• Title/Summary/Keyword: Underground infrastructure

Search Result 248, Processing Time 0.022 seconds

A Study of the DB Design Standard for Submitting Completion Drawings for Auto-Renewal of Underground Facility Information (지하시설물정보 자동갱신을 위한 준공도서 제출 표준DB 설계 연구)

  • Park, Dong Hyun;Jang, Yong Gu;Ryu, Ji Song
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.38 no.6
    • /
    • pp.681-688
    • /
    • 2020
  • The Under Space Integrated Map has been constructed consistently from '15 construction projects until the present time in an effort to implement the "ground sinking prevention method" for the purpose of strengthening underground safety management. The constructed Under Space Integrated Map is utilized to provide information to the person in charge at local government through application of the system of underground information based on the administrative network and to deliver this to specialized underground-safety-effects -evaluation organizations through map extraction based on a floor plan. It suffers from a limitation in its practical use, however, since information is only provided, without promoting a separate renewal project. Although in Section 1 of Article 42 in the Special Law Concerning Underground Safety Management the content pertaining to submission obligations of completion drawings related to underground information including change and renewal are stated explicitly in order to solve this problem, submission is not sufficient since a submission window based only on the administrative network is operated. Accordingly, the Ministry of Land, Infrastructure, and Transport constructed an online system for submitting completion drawings, in an attempt to change the method by which entities involved in underground development directly submitted completion drawings. In this study, a DB standard relating to submitting completion drawings was designed and applied in order to construct an auto-renewal system based on submitted completion drawings, which will be extended to cover the range to underground structures hereafter.

A Study on Simplified Analysis and Estimation Method for Evaluation of Structural Safety in Modular Underground Arch Structure (모듈러 지중아치 구조 안전성 검토를 위한 간략 해석 및 평가방법에 관한 연구)

  • Kwon, Tae-Yun;Cho, Kwang-Il;Lee, Wong-Hong;Ahn, Jin-Hee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.26 no.3
    • /
    • pp.55-63
    • /
    • 2022
  • A modular underground arch structure using steel and concrete has been proposed as a structure that has a simple construction process and can effectively resist cross-sectional forces generated during construction and use. Structural behavior of modular underground arch was evaluated about span length less than 15m through 3D structural analysis and test. In general, 2D and 3D structural analysis methods may be applied for structural analysis such as underground arch and tunnels. However, if a 2D or 3D structural analysis method is applied to evaluate the structural safety of a modular underground arch structure, it is difficult to model for structural analysis and it may take an excessively long time to interpret. Therefore, it may not be reasonable as a structural analysis method for considering the structural safety and earth pressure in the design process of a modular underground arch structure. In addition, when a modular underground arch structure is configured for span lengths to which the predetermined cross-section is applicable, it may be reasonable to evaluate only the safety of the structure and cross-section according to the cross-section and load conditions. Therefore, in this study, a structural analysis model using frame elements was proposed for efficient structural safety evaluation. In addition, structural analysis results of the 2D structural analysis model and the simplified analysis model using frame elements were compared, and the structural safety of the modular underground arch structure for a span length of 20m was evaluated with a simplified analysis method.

Capabilities Required for Underground Facility Operations in Korean Megacities (한국 메가시티 지하시설 작전에 요구되는 능력)

  • Jun Hak Sim;Seung Jin Jo;Jun Woo Kim;Ji Woong Choi;Won Jun Choi;Sun Il Yang;Sang Hyuk Park
    • The Journal of the Convergence on Culture Technology
    • /
    • v.10 no.2
    • /
    • pp.267-272
    • /
    • 2024
  • Recently, major advanced countries are fostering megacities through policy for reasons such as solving population problems, political and economic issues, and strengthening national competitiveness. The trend of change is accelerating. In Korea, following Seoul and Gyeonggi, mega city policies are being promoted in Busan, Ulsan, Gyeongnam, Daegu and Gyeongbuk, Gwangju and Jeonnam, and Daejeon, Sejong, South Chungcheong and North Chungcheong areas. Due to this urbanization phenomenon, military experts predict that the future battlefield environment will be space or a large city (mega city). From this perspective, Korea will not be able to effectively respond to the threats facing megacities if it does not prepare in advance. Therefore, underground facility operation capabilities optimized for the huge scale of the mega city and the characteristics of the underground operational environment are required. Against this background, the characteristics of the underground operational environment of mega cities and cases of preparation for underground facility operations in advanced military countries such as the United States and Israel were analyzed. Based on this, the capabilities required for underground facility operations suitable for the underground operational environment within Korean megacities are developed from an idea perspective to military organization and combat system, securing special equipment and materials to ensure combatant survival, developing small unit combat techniques, and establishing a training system. It was presented with priority given to.

Economic Feasibility of Common Utility Tunnel based on Cost-Benefit Analysis (비용편익 분석에 기초한 공동구의 경제적 타당성 평가)

  • Kang, Yeong Ku;Choi, Ik Chang
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.5
    • /
    • pp.29-36
    • /
    • 2015
  • Common utility tunnel is essential to the daily lives of people underground utilities (electricity, gas and supply facilities such as water, communication facilities, sewer facilities, etc.) to improve the appearance by co-acceptance and disaster prevention, important for the conservation of the city's population was concentrated road construction the city-based facilities. There is recognition of the importance of the various supply treatment facilities in common utility tunnel as infrastructure to accommodate joint according to the city expanded, the demand for infrastructure. In this paper, a cost-benefit analysis using a one-time occurrence, without simply relying on cost or current cost, project manager for the city-dimensional feasibility study conducted, the user level of the maintenance costs and user costs, including social costs items from various angles can be investigated and proposed a mechanism of economic feasibility common utility tunnel. Evaluation of the proposed technique is cost-benefit and cost caused by installing common utility tunnel the existing pipeline area - was investigated by the benefit analysis, extended and repeated common utility tunnel installation depends much affected by the excavation, so users of reducing the number of repeat excavation convenience can be seen that this occurs.

Seismic Performance Evaluation of the Underground Utility Tunnel by Response Displacement Method and Response History Analysis (응답변위법과 응답이력해석법을 이용한 지중 공동구의 내진성능 평가)

  • Kwon, Ki-Yong;Lee, Jin-Sun;Kim, Yong-Kyu;Youn, Jun-Ung;Jeong, Soon-Yong
    • Journal of the Korean Geotechnical Society
    • /
    • v.36 no.11
    • /
    • pp.119-133
    • /
    • 2020
  • Underground utility tunnel, the most representative cut and cover structure, is subjected to seismic force by displacement of the surrounding soil. In 2020, Korea Infrastructure Safety Corporation has published "Seismic Performance Evaluation Guideline for Existing Utility Tunnel." This paper introduces two seismic evaluation methods, RDM (Response Displacement Method) and RHA (Response History Analysis) adopted in the guide and compares the methods for an example of an existing utility tunnel. The test tunnel had been constructed in 1988 and seismic design was not considered. RDM is performed by single and double cosine methods based on the velocity response spectrum at the base rock. RHA is performed by finite difference analysis that is able to consider nonlinear behavior of soil and structure together in two-dimensional plane strain condition. The utility tunnel shows elastic behavior for RDM, but shows plastic hinge for RHA under the collapse prevention level earthquake.

Prediction of Hydrodynamic Behavior of Unsaturated Ground Due to Hydrogen Gas Leakage in a Low-depth Underground Hydrogen Storage Facility (저심도 지중 수소저장시설에서의 수소가스 누출에 따른 불포화 지반의 수리-역학적 거동 예측 연구)

  • Go, Gyu-Hyun;Jeon, Jun-Seo;Kim, YoungSeok;Kim, Hee Won;Choi, Hyun-Jun
    • Journal of the Korean Geotechnical Society
    • /
    • v.38 no.11
    • /
    • pp.107-118
    • /
    • 2022
  • The social need for stable hydrogen storage technologies that respond to the increasing demand for hydrogen energy is increasing. Among them, underground hydrogen storage is recognized as the most economical and reasonable storage method because of its vast hydrogen storage capacity. In Korea, low-depth hydrogen storage using artificial protective structures is being considered. Further, establishing corresponding safety standards and ground stability evaluation is becoming essential. This study evaluated the hydro-mechanical behavior of the ground during a hydrogen gas leak from a low-depth underground hydrogen storage facility through the HM coupled analysis model. The predictive reliability of the simulation model was verified through benchmark experiments. A parameter study was performed using a metamodel to analyze the sensitivity of factors affecting the surface uplift caused by the upward infiltration of high-pressure hydrogen gas. Accordingly, it was confirmed that the elastic modulus of the ground was the largest. The simulation results are considered to be valuable primary data for evaluating the complex analysis of hydrogen gas explosions as well as hydrogen gas leaks in the future.

Investigation of Underground buried Cables based on Ground Penetrating Radar Data (지표 투과 레이더 데이터 기반 지하 매설 케이블 조사)

  • Choi, SungKi;Yoon, Hyung-Koo;Kim, YoungSeok;Kim, Sewon;Choi, Hyun-Jun;Min, Dae-Hong
    • Journal of the Korean Geotechnical Society
    • /
    • v.40 no.2
    • /
    • pp.105-113
    • /
    • 2024
  • Underground buried cables can cause disconnections during the construction of roads and other subterranean structures due to uncertain designs. This paper describes experiments conducted to detect and verify the locations of these cables utilizing ground penetrating radar (GPR). The experiments were carried out at an active road construction site, where cable burial was anticipated. The GPR used operated within a frequency range of 400 MHz to 900 MHz to probe underground structures. The exploration methodology consisted of an initial GPR test to survey the entire area, followed by a secondary test informed by the results of the initial experiment, incorporating a diverse and increased number of lines. The findings confirmed the hyperbolic reflection patterns of cables at consistent locations along the same lines. These patterns were then compared to existing designs to corroborate the presence of cables at the identified locations. This research establishes an effective GPR methodology based on the electromagnetic wave reflection pattern, specifically the hyperbola, to detect difficult-to-locate underground buried cables.

A Study on the Ubiquitous Cave Systems (유비쿼터스 동굴시스템에 관한 연구)

  • Oh, Jong-Woo
    • Journal of the Speleological Society of Korea
    • /
    • no.90
    • /
    • pp.35-56
    • /
    • 2009
  • The purpose of this paper is to analyze the implementation of the karst infrastructure systems for the u-cave. IT based u-cave represents spatial information derived fields, such as geographical distribution of the cave boundaries, physical configuration of the cave locations and formation characteristics of the karst history. These three aspects relate to karst infrastructure systems, cave monitoring center and spatial database implementation. In terms of the IT based u-cave infrastructure implementation systems, the u-cave depends on IT contents and spatial features. uIT contents are strongly related to IT839 strategy due to the national agenda is "u-Korea". Cave should contribute to u-cave construction through the spatial analyses methods including USN, RFID, LiDAR, ELD, and GIS technologies. For these methods various cave functions will guide to u-cave's distribution, location, and characteristics of karst. The infrastructure consists of landforms and speleothem facilities, underground related facilities, environmental protection systems, and cave planning. These six units of the cave infrastructures have spatial databases that consist of spatial configuration, such as 4-D in order to draw the spatial distribution of the limestone and lava caves. IT based u-cave system infrastructure implementation should deal with IT convergence to generate fusion affects.

Improvement on Surveying Performance Evaluation for Public Surveying of Underground Facilities (지하시설물의 공공측량 성과심사 방법 개선에 관한 연구)

  • Jung, Choong Ho;KIM, Chong-Mun;KIM, Ki-Su;CHOI, Yun-Soo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.22 no.2
    • /
    • pp.15-23
    • /
    • 2019
  • When the public surveying system was introduced in 1961, large scale surveying performances, such as infrastructure construction work, were dominant. However, due to changes in the environment, most of the current surveying performances focused on small scale underground facilities. The method of surveying underground facilities is as follows: "method of measurement before refilling after burying the pipeline" and "method of using exploration after refilling." There are advantages and disadvantages to each method. It became difficult to obtain the accuracy of the location of the underground facilities due to the fact that there were sections of the pipeline that had not been observed through exploration. Therefore, the 2017 performance evaluation regulations were revised. The revision included the addition of the "Underground Facilities Creation Period," a system that allows for surveys to be evaluated based on actual measurements. However, in this particular field, concerns about the advantages of exploration and the purpose of this study was to investigate the background and purpose of the limitations of the survey have been continuously raised. The purpose of this study was to investigate the background and purpose of the public surveying system and to identify the proportion of underground facilities surveying in comparison to public surveying. This study conducted surveys on the implementers of public surveying and those who did the actual surveying. The researcher has summarized the improvements that incorporate the analysis results and the field comments in the revised performance evaluation regulations in 2017.