Characteristics of Subsidence of a Road During the New Tubular Roof Construction Around a Shallow Tunnel (저심도 터널주변의 NTR보강 중 발생한 도로면 침하의 특성)

  • Kim, Cheehwan
    • Tunnel and Underground Space
    • /
    • v.28 no.6
    • /
    • pp.620-634
    • /
    • 2018
  • The NTR(New Tubular Roof) method was used to secure the stability of the tunnel and minimize the subsidence of the road. The tunnel was constructed at about 7.5 meters deep below the highway. with a width of about 21 meters. Following the NTR method, 13 steel pipes with a diameter of 2.3 meters were digged and pushed in longitudinally along the tunnel profile and cut out sides of pipes to connect to adjacent pipes, then filled the inside of pipes and the connected space between pipes with concrete to complete the lining of the tunnel to be excavated. As the steel pipes were digged in sequentially, the area of relaxation was connected to each other and behaves like a gradually widening tunnel. When the steel pipes were digged in to the widest points of the tunnel, the settlement rate of the road surface was increasing to the maximum as 2.2 mm and the total settlement until the lining construction was approximately 7.7 mm. After that, by excavating a tunnel inside the pre-installed lining, an additional settlement of about 4.3 mm was occurred, resulting in the total settlement of about 11.8 mm after completing of tunnel construction.

A design case study of the very wide 3-arch tunnel under Daejeon railroad station building (I) (대전역사 하부통과 3-arch 터널의 설계사례 연구 (I))

  • Chang, Seok-Bue;Moon, Sang-Jo;Kwon, Seung;Huh, Do-Hak;Bae, Gyu-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.3
    • /
    • pp.247-260
    • /
    • 2002
  • This paper presents the design case of the 3-arch tunnel under Daejeon railroad station building. The original construction method was the underpinning method supported by pipe-roof, but it was changed to the mined tunnelling method because of the complex construction condition and the safety problem. This 3-arch tunnel has a width of 28 meters and a height of 10 meters. Overburden is only 23m and the ground around the tunnel is a weathered rock. The allowable settlements for the station building and some railroads are very strict. Accordingly, various measurements for the tunnel stability and the settlement minimization was applied and they were reviewed by 2-D and 3-D numerical analysis.

  • PDF

A study on numerical modeling method considering gap parameter and backfill grouting of the shield TBM tunnel (쉴드 TBM 터널의 gap parameter와 뒤채움재를 고려한 수치모델링 방법에 대한 연구)

  • You, Kwang-Ho;Kim, Young-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.5
    • /
    • pp.799-812
    • /
    • 2017
  • Backfill grouting and realistic convergence distribution were not properly considered in previous studies on 2D numerical analysis of a shield TBM tunnel. In this study, a modeling method was suggested to cope with this problem by considering a realistic convergence distribution and proper properties of backfill grouting. To this end, the influence of gap parameter and depth of rock cover on volume loss and composed of ground volume loss around tunnel excavation and surface volume loss were analyzed with a single layer of weathered soil. As a result, most of surface settlements were occurred immediately after excavation. Additional, as depth of rock cover and gap parameter increased, the influence range of surface settlement curves obtained from 2D numerical analyses became broader than a suggested theoretical equation. Therefore, it is inferred that gap parameter should be applied based on load distribution ratio and the property of backfill grouting properly considered for the estimation of the precise behavior of a shield TBM tunnel in 2D numerical analysis.

Case Study on the Tunnel Collapse at the Shallow Depth (NATM터널 저토피 구간에서의 막장붕락 사례연구)

  • Baek Ki-Hyun;Roh Jong-Ryun;Kim Yong-Il;Cho Sang-Kook;Hwang Nag-Youn
    • Tunnel and Underground Space
    • /
    • v.15 no.2 s.55
    • /
    • pp.102-110
    • /
    • 2005
  • ○ ○ tunnel that is located at Iksan - Jangsu freeway ○ ○, has collapsed during construction at the valley with shallow depth. Although, the site investigations, such as TSP, drilling exploration and so of indicated the presence of discontinuities in this section. The RMR was upgraded and the construction were carried out because that not only actual rock qualities were relatively good during construction but also the tunnel foe was stabilized. However, the tunnel was collapsed at the same time blasting of full face, and surface and underground water was infiltrated due to the settlement of the upper part of the tunnel face. To restore the collapsed section, 3-d tunnel stability analysis was performed and suitable reinforcement methods were chosen. The cavity of the upper tunnel face was stabilized by means of UAM and ALC injection. And the settlement was restored using L.W grouting method.

Effects of DCM Column Properties in Softground on Stabilities of Underground Roadways (연약지반내 DCM 개량체의 특성이 지하차도의 안정성에 미치는 영향)

  • Ahn, Tae-Bong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.2C
    • /
    • pp.77-84
    • /
    • 2010
  • In planning underground roadway foundation on soft ground, deep cement mixing method (DCM) is employed. The proper mixing ratio using batch test and replacement rates that meet strength criteria are used for deep cement mixing column. Stiffness ratio and distance between deep cement mixing columns (C.T.C) are varied to find out influences on stress, displacement, and differential settlement. The replacement ratios that meet settlement criteria are 10~35%. As stiffness varies, stress reaches at 769.kPa that exceed criteria due to stress concentration when stiffness ratio difference is over 30. Also, when C.T.C is 5 m, stress spreads to soils, so C.T.C need to be considered carefully. The vertical displacement is 0.6~1.56 cm, and angular distortion is 1/909~1/510.

Analysis of hydraulic behavior around tunnel after application of cutoff grouting and proposing a method for estimating grouting range (차수그라우팅 적용에 따른 터널주변 수리학적 거동 분석과 그라우팅 적용범위 산정방법의 제안)

  • Joon-Shik Moon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.1
    • /
    • pp.79-89
    • /
    • 2024
  • Excessive inflow of groundwater during tunnel excavation not only affects the stability and constructability of the tunnel, but is also one of the main causes of ground settlement due to groundwater level drawdown. The most commonly applied measure against excessive groundwater inflow during tunnel excavation in soil or fractured zone is to reduce the ground permeability coefficient by injecting grout material. Generally, the grouting area is assumed to be same as the plastic zone that occurs during tunnel excavation, but injecting grout material in the area of plastic zone is appropriate only for reinforcement grouting. In order to determine the thickness of cutoff grouting, the amount of reduction in the water permeability coefficient due to the application of cutoff grouting must be considered. In this study, a method for estimating the range of cutoff grouting considering the reduction in permeability coefficient was mathematically derived and evaluated through computer numerical analysis.

A Numerical Analysis on the Collapse and Backfill Mechanism of the Abandoned Mine Cavity (폐광의 점진적 파괴 및 뒷채움 효과에 대한 해석적 연구)

  • Lee, Jun-Suk;Bang, C.S.
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.2 no.2
    • /
    • pp.62-71
    • /
    • 2000
  • The abandoned mines causing settlement of the surface above and collapse of the cavities are the major influencing factor on the stability of the nearby underground structures. To prevent the harmful effect, the backfill methods are commonly applied to the cavities although the design criteria and the analysis method are not properly addressed in some cases. An approximate analytical method together with the numerical technique is considered in this study to simulate the gradual deterioration of the rock masses around the cavities and, therefore, the influential zone to the underground structures passing through the cavities. Also considered in this study is the backfill effect on the stability of the rock masses around the cavities. Specifically, the incomplete backfill effect is compared with that of the idealized backfill method by adopting elasto-plastic analysis involving a strain softening material law.

  • PDF

Deformation Behavior Underground Pipe with CLSM (유동성 채움재를 이용한 지하 매설관의 변형특성 연구)

  • Park, Jae-Hun;Lee, Kwan-Ho;Jo, Jae-Yun;Sung, Sang-Kyu
    • International Journal of Highway Engineering
    • /
    • v.5 no.2 s.16
    • /
    • pp.25-35
    • /
    • 2003
  • During construction of circular lifeline pipe, the non-proper compaction along the pipe and the decrease of compaction efficiency are the main problems to induce the failure of underground pipe. The use of CLSM(controlled low strength materials) is one of the applications to overcome those problems. In this research, the numerical analysis by PENTAGON FEM program was carried out for 20 cases with the couple of combinations on bedding materials, backfill materials, and pipes. From the FEM analysis, the use of CLSM as backfill materials reduced the settlement of ground surface and the deformation of pipe employed. In case of the vertical deformation on the pipe, common soil backfill for flexible pipes showed 2 times for rigid pipes, but CLSM backfill case did less deformation than the soil backfill for rigid pipes. CLSM backfills for rigid pipes showed the similar results. Judging from the FEM analysis, the use of CLSM increases the structure capacity of the underground pipes.

  • PDF

The Case Study of Rock Treatment Method for the Fractured Rock Foundation of Underground Roadway Structure (기반암의 파쇄대 특성을 고려한 지하차도 기초 보강사례)

  • Yoon, Ji-Nam;Yang, Sung-Don;Lee, Geun-Ha;Park, Sa-Won;Jung, Hun-Chul
    • Tunnel and Underground Space
    • /
    • v.18 no.2
    • /
    • pp.125-133
    • /
    • 2008
  • The rock treatment methods for improving bearing capacity and reducing settlement of the underground roadway structure foundation on fractured rock was studied in this paper. Also, effective reinforcement scheme was evaluated by numerical analysis for the application to the practical construction. Various in-situ and laboratory tests were executed systematically at Yeongi-goon, Ohoongchungnam-do, Korea, for the purpose of defining the physical and mechanical properties of rock. Consequently the effective treatment methods insuring the bearing capacity of fractured rock were proposed. In addition, the adequate reinforcing depth of the comparatives measure, such as double rod, triple rod injection methods and micropile, were investigated from the case study. Finally, the most effective construction scheme with the consideration of safety and economical aspects were proposed by using numerical analysis(Plaxis ver. 8.2).

Study on Improvement Plan of System through Analysis of Ground Sink Accidents - Focused on the management of underground facilities and their surrounding ground - (지반함몰 사고 분석을 통한 제도 개선안 연구 - 지하시설물 및 주변지반 관리 중심으로 -)

  • Kim, Dong-jin;Lee, Jong-keun;Kim, Hong-kyoon;No, Tae-kil
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.3 no.1
    • /
    • pp.18-24
    • /
    • 2020
  • The purpose of this study is to propose a system improvement plan to prevent ground sinking accidents. To do this, follow the procedure below. First, it defines terms that are used interchangeably, such as ground subsidence and ground depression. Second, analysis of the current status and cause of ground sink, and the analysis of the correlation between rainfall and ground sink causes, derives priority management causes. Third, we propose a system improvement plan for the cause of priority management. As a result, damage to underground pipes and inadequate underground works were identified as the cause of priority management, and two system improvement plans to manage them were proposed. The results of this study can be used as basic data for improving the system for more effective prevention of underground sink in the future.