Park, Shin-Young;Jeong, Jae-Ho;Cho, Nam-Kak;Shin, Il-Jae;Sim, Dong-Hyun
Proceedings of the Korean Geotechical Society Conference
/
2010.09a
/
pp.1314-1321
/
2010
The west express way which links south west area of the central city of Seoul has been notorious for extremely heavy traffics since its first opening in 1991(i.e. the average vehicle speed is less than 25km/h, a daily traffic is 112,000 and among them, more than 94% of the vehicles are the light vehicles). The city government recently initiated a new BTO(Build-Transfer-Operate) project as an alternative in releasing heavy traffic and a high construction cost. The proposed underground express road is the first double-level tunnel (i.e. a total length of road is 10,91km and the tunnel is 9.308km long) ever built in South Korea, while such tunnel system is not new worldwide as such A86 East tunnel in France, SMART tunnel in Malaysia, and Fuxing tunnel in China. This paper discusses major design issues regarding the internal structures such as deck slab, and secondary liner.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.20
no.4
/
pp.347-357
/
2002
It is required that information sharing and integrated management between roads and underground facilities because there are so many possibilities to happen unexpected accidents. But if there are road excavation work happened, work agency should ask fer other facility information to the facility management company. In the case of local government, it is increasing that the needs for the development of roads and underground facilities management system and information sharing because digital map generation(1/1,000 scale) completed. In this study, as a way of integrated management and information sharing between roads and underground facilities, centralized system based on internet web technique and decentralized system based on closed network technique between the local government are considered. And for the development of information sharing system, action plan and considering points are proposed.
The utilization of underground space has recently increased with the complication of road, the rise of the land price, and the development of green technology. Underground space ranges from classical excavations to subway, underground cities, and shopping malls where there are crowds of people. At this time, government has spent a lot of money in installing various types of safety facilities for preparations of increasing potential disasters. Therefore, an effective facility management system is required. In this paper, we propose an information retrieval process to effectively extract the facilities' information based on the ontology and spatial analysis in underground space. The ontology-based searching supports hierarchical and associated results as well as knowledge sharing with hierarchy concepts. The spatial analysis based searching has "Buffer" and "Near" functions to operate on a map without understanding any property of the facility information.
Journal of Korean Tunnelling and Underground Space Association
/
v.15
no.2
/
pp.69-80
/
2013
This study evaluates the seismic performance of road tunnels designed before the provisions for seismic design of tunnels were first established in 1999. Extensive design data and site investigation reports are investigated to select tunnels sections that are considered to be most susceptible to seismically induced damage under earthquake loading. Detailed analyses are performed on selected tunnels. The methods used are method of displacement and dynamic analysis. In performing the method of displacement, which is a type of pseudo-static analysis method used for underground structures, full domain and reduced domain modeling were used. The dynamic analyses are performed using finite difference method and using nonlinear constitutive model. Comparisons show that the reduced domain method of displacement match very closely with the dynamic analysis, demonstrating that it is the most suitable method for evaluating the seismic performance of road tunnels built in rocks. It is also shown that road tunnels, for which seismic design were not applied, are safe under the seismic risks corresponding to an earthquake with a return period 1000 years. It is concluded that additional seismic retrofit of tunnels is not necessary.
In this study, numerical analysis is performed to determine highly influential factors that increase the possibility of asphalt road collapse due to cavity underneath the road. The considered influence factors on road collapse due to underground cavity were the asphalt layer thickness, the cover depth, the cavity width, and the cavity height. The concentrated load and uniform distributed pressure were applied on the top surface of asphalt pavement layers with different shape of cavity and asphalt thickness. For each analysis case of given cavity and asphalt thickness, failure load was analyzed under displacement controlled condition. Based on the analyzed failure loads, the applicability of the cavity management system developed by Seoul city was evaluated. As a result of the analysis, the effect of cavity height on road collapse was not significant while the other factors considerably influenced road collapse. Consequently, degree of road collapse susceptibility should be classified by failure load rather than by the condition of existing cavity.
Journal of Korean Tunnelling and Underground Space Association
/
v.6
no.4
/
pp.357-365
/
2004
Tunnel portals are often located in areas where the risk of rock fall and/or detachement of rock fragments from rocky slopes is high. In this case it is necessary to design the portals so as to protect the road (i.e. using an artificial tunnel) or to instal structures that are able to intercept falling blocks on the slope. This paper deals with the design problems of these structures and includes a special analysis of net fences which have undergone a remarkable technological improvement over recent years.
Journal of the Korean Institute of Electrical and Electronic Material Engineers
/
v.25
no.10
/
pp.773-778
/
2012
A road energy harvester was designed and fabricated to convert mechanical energy from the vehicle load to electrical energy. The road energy harvester is composed of 16 piezoelectric cantilevers. We fabricated prototypes using a vehicle load transfer mechanism. Applying a vehicle load transfer mechanism rather than directly installing energy harvesters under roads decreases the area of road construction and allows more energy harvesters to be installed on the side of the road. The power generation amount with respect to the vehicular velocity change was assessed by installing the vehicle load transfer mechanism form and underground form. The energy harvester installed in the underground form generated power of 4.52 mJ at the vehicular velocity of 50 km/h. Also, power generation of the energy harvester installed in the vehicle load transfer mechanism form was 48.65 mJ at the vehicular velocity of 50 km/h.
keel, Jihoon;Lee, Taewoo;Lee, Sangeun;Jung, Sungwoon;Yun, Boseop;Kim, Jeongsoo;Choi, Kwangho
Journal of ILASS-Korea
/
v.21
no.4
/
pp.214-222
/
2016
Changes in road infrastructure affect driving patterns and pollutant emission characteristics. we analyzed the changes in driving patterns and pollutant emission characteristics of the driving route via measured driving patterns at year 2009 and 2016. Since 2009, there has been an increase in population and traffic demand, including residential areas and industrial facilities. Traffic conditions were improved such as the opening of the highway Inter-Change to Seoul and the construction of underground driveway. As a result, the average vehicle speed increased. More detail comparisons have made on the changes of the underground driveway section and the crossroad section, which are expected to have significant changes in the transportation infrastructure. The vehicle speed distribution of the underground driveway changed from low speed to high speed, and the increase of the time spent at the high speed and high load caused the increase of NOx emissions. The vehicle speed also increased at the crossroad section, and the consequence NOx and $CO_2$ emissions decreased. It is mainly because the decreased time spent at idle, which results from the proper traffic demand management at this area.
Park, Boyoung;Park, Sebeom;Choi, Yosoon;Park, Han-Su
Tunnel and Underground Space
/
v.25
no.4
/
pp.373-382
/
2015
This study presents a method to calculate carbon dioxide emissions of diesel vehicles operated in an underground mine using Geographic Information Systems (GIS). An underground limestone mine in Korea was selected as the study area. A GIS database was constructed to represent the haulage roads as a 3D vector network. The speed of dump trucks at each haulage road was investigated to determine the carbon dioxide emission factor. The amount of carbon dioxide emissions related to the truck's haulage work could be calculated by considering the carbon dioxide emission factor at each haulage road and the haulage distance determined by GIS-based optimal route analysis. Because diesel vehicles are widely utilized in the mining industry, the method proposed in this study can be used and further improved to calculate the amount of carbon dioxide emissions in mining sites.
Park, Sang-Heon;An, Sung-Joo;Kim, Jae-Hoon;Kim, Kyung-soo;Yun, Jun-Su;Yoo, Yong-Ho
Journal of Korean Tunnelling and Underground Space Association
/
v.21
no.6
/
pp.837-847
/
2019
Korea's long underground roads are being promoted around the metropolitan city center to realize advanced transportation networks. Many disaster prevention facilities are applied to secure fire safety of the closed and long-distance underground roads. As the facility response and fire suppression subjects are unclear, additional human and material damages from fire spread are inevitable. Therefore, in this study, we developed a remote automatic fire extinguishing system that uses the fire extinguishing water inside the fire hydrant to monitor the CCTV in the management room and sprays it directly to the fire site through automatic control. The design application method was studied through the performance improvement that can be put into practical use.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.