎏/charge per delay, and the specifications of blasting are the following - dia.: 300 ㎜, boring-depth : 100m, besides, we used the explosives and electric detonators which have sufficient detonating velocity and very excellent safety, capacity of detonating, accurate delay time. We charged explosives into steel pipe with bulk type to avoid dead pressure by ground water. And then we tested about pipe airtight and blasting to certificate which has no problem by using on this study. In the results, we succeeded each blasting in Seosan, Youngdong. For the Peak Sum Vector(PSV) around the blasting at the main points, its real measured PSV is higher 180 % than estimated PSV with USBM. In this study we can't to be analysis of vibration velocity, but to be key providing vibration source.

Behavior of Quaywall Pile by Lateral Movement of Revetment on Soft Ground (연약지반 호안의 측방유동에 따른 안벽 말뚝의 거동)

  • Shin, Eunchul;Park, Jeongjun;Ryu, Ingi
    • Journal of the Korean GEO-environmental Society
    • /
    • v.7 no.4
    • /
    • pp.53-62
    • /
    • 2006
  • Recently, the lateral displacement of the passive piles which are installed under the revetment on the soft ground is very important during the land reclamation work along the coastal line. The revetment on the soft clay develops the lateral displacement of ground when the revetment loading exceeds a certain limit. The lateral displacement of ground causes an excessive deformation of underground structure itself and develops lateral earth pressure against the pile foundation. The subject of study is to investigate the lateral displacement of pile foundation during the construction of container terminal at the ${\bigcirc}{\bigcirc}{\bigcirc}{\bigcirc}$ port in Incheon. The displacement of pile and the vertical settlement were measured in the field and finite element method(FEM) analysis for each construction sequence was performed using AFFIMEX(Ver 3.4). From the comparison of the results from field measurement and the finite element analysis, the settlement of the reventment has already occurred at the time of field measurements. Since then, the noticeable lateral displacement of piles and settlement were occurred during the filling of dredged soil inside the revetment dredging and reclaiming work. After completing filling, the lateral displacement and field settlement were reduced remarkably. Generally, the results from the finite element analysis show larger than those from the measurement.

  • PDF

A Study on Indoor Radon Concentration among Vulnerable Households in Korea (국내 라돈 취약가구에 대한 주거공간의 실내 라돈 농도에 관한 연구)

  • Zoo, Duck Hyun;Park, Ki Ho;Jeong, Hui Won;Lim, Hyeong Jun;Bok, Dong Seok;Yun, Dong Won;Min, Kyung Hwan;Mun, Kyung Deok;Kim, Jeong Un;Lee, Ji Min;Choi, Won Yong;Kim, Sung Yoon
    • Journal of Environmental Health Sciences
    • /
    • v.41 no.2
    • /
    • pp.61-70
    • /
    • 2015
  • Objectives: The purpose of this research was to examine radon exposure in terms of the relationship between the living environment and indoor radon concentrations among vulnerable households. Methods: Nationwide, 1,129 subjects were selected using personal questionnaires for adequately understanding the living environment, installation of E-PERM radon gas detectors, and investigation of the structure of the housing. Results: The mean concentration of indoor radon for all subjects was $130.2Bq/m^3$ (GM=101.7), and a total of 438 subjects (38.8%) exceeded the recommended standards ($148Bq/m^3$) for public facilities by the Ministry of the Environment. By location, the highest concentrations ($164.3Bq/m^3$, GM=124.1) were seen in North Chungcheong Province. In the case of the Seoul/Gyeonggi Province metropolitan area, they showed $125.6Bq/m^3$ (GM=105.1) and $118.9Bq/m^3$ (GM=96.5), respectively. By type of housing, indoor radon concentrations in single-family housing were higher than in row/multi-family housing (p<0.01). Although indoor radon concentrations raised in accordance with year of construction (p<0.05), the difference between indoor radon concentrations in underground residences was not observed to be statistically significant (p=0.633). Conclusion: More studies are necessary in the future regarding the difference in indoor radon concentrations that may occur due to different of types of indoor construction, building materials, and the amount of building materials.

A Case Study on Economic Analysis of a Solar Water Heating System and a Ground Source Heat Pump System Applied to a Military Building (군 복지시설의 지열시스템과 태양열시스템 경제성 평가 사례 연구)

  • Lee, Jong-Chan;Park, Young-Ho;Lee, Ghang;Lee, Sang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.111-118
    • /
    • 2009
  • This study is to analyze the performance of SWH(Solar Water Heating) and GSHP(Ground Source Heat Pump) systems by evaluating their energy efficiency and LCC(Life Cycle Cost) as being applied to the OO hall as a selected building in the Army. The OO hall, used as bathrooms, dining rooms, accommodations and offices, has reinforced concrete structure system with three floors above the ground and one underground, and its total floor area is approximately 2,917$m^2$. Two energy simulations are conducted to predict the yearly cooling and heating energy of the selected building: One is for analysis of an air-conditioning energy consumption using the e-Quest program, and another is for two new-renewable energy facilities as a water heating source using the RETScreen. The installed capacity of two new-renewable energy facilities is determined according to the 5% level of total standard construction cost. As a briefly result, SWH system is more energy-effective than GSHP system. Considering the break-even point, it is expected that SWH can take only 3 years 11 months to pay for itself in savings while the investment of GSHP can be recovered in more than 16 years 6 months.

High Efficient Inductive Power Supply System Implemented for On Line Electric Vehicles

  • Huh, Jin;Park, Eun-Ha;Jung, Gu-Ho;Rim, Chun-Taek
    • Proceedings of the KIPE Conference
    • /
    • 2009.11a
    • /
    • pp.105-110
    • /
    • 2009
  • The On Line Electric Vehicles(OLEV) that can pick up inductive power from underground coils on driving with high efficiency have been developed this year, and is now proposed in this paper. The IPS(Inductive Power Supply) system consists of power supply inverters, power supply rails, pick up modules, and a regulator. There are 3 generations of IPS have been developed so far, and the $4^{th}$ generation IPS is being developed. The $1^{st}$ generation has been demonstrated this Feb. 27, which is equipped with mechanically auto tracking pick-up module with 1cm air gap, and showed 80% power efficiency. The $2^{nd}$ generation IPS applied to an 120kW (average)/240kW(peak) motor powered electric bus has 17cm air gap with 72% power efficiency. For the $2^{nd}$ generation IPS, the Power supply inverter has 440V, 3phase input and 200A @ 20kHz output. The test power supply rail of 240m long is segmented by 60m each, where newly developed core structure and power cable are constructed under the road covered with asphalt of 5cm thickness. The pick-up modules which consist of core, winding wire, and rectifiers are fixed to the bottom of the bus which can carry more than 40 passengers and can pick up max. 60kW. To remove parasitic component and to transfer maximum power between them resonant circuit topology is applied to the primary and secondary sides. The EMF level is below 62.5mG at 1.75m from the center of the road to meet the regulation. Several effective ways of reducing EMF levels have been developed. In addition, effective ways to solve problems related high frequency power cables buried in ground and it's proof from soil have been studied also. This development shows that the IPS system is capable of supplying enough power to the pick-up of OLEV and can reduce battery size, weight and cost, which means the IPS with OLEV is one of the best candidate for EV.

  • PDF

Analysis on the Safety of Structure and Economics of Replacement Method Using Rock Debris in the Soft Ground - Case Study of Miho Stream Crossing Road in Cheongju City (연약지반 암버럭 치환공법의 구조물 안정성과 경제성 분석 - 청주시 미호천 횡단도로를 대상으로)

  • Heo, Kang Kug;Park, Hyung Keun;Ahn, Byung Chul;Min, Byeong Uk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.4
    • /
    • pp.705-713
    • /
    • 2016
  • For the soft ground construction, the factors not considered in the design stage occurs in the construction stage so that they cause the increase of the construction cost due to the structural stability and the design change. The subject of the study is the construction section of the industrial complex access road made in the Ochang region of Chungcheongbuk-do. The study is concerned with selecting the soft ground handling method such as the replacement method using rock debris and the surcharge reflecting the service load as the soft ground handling measure and analyzing the effect of reducing the construction cost with the stability of structures and the reduction of the construction period. The soft ground in the study section consists of sandy and cohesive soil and is 2.4m to 5.5m deep. It is distributed unevenly between the 1.5m to 5.9m stratums under the ground surface. Settlement is not serious, but the future uneven settlement and difference are expected so that the future settlement behavior is estimated by analyzing the site measurement results after the soft ground treatment. Moreover, in consideration of the regional characteristics and economic efficiency, soil with good quality is replaced with rock debris as the replacement material so that 29% of the construction cost is reduced due to the increase of stability and the reduction of duration. If the estimation of the dispersion of the pore water pressure within the dam body and the change of the underground water level and the relation of the actually measured soft ground with consolidation is studied further on the basis of the study, it is expected that the behavior of the soft ground will be correctly estimated in various site conditions.

Relations between Electrical and Hydraulic Properties of Aquifer in the Ganam Area (가남지역 대수층의 전기적, 수리적 특성 사이의 관계)

  • 이기화;최병수;한원석
    • Journal of the Korean Society of Groundwater Environment
    • /
    • v.2 no.2
    • /
    • pp.78-84
    • /
    • 1995
  • In 1983, 83 Wenner vertical electrical sounding(VES)s and 22 pumping tests had been carried out by Korea Agricultural Development Corporation(KADC) in Guam Myun, Yeoju Gun, Kyounggi Province. Also, 10 boreholes had been constructed in the area. Using these data electrical and hydraulic properties of aquifer in the Ganam area are investigated in this study. Assuming that the underground is 1-D, VES data are analyzed. Data analysis shows that the subsurface of study area can be interpreted as 4-layer structure and the 3rd layer which is regarded as aquifer has mean thickness of 10 m and mean resistivity of 506 ohm-m and rests on resistive bedrock. Under the circumstances, as most part of electric current flows parallel to the bedding, longitudinal unit conductance is an important parameter controlling VES curves and very closely correlates with transmissivity of aquifer in the study area. Thus, relation between longitudinal unit conductance and transmissivity is investigated in this study. Since resistivity and thickness of each layer are obtained from interpretation of VES data, the relations between transmissivity and resistivity, and between hydraulic conductivity and resistivity are also studied. Studies of such relations show that longitudinal conductance is proportional to transmissivity, and resistivity is inversely proportional to transmissivity and hydraulic conductivity.

  • PDF

A Study on Environmental Design Treatments of Subway Stations in Terms of Visual Cues for Place Indication - Focused on the Cases of Seoul, Tokyo and Taipei - (장소지시단서로서의 지하철역 환경디자인 기법에 관한 연구 -서울, 동경, 타이페이 사례를 중심으로-)

  • Park, Hey-Kyung
    • Archives of design research
    • /
    • v.19 no.5 s.67
    • /
    • pp.351-362
    • /
    • 2006
  • Currently, finding one's way in the underground spaces associated with subway stations in large cities is becoming a serious problem, and an environment that facilitates wayfinding is becoming more important. This study investigated interior treatments that function as visual cues in the subway stations of Seoul, Tokyo, and Taipei in order to develop design guidelines that would improve the place-cognition environment. A theoretical study has shown that there are three categories of visual cue for place cognition: marked trails, regional differentiation, and landmarks. The case study showed that marked trails involve treatments like vertical markers, confrontational positioning, and subway color codes. Regional differentiation involves patterns on the floors and walls, and accent colors on the walls and columns. Landmarks include treatments such as super graphics, symbolic features, artistic decoration and special lights. In the cases of Seoul, marked trails and regional differentiation were predominant. In addition, the Olympic symbol 'Hodori' and the ancient Korean character "Hunminjungeum" were used as landmarks. In the cases of Tokyo, regional differentiation predominated over marked trails because of the complexity of the spatial structure and subway line connection system. In the cases of Taipei, simple, unified images predominated, and there was minimal dependence on marked trails and landmarks. The need for regional differentiation was weak, because the stations studied have open structures that guarantee an open field of view. The results of this research could be used as design guidelines, after further experimental verification, that would help to improve the public environment in terms of wayfinding.

  • PDF

Planning for Amphibians Habitats in Urban Forest Wetlands, Korea (도시 산림습지 내 양서류 서식처 조성방안 연구)

  • Hur, Myung-Jin;Han, Bong-Ho;Kwak, Jeong-In
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.20 no.6
    • /
    • pp.1-19
    • /
    • 2017
  • This study set out to identify problems with amphibian habitation by the wetland types and improve their habitation environment in urban forest wetlands, thus creating a habitat for amphibians. Study site include forest swamps in Jatjul Park as well as Yeoji neighborhood Park in Guro-gu, and in Choansan neighborhood Park in Dobong-gu. The forest swamp in Jatjul Park gets its water from Mt. Maebong and it is a former escalated farmland-turned wetland. The swamp area is $2,500m^2$, a forest zone and a landscape planting site are 83.27% and 6.70% each. Target species Seoul pond frogs are inseparable from rice fields because they live in a short radius of and lay eggs in or near paddy fields, and Rana nigromaculata have similarities with Rana plancyi chosenica in choosing their habitats. There was need for paths that would lead to other paths so amphibians would spread to other parts of the forest and for measures to secure open water. Modifying a variety of routes for water, human and animals along with building a buffer to keep the core habitation zones were required. The forest swamp in Yeonji neighborhood Park used to be a water reservoir on the foot of Mt. Gunji. The swamp area is $1,980m^2$, a forest zone and farmland account for 80.61% and 4.88% each. Non-point pollutants from upstream along run into the subject forest marsh, bare ground on the around swamp and steep stone embankments obstructed amphibians. Target species was Bufo gargarizans that live in forests and edges of hills and spawn in deep water. The forest swamp in Choansan neighborhood Park gets its water from Mt. Choan and it is close to its water source that it is a mountain stream forest wetland. The basin and the swamp are $35,240m^2$ and $250m^2$ in size respectively. A forest zone accounts for 90.20%, high stone embankments laid in refurbishing the valley obstruct amphibians and there is water shortage in times of droughts. Target species were Rana coreana, Rana dybowskii and Hynobius leechii that live in mountain valleys, streams and wetlands and lay eggs in forest marshes and rocks in valleys. Looking into the three swamps of amphibian habitation, I came to conclusions that those wetlands were suitable for their amphibians but man-made facilities blocked their corridors leading to other corridors and even killed off target species in some parts of those swamps by destroying those parts. Amphibians live in water, on ground and underground at different stages of life. Hence, we should take this fact into consideration when planning their habitats and design core habitation zones, buffers zone and use zones accordingly. Buffer zones ought to be between core habitation zones and surrounding trees. Aiming at protecting core habitation zones, buffers should be in harmony with habitation zones. Use zones should be minimized in size and not in direct contact with core habitation zones.

ETS Sampler design for borehole radar receiver using 4 different clock phases (위상이 다른 4개의 클럭을 이용한 시추공 레이다 수신기용 ETS 샘플러 설계)

  • Yoo, Young-jae;Oh, Chaegon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.1
    • /
    • pp.680-687
    • /
    • 2018
  • Borehole radar is a radar used for underground resources and geological exploration purposes. It needs a high-speed sampler to transmit electromagnetic waves with a pulse width of several ns and to receive reflected waves of several tens to several hundreds of MHz reflected from the object to be surveyed. ETS (Equivalent-Time Sampling), which can achieve sampling performance of several GHz with a sampling frequency of several tens of MHz, is suitable for use as a sampler of a borehole radar receiver. In this paper, we propose a method to control the sampling clock delay, which is the most important factor in ETS sampler design, using four clocks with phase difference of $90^{\circ}$ for one clock source. The proposed method can reduce the time required to acquire the data within the set interval by 1/25 than the conventional method using the delay generator. When the implemented sampler is applied to the receiver of existing borehole radar, it is possible to accumulate 58 additional times due to the shortened sampling time. In addition, by using one delay control logic compared with the conventional method using several sampling clock delay control logic in order to satisfy the target sampling range, it is possible to omit the correction process which was necessary in the past. As a result, the structure of the system can be simplified and a uniform sampler can be realized.