• Title/Summary/Keyword: Underground power transmission system

Search Result 114, Processing Time 0.067 seconds

Electric Leakage Point Detection System of Underground Power Cable Using Half-period Modulated Transmission Waveform and Earth Electric Potential Measurement (반주기 변조된 송신파형과 대지전위 측정을 이용한 지중 케이블 누전 고장점 탐지 시스템)

  • Jeon, Jeong Chay;Yoo, Jae-Geun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.12
    • /
    • pp.2113-2118
    • /
    • 2016
  • The precise detection of electric leakage point of underground power cable is very important to reduce cost and time of maintenance and prevent electric shock accident through expedite repair of electric leakage point. This paper proposes a electric leakage point detection system underground power cable using of half-period modulated transmission waveform and earth electric potential measurement. The developed system is composed of transmitter to generate the wanted pulse waveform, receiver to measure and display earth electric potential by the transmitted pulse in electric leakage point and PC Software program to display of GPS coordinate on detection cable line. The performance of the electric leakage point detection system was tested in the constructed underground cable leakage detection test bed. The test results on signal generation voltage precision of signal transmitter, mean detection earth voltage, mean detection leakage current and electric leakage point detection error showed the developed system can be used in electric leakage point detection underground power cable.

Collecting Travel Time Data of Mine Equipments in an Underground Mine using Reverse RFID Systems (Reverse RFID 시스템을 이용한 지하광산에서의 장비 이동시간 측정)

  • Jung, Jihoo;Choi, Yosoon
    • Tunnel and Underground Space
    • /
    • v.26 no.4
    • /
    • pp.253-265
    • /
    • 2016
  • In this study, travel time data collection of mine equipments was conducted in an underground mine using a reverse Radio Frequency IDentification (RFID) system. In the reverse RFID system, RFID readers and antennas are mounted on mine equipments, and RFID tags are attached to the underground mine gallery. Indoor experiments were performed to analyze how RFID reader transmission power levels affect tag readable area and tag recognition rates. The results showed that travel time measurement become precise when the reader transmission power was reduced, however tag recognition rates were reduced. The field experiments indicated that setting the reader transmission power to 28 dBm maintained the tag recognition rate while minimizing the tracking location error. In addition, the results revealed that the reverse RFID system can be used successfully in an underground mine to collect the travel time data of haulage trucks.

A Study on Fault Location Using Wavelet in 154kV Transmission Power Cable (154kV 지중송전케이블에서 Wavelet을 이용한 Fault Location에 관한 연구)

  • Lee, Jun-Sung;Lee, Jong-Beom;Moon, Sung-Chall
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.437-439
    • /
    • 2000
  • This paper describes a fault location technique using wavelets in underground transmission cable system Estimation of fault location is performed using data sampled at two ends of underground system. In the case of 50% fault of total underground transmission line, fault location is calculated using sampled single-end data in underground transmission line. Traveling wave is utilized in capturing the travel time of the transients along the monitored lines between the relay and the fault point. This travel time information is provided by the wavelet. Simulation was performed using EMTP. ATP Draw and MATLAB. The results of fault location shown in this paper will be evaluated as an effective suggestion for fault to location in real underground transmission line.

  • PDF

Sheath Circulating Current Analysis of a Crossbonded Power Cable Systems

  • Jung, Chae-Kyun;Lee, Jong-Beom;Kang, Ji-Won
    • Journal of Electrical Engineering and Technology
    • /
    • v.2 no.3
    • /
    • pp.320-328
    • /
    • 2007
  • The sheath in underground power cables serves as a layer to prevent moisture ingress into the insulation layer and provide a path for earth return current. Nowadays, owing to the maturity of manufacturing technologies, there are normally no problems for the quality of the sheath itself. However, after the cable is laid in the cable tunnel and is operating as part of the transmission network, due to network construction and some unexpected factors, some problems may be caused to the sheath. One of them is the high sheath circulating current. In a power cable system, the uniform configuration of the cables between sections is sometimes difficult to achieve because of the geometrical limitation. This will cause the increase of sheath circulating current, which results in the increase of sheath loss and the decrease of permissible current. This paper will study the various characteristics and effects of sheath circulating current, and then will prove why the sheath current rises on the underground power cable system. A newly designed device known as the Power Cable Current Analyser, as well as ATP simulation and calculation equation are used for this analysis.

Test-Field Construction for Long-term Reliability of EHV Underground Transmission Cable (초고압 지중케이블 장기신뢰성 실증시험장 구축)

  • Kim, Jin;Kang, Ji-Won;Jang, Tae-In;Yang, Byeung-Mo;Park, Jun-Woo;Park, Hung-Sok;Yoon, Hyung-Hee
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.383_384
    • /
    • 2009
  • After the 1970s, the importance of underground transmission systems increased and the construction rate of underground transmission lines also showed increasing trends each year, especially in metropolitan areas. Accordingly the social ripple effects are very large and wide when the fault occurs in underground power system, and the amount of time and money spent to restore the system also increases. So we must ensure stable operation and long-term reliability of the facilities. In Korea's case, long-term reliability tests for EHV power cables and accessories progressed poorly because equipment was not compatible for long-term reliability tests. Therefore we planned to construct a long-term reliability test field for EHV underground cables in order to ensure international quality reliability and optimal power cable operation techniques. The Gochang Underground Cable Test Field is under construction, funded by the Korean government, the govenment's union investment department, KEPCO, KERI and three private cable corporations. This project began in March, 2005 and will be completed by February, 2010. It is designed to promote joint research by incorporating several types of test equipment, construction of operating facilities, and being an internationally certified authority.

  • PDF

Performance Estimation of Protector for 154 kV Underground Cable (154kV 지중 케이블 보호장치의 성능평가)

  • Cho, H.G.;Lee, J.H.;Han, S.W.;Kim, S.S.
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2002.05c
    • /
    • pp.127-131
    • /
    • 2002
  • The surge protector is crucial power apparatus to guarantee the safe operation of power transmission of underground cable which can effectively restrain the overvoltage and inductive lightning stroke in power system. The surge protector is crucial power apparatus to guarantee the safe operation of power transmission of underground cable which can effectively restrain the overvoltage and inductive lightning stroke in power system. This paper described the results of a study on the performance for surge protector for underground cable. And, the performance of surge protector was evaluated through such as measurement of the reference voltage, residual voltage and impulse current etc. In results of surge protector, reference and residual voltage of ZnO element is 4.75 kV, 9.86 kV respectively. Also, In the impulse current test, thermal properties are good, despite of that polymeric housing of surge protector has thick structure. Therefore the developed surge protector is thought to apply for underground cable.

  • PDF

A Prospect of the Future Power System Configuration with 22kV Class Superconducting Cable (22kV급 초전도 케이블을 이용한 미래 전력계통 구성 방안 고찰)

  • Kim, Jong-Yul;Yoon, Jae-Young;Choi, Heung-Kwan
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.406-408
    • /
    • 2003
  • As power demand increases gradually, the call for underground transmission system increases. But it is very difficult and high in cost to construct new ducts and/or tunnels for power cables in metropolitan areas. HTS (High Temperature Superconducting) cable has the several useful characteristics such as increased power density. Therefore HTS cable can allow more power to be moved in existing ducts, which means very large economical and environmental benefits. In this paper, we investigate the status of korean power system and underground transmission system. Based on this, the feasibility study on applying 22kV class HTS cable to korean power system is carried out and then we propose the new power system configuration of metropolitan area with 22kV class HTS cable.

  • PDF

The first installation of underground transmission line with 345kV XLPE cable in Korea (345kV XLPE 케이블 선로의 준공)

  • Shin, H.D.;Kim, H.J.;Kim, H.J.;Park, K.R.;Song, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07c
    • /
    • pp.1815-1817
    • /
    • 2003
  • Since the first underground transmission line in Korea was installed in 1974, the two types of underground transmission power cables, oil-filled and XLPE, have been applied for underground transmission lines. As the manufacturing technologies of XLPE cable have been improved and the simplicity of installation and maintenance has been focused on, the installations of XLPE cables have been largely increased since the mid 1990's. For the first time, in Korea, the 345kV XLPE cable was installed at Pyungtaek thermal power plant in 2003, February. So, this paper introduces the project profile, the design of cable and its accessory, the cable system design, installation and site test.

  • PDF

A Study on Heat Transfer of an Underground Power Transmission Cable-Joint (지중송전케이블 접속부에서의 열전달에 관한 연구)

  • Park, M.H.;Kim, J.K.;Lee, J.H.
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.5 no.4
    • /
    • pp.265-277
    • /
    • 1993
  • Recently, underground transmission system is growing continuously according to the electric power demand increase in the downtown area. Even if domestic cable makers are manufacturing 154kV oil filled cable and joint, the design technology of cable-joint has not been fully self-reliance. This study is aimed at the detail heat transfer analysis of 154kV cable-joint. So, that is cut into the five sections in order to analyze a conjugate natural convection in two dimensional $r-{\theta}$ coordinate. The streamline and temperature distributions are obtained for each sections. Also the changes of those are analyzed with respect to the variation of transmission currents and cable-joint surface heat transfer coefficients. The same analyses are also shown in view point of the maximum temperature of conductor and local equivalent conductivity.

  • PDF

The first installation of long-distance underground transmission line with 345kV XLPE Cable in Korea (장거리 345kV XLPE 케이블 지중송전선로의 준공)

  • Shin, H.D.;Park, K.R.
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.376-378
    • /
    • 2003
  • Since the first underground transmission line of Korea was installed between Danginri and Yongsan substations in 1974, the two types of underground transmission power cables, oil-filled and XLPE, have been applied for underground transmission lines. As the manufacturing technologies of XLPE cable have been improved and the simplicity of installation and maintenance has been focused on, the installations of XLPE cables have been largely increased since the mid 1990's. For the first time, in Korea, the 345kV XLPE cable was installed between Youngseo and Youngdeungpo substations in 2003, June. So, this paper introduces the project profile, the design of cable and its accessory, the cable system design, installation and site test.

  • PDF