• Title/Summary/Keyword: Underground infrastructure

Search Result 246, Processing Time 0.027 seconds

Evaluation of Failure Probability for Planar Failure Using Point Estimate Method (점추정법을 이용한 평면파괴의 파괴확률 신정)

  • Park, Hyuck-Jin
    • Tunnel and Underground Space
    • /
    • v.12 no.3
    • /
    • pp.189-197
    • /
    • 2002
  • In recent years, the probabilistic analysis has been used in rock slope engineering. This is because uncertainty is pervasive in rock slope engineering and most geometric and geotechnical parameters of discontinuity and rock masses are involved with uncertainty. Whilst the traditional deterministic analysis method fails to properly deal with uncertainty, the probabilistic analysis has advantages quantifying the uncertainty in parameters. As a probabilistic analysis method, the Monte Carlo simulation has been used commonly. However, the Monte Carlo simulation requires many repeated calculations and therefore, needs much effort and time to calculate the probability of failure. In contrast, the point estimate method involves a simple calculation with moments for random variables. In this study the probability of failure in rock slope is evaluated by the point estimate method and the results are compared to the probability of failure obtained by Monte Carlo simulation method.

Rock burst criteria of deep residual coal pillars in an underground coal mine: a case study

  • Qiu, Pengqi;Wang, Jun;Ning, Jianguo;Liu, Xuesheng;Hu, Shanchao;Gu, Qingheng
    • Geomechanics and Engineering
    • /
    • v.19 no.6
    • /
    • pp.499-511
    • /
    • 2019
  • The reliability of reinforced concrete structures is frequently compromised by the deterioration caused by reinforcement corrosion. Evaluating the effect caused by reinforcement corrosion on structural behaviour of corrosion damaged concrete structures is essential for effective and reliable infrastructure management. In lifecycle management of corrosion affected reinforced concrete structures, it is difficult to correctly assess the lifecycle performance due to the uncertainties associated with structural resistance deterioration. This paper presents a stochastic deterioration modelling approach to evaluate the performance deterioration of corroded concrete structures during their service life. The flexural strength deterioration is analytically predicted on the basis of bond strength evolution caused by reinforcement corrosion, which is examined by the experimental and field data available. An assessment criterion is defined to evaluate the flexural strength deterioration for the time-dependent reliability analysis. The results from the worked examples show that the proposed approach is capable of evaluating the structural reliability of corrosion damaged concrete structures.

Estimation of Total Displacements by RMR Grades using 3-Dimensional Numerical Analysis (3D 수치해석을 이용한 퇴적암 터널의 암반 등급별 전변위 산정)

  • Yim, Sung-Bin;Yun, Hyun-Seok;Seo, Yong-Seok;Park, Si-Hyun
    • The Journal of Engineering Geology
    • /
    • v.17 no.2 s.52
    • /
    • pp.217-224
    • /
    • 2007
  • Tunnel displacement happens during the process of stress redistribution by tunnelling. Tunnel displacement can be divided into 3 types such as displacements occurring before excavation, non-measured displacements after excavation and measured displacements after excavation. Because measurements of displacements occurring before excavation and non-measured displacement after excavation are difficult and time-consuming in the field, many researchers have studied on total displacement and its characteristics with excavation using numerical analysis. In this study, we used a 3-D back analysis to estimate total displacement by rock mass grades in tunnel constructed in sedimentary rock. We reduced error between measured displacements and calculated displacements from a 3-D numerical analysis, and then estimated suitable rock mass properties by RMR classes. Ultimately, Logistic nonlinear regressions of total displacement with tunnelling were estimated by least square estimation.

Assessment of Lifeline Construction Technology for Buried Alive in Building Collapse (도심지 붕괴사고에 따른 매몰지역 생명선 시공기술 평가)

  • Ryu, Byung-Hyun;Kang, Jae-Mo;Lee, Jangguen;Kim, Young-Sam;Joo, Rak-Bong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.17 no.9
    • /
    • pp.47-52
    • /
    • 2016
  • Unusual extreme weather events, which exceed a safe design capacity of the infrastructure, increase the frequency of natural disasters and has also been enlarged damage scale. Aging buildings and rapid urban progress act as weighting factors for the new composite disasters. Technological advances support detecting pre-disaster risk, real-time data analysis, and rapid response to the disaster site, but it is insufficient that emergency relief for buried alive must take advantage of the proven technologies through field tests. This study aims to evaluate directional drilling performance through underground soils and the reinforced concrete structure for primary lifeline installation in order to quickly provide relief supplies for buried alive when urban structures collapse.

Numerical Analysis about Pile Reinforcement Effect for Restraint of Lateral Displacement Occurring in the Embankment on Soft Ground (연약지반에 성토시 발생하는 수평변위 억지를 위한 말뚝보강 효과에 대한 수치해석)

  • Kim, Jae-Hong
    • Journal of the Korean Geosynthetics Society
    • /
    • v.10 no.4
    • /
    • pp.1-10
    • /
    • 2011
  • When an embankment is performed on the soft ground of the coastal with possibilities of lateral flow, lateral displacement occurs to the bottom of the surface of the ground. This lateral displacement can affect existing infra structures that are buried in the adjacent underground by causing a displacement in the nearby base foundation. Soft ground supporting piles and reinforced piles were applied as reinforcement remedies against the lateral displacement. And for the effect analysis, numerical analysis was performed under the classifications of non-reinforcement base and reinforced base. The result of the numerical analysis showed that the reinforced piles had more effects by 1.9 times than non-reinforced piles. Soft ground supporting piles showed better effects by 2.6 times than non-reinforced piles. Additionally, between the two reinforced remedies, soft ground supporting piles showed greater effects by 1.3-1.6 times than the reinforced piles.

Factors Influencing Cost Overruns in Construction Projects of International Contractors in Vietnam

  • VU, Thong Quoc;PHAM, Cuong Phu;NGUYEN, Thu Anh;NGUYEN, Phong Thanh;PHAN, Phuong Thanh;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.9
    • /
    • pp.389-400
    • /
    • 2020
  • A construction project is a designed product made up of labors, materials, and installations in the project positioned on the ground and may include the underground and ground section, and the section in water or on the water surface. It is a civil, industrial, transport, agricultural and rural development, infrastructure, or some other. A key phase in the life cycle of these construction projects is the implementation when building products are made directly with workers, equipment, materials, and managers. If there is a lack of management experience, information, and problem-solving solutions to tackle the risks faced by contractors, especially foreign ones, will fail in controlling the project's cost. This study was conducted with investigations, discussions, and evaluation of the factors that lead to cost overruns in the construction projects of international contractors in Vietnam. The principal component analysis (PCA) showed that those factors that influence cost overruns these construction projects fall into five general groups, including factors related to (i) the owners, (ii) the foreign contractors, (iii) the subcontractors and suppliers, (iv) state management, and (v) the project itself. Besides, the study proposes solutions to limit cost overruns in construction projects and improve the profitability of international contractors in Vietnam.

Influence of Delay Time and Priming Location on the Blast-Induced Ground Vibration (발파공 사이의 지연시차와 기폭위치가 지반진동에 미치는 영향)

  • Kang, Choo Won;Ryu, Bok Hyun;Choi, Tae Hong
    • Tunnel and Underground Space
    • /
    • v.24 no.1
    • /
    • pp.97-109
    • /
    • 2014
  • In order to identify the characteristics of the propagation depending on delay time (20, 25 ms) and priming location (top priming, middle priming, bottom priming), test blasts were carried out a total of 4 times using different spacing, burden, drilling length, charge per delay and was derived the formula to predict blast vibration. This study investigated the characteristics of vibration by analysis of the nomogram and prediction of Peak Particle Velocity (PPV) from delay time and priming location by the formula to predict ground vibration. And it analyzed the trends of vibration increase by standards charge 0.5, 1.6, 5, 15 kg. Standards charge is "Blasting design and construction guidelines to road construction" by the Ministry of Land, Infrastructure and Transport. Depending on the charge in favor of vibration control method is proposed. Thus, when the design was to be used as a variable.

Development Plan of Design for Safety in Construction (설계안전성 검토(DfS) 발전방안)

  • Shin, Ju Yeoul
    • Tunnel and Underground Space
    • /
    • v.27 no.6
    • /
    • pp.351-356
    • /
    • 2017
  • This study introduces the current status of the design for safety(DfS) introduced as one of the owner - centered construction site safety management plan, and presents the problems and the improvement plan. The design for safety has been shifting from the construction management-oriented safety management to the owner-centered safety management system, The owner has to make the design considering the safety from the design stage centered on the owner. The owner has to review and approve the adequacy of the safety-conscious design and The risk factors that can not be eliminated during design are the system to prevent the disaster at the construction site by planning to eliminate the risk factor when writing the safety management plan that is made at the construction stage. The design for safety system implemented from May 2016 will be further developed to prevent the risk of safety accidents that may occur in construction sites, contributing greatly to the reduction of construction accident. In addition, it suggests ways to develop more efficient and convenient system through continuous hazard finding and system improvement.

A Study on the Status and Major Achievements on Mine Subsidence Prevention Technology (광해방지 지반침하방지 기술개발 추진 현황 및 주요 성과)

  • Yang, In Jae;Lee, Seung Ah
    • Tunnel and Underground Space
    • /
    • v.27 no.6
    • /
    • pp.357-365
    • /
    • 2017
  • The mine subsidence prevention technology has been promoted based on the field test for design, construction, automation measurement and monitoring optimized for investigation, design and mine-filling efficiency customized in Korean mining environment. Based on the R&D roadmap ('07~'16) of the 1st and 2nd stage, mine reclamation technology development has been focused on developing method of evaluating subsidence stability, development of filling material and optimum filling technology, and development of measuring instrument. In the future, in order to systematic management for the subsidence risk areas, we intend to enhance technological capabilities and strengthen the technological infrastructure for business promotion in parallel with the discovery and introduction of new technology to prevent subsidence in the 4th Industrial Revolution era.

A Study on Numerical Analyses and Field Application for Tunneling Using the Critical Strain in the Ground (지반의 한계변형률을 이용한 터널수치해석 및 현장 적용성 연구)

  • Park, Si-Hyun
    • The Journal of Engineering Geology
    • /
    • v.18 no.3
    • /
    • pp.339-347
    • /
    • 2008
  • This study was carried out to assess quantitatively the safety of a tunnel by using critical strains in the ground. Critical strain is a new material property of the ground. It can be applied as deformation limits in the ground due to excavation using the measured displacement at the tunnel construction site. To achieve this purpose, the critical strain concept was reviewed and applied to assess the tunnel safety. First of all, the calculated excavation displacements of a circular tunnel by commercial programs were investigated and inputted into a feedback analysis module to calculate strains in the ground. Then the safety of tunnels was evaluated based on the critical strain concept. Subsequently the measured displacements obtained in the field are utilized practically to assess the safety of tunnels using the critical strain concept. Through this study, it was confirmed that the critical strain concept is useful to assess the safety of tunnels quantitatively.