• Title/Summary/Keyword: Underground Power Line

Search Result 176, Processing Time 0.028 seconds

Finite Element Analysis of Underground Electrical Power Cable Structures Considering the Effects of Construction Sequence (시공단계별 영향을 고려한 터널 전력구의 유한요소해석)

  • Kim, Sun-Hoon
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.26 no.2
    • /
    • pp.147-155
    • /
    • 2013
  • In this paper structural analysis of underground electrical power cable structures which is excavated below the surface of the earth in the downtown area is carried out considering the effect of construction sequence. There are many various life-line facilities below the surface of the earth in the downtown area. MPDAP was used for finite element analysis of underground electrical power cable structures. Three typical sections are simulated by finite element models. Unbalanced equilibrium problems may be occurred when conventional finite element procedures were used for simulation of tunnel excavation. Therefore equilibrium perturbation concept was applied to solve these problems. The effects of time-dependent deformations in advancing tunnel excavation are considered in the stages of construction sequences as using the load distribution factor. It is shown that values of maximum displacement of both soil and rock surrounding underground electrical power cable structures obtained by our numerical studies are less than allowable values.

The Installation of Prefabricated Joint for 161kV XLPE Cable Underground Transmission Line (161kV XLPE CABLE용 Prefabricated joint의 실선로 적용)

  • Bong, W.K.;Chang, K.W.;Lee, H.S.;Oh, J.O.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07e
    • /
    • pp.1611-1613
    • /
    • 1998
  • The new type of prefabricated joint for 161kV XLPE cable have been developed. we, LG Cable & Machinery Ltd., made an huge contract with an foreign country's Power company for the supply of cable and accessories, the training of jointing and termination work to local personnel, technical assistance by joint venture and the supervision of installation and commissioning. By the end of 1997, one of several routes under the contract successfully finished being constructed and specially tested on site. In operation, now this underground transmission line proves well the reliability and efficiency of prefabricated joint and termination applied first time in foreign country.

  • PDF

The Development of Magnetic Field Measurement System of 3 Axis (3축 자계 측정 시스템의 개발)

  • Kim, Ki-Joon
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.30 no.4
    • /
    • pp.253-257
    • /
    • 2017
  • Nowadays, it is increasingly important to detect whether cables are live for the operator's safety if there is a sudden power failure. It is especially hard to detect the electrical field of an underground line because of shielding. This paper on detection of live-line states in cables studied the detection characteristics of the change in the magnetic field and axis as the frequency, voltage, and distance at the same load are changed using 3 axes. A search coil type was used as a magnetic field sensor with non-contact. We found that magnetic fields decrease proportionally to the square of the distance and the decrease of rated voltage with load effected to magnetic field. The magnetic field was detected by 3-axis sensors given correct proximity, but appeared as noise components beyond a distance of 2 cm.

Environmental Effect Analysis of Electromagnetic Induction in Express Electric Railway (고속 전철구간에서의 전력유도 환경 영향 분석)

  • Lee, Sang-Mu;Choi, Mun-Hwan;Cho, Pyung-Dong
    • Journal of The Institute of Information and Telecommunication Facilities Engineering
    • /
    • v.9 no.1
    • /
    • pp.19-23
    • /
    • 2010
  • The Electromagnetic Interference could occur due to power line on the telecommunication service. The Countermeasure is practised by legal law. Various affecting factors are described in the law. In this paper, an effect by pipeline especially in the ground, power feeding plant, and curved railway sector is analyzed as environmental factors which are not included in the law. By the practical measurement, it appears that the measured voltages on the spots with underground pipeline are grouped into lower voltage level, induced voltage tends to be high near power feeding plant, and also in the curved railway line. These analytical results can be meaningly considered in the application of countermeasure.

  • PDF

A Study on the Safety Checking and Testing method of the underground power transmission line (OF Cable) (지중송전선로 안전관리 방안 (OF케이블))

  • Choi, Jong-Soo;Park, Kang-Seo;Jeon, Jun-Man
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2009.10a
    • /
    • pp.429-434
    • /
    • 2009
  • In this paper it was written about the safety management plan for underground power transmission cable, and it guarantees the reliable electric power supply and facility management to prevent an electric disasters according to that. Recently fires which happens on OF Cable lead to a breakdown of power system and cause a power outage of wide area and serious social problems. So it needs an improvement of inspection ability on OF cable as well as a strict inspection system to prevent that problems in advance and it will bring us the development of electric safety management and the reliable electric power supply.

  • PDF

Mechanical Characteristics of Accelerated Flowable Backfill Materials Using Surplus Soil for Underground Power Utilities (굴착 잔토를 재활용한 지중전력구조물 뒷채움재의 역학적 특성)

  • Cheon, SeonHo;Jeong, Sangseom;Lee, DaeSoo;Kim, DaeHong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5C
    • /
    • pp.303-312
    • /
    • 2006
  • This study is to evaluate the mechanical characteristics of flowable backfill and offer a guide line of mixture proportion based on soil types for constructing underground power utilities. Flowable backfill is known as soil-cement slurry, void fill, and controlled low-strength material(CLSM). The benefits of CLSM are reduced equipment costs, faster construction, re-excavation in the future, and the ability to place materials in confined spaces, which are narrow parts or perimeters of underground power cables nearly impossible for compaction. The flowable slurry mixed with 17 soils and 6 accelerated mixtures in the laboratory were evaluated for flowability and unconfined compressive strength to meet the target values of this study.

Analysis of Induced Lightning Surge Phenomena on Underground Power Cables (지중송전케이블 뇌서지 유도현상 분석)

  • Jung, Chae-Kyun;Kang, Yeon-Wook;Kang, Ji-Won;Kim, Doo-Jin;Kim, Jae-Seung;Lee, Dong-Il
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.578-579
    • /
    • 2011
  • This paper describes the analysis of induced lightning surge phenomena at underground power cables under construction when the lightning surge strikes at phase conductor of grounding wire of overhead line in service. Therefore, This paper proposes the optimal protection methods establishment against lightning surge induced from operating transmission.

  • PDF

Surveillance System For Extra High Voltage Cable (초고압 CABLE 감시시스템 연구)

  • Hahn, K.M.;Lee, K.C.;Jeon, S.I.;Kim, C.S.
    • Proceedings of the KIEE Conference
    • /
    • 1992.07b
    • /
    • pp.789-793
    • /
    • 1992
  • For improving the power supply reliability and minimizing maintenance work of E.H.V. underground transmission line, new surveillance systems are strongly desired for use in the field of electric power transmission. For underground installation, high system reliability is required because E.H.V. cables, if an accident happen, can have a serious impact on social activities and human life. In answer to this requirement, applications of optical fiber transmission system have been widely developed in a variety of field. The main function of this system are cable fault location, oil leak detection, and surveillance of the cable circuit and tunnel condition.

  • PDF

Analysis and Estimation of the Transient Thermal Characteristics of OF Cable systems (OF 케이블 계통 과도상태 열특성 해석 및 평가)

  • Kang, Ji-Won;Lee, Dong-Il;Jung, Chae-Kyun;Lee, Jong-Beom
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.10
    • /
    • pp.487-495
    • /
    • 2005
  • This paper reviews the characteristic of thermal and temperature of oil field cable in transient state such as grounding fault and lightning surge. For analysis in various conditions, many actual underground power cable systems are modeled using ATP. These results are applied for the examination of temperature increase when the single line to ground fault by the breakdown of insulation part and hitting of lightning surge are occurred. The inner part temperature of OF cable is analysed according to the various kinds of cable using the thermal model of transient state. The temperature increase of sheath and crossbonded lead bv fault current is also analysed using IEC 60949.

Ananalzing fault current and Protective coordination in the underground line (지중배전선로의 고장전류 크기 및 보호협조분석)

  • Cho, Nam-Hun;Ha, Bok-Nam;Lee, Jung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.932-934
    • /
    • 1998
  • Electric power distribution feeders are susceptible to faults caused by a variety of situations such as adverse weather conditions, tree contacts, equipment failure, accidents, etc. Distribution circuit faults result in a number of problems related to the reliability of service and customer power quality. In the past, the permanent interruption of customer service resulting from a blown fuse or a recloser lockout was the only factor which was used to determine service reliability. So we developed KODAS(Korea Distribution Automation System) with successful and had fieid-testing of Distribution Automation System in last three years at Kang-dong Branch Office. In performing the project, KEPRI has gained valuable experience, through dealing with many difficult problem. This paper is depicted about the circuit breaker coordination problems in the Underground for the Distribution Automation Feeder.

  • PDF