• Title/Summary/Keyword: Underground Information

Search Result 810, Processing Time 0.025 seconds

Application of TBM for Mining and Energy Resources Development (광물과 에너지자원 개발을 위한 TBM 활용사례)

  • Ko, Tae Young;Choi, Sung-Oong
    • Tunnel and Underground Space
    • /
    • v.31 no.6
    • /
    • pp.460-468
    • /
    • 2021
  • A TBM is an equipment that excavates a tunnel with a full face by rotating a circular cutter head and its advantages are fast excavation rate and safe construction. A TBM, which is primarily used for tunnel excavation on civil construction sites, is easily adaptable to information and communication technology. Research related to unmanned and automated technology is being actively pursued. TBM applications for mining and energy resource development in other countries were investigated in this study. The difference of TBM applications between the mining and energy resource development and civil construction sites was examined. Technical factors such as geological conditions, depth, site access, TBM launching, alignment and inclination, TBM size, and others that should be considered when choosing a TBM were investigated. Finally, the advantages and disadvantages of TBM application in mines and the technical requirements for TBM for successful mine application are summarized.

Geophysical Exploration and Well Logging for the Delineation of Geological Structures in a Testbed (실험 부지에서의 지질구조 파악을 위한 물리탐사 및 물리검층)

  • Yu, Huieun;Shin, Jehyun;Kim, Bitnarae;Cho, Ahyun;Lee, Gang Hoon;Pyun, Sukjoon;Hwang, Seho;Yu, Young-Chul;Cho, Ho-Young;Nam, Myung Jin
    • Journal of Soil and Groundwater Environment
    • /
    • v.27 no.spc
    • /
    • pp.19-33
    • /
    • 2022
  • When subsurface is polluted, contaminants tend to migrate through groundwater flow path. The groundwater flow path is highly dependent upon underground geological structures in the contaminated area. Geophysical survey is an useful tool to identify subsurface geological structure. In addition, geophysical logging in a borehole precisely provides detailed information about geological characteristics in vicinity of the borehole, including fractures, lithology, and groundwater level. In this work, surface seismic refraction and electrical resistivity surveys were conducted in a test site located in Namyangju city, South Korea, along with well logging tests in five boreholes installed in the site. Geophysical data and well logging data were collected and processed to construct an 3D geological map in the site.

Introduction to Research Trend of Real-Time Measurement for Wear of TBM Disc Cutter (TBM 디스크커터의 마모량 실시간 계측을 위한 연구현황)

  • Min-Sung, Park;Min-Seok, Ju;Min-Sung, Cho;Jun, Lee;Jung-Joo, Kim;Hoyoung, Jeong
    • Tunnel and Underground Space
    • /
    • v.32 no.6
    • /
    • pp.478-490
    • /
    • 2022
  • TBM disc cutter, which is the main cutting tool of tunnel boring machine (TBM), is replaced when it is excessively worn during the boring process. Disc cutters are usually monitored by workers at cutterhead chamber, and they check the status and wear amount of cutters. Because cutterhead chamber is usually in dangerous circumstance due to high pressure and instability of excavation surface, the measurement by manpower occasionally results in inaccuracy of measurement result. In order to overcome the limitations, the real-time disc cutter monitoring techniques have been developed in some foreign countries. This paper collected the current status of disc cutter monitoring system from the literature. Several types of sensors are used to measure the cutter wear, and it is believed that the collected information can be useful reference when similar domestic technologies are developed in the future.

Research Trend of Real-Time Measurement for Acting Force of TBM Disc Cutter (TBM 디스크커터의 실시간 하중 계측을 위한 연구현황)

  • Gyeongmin Ki;Jung-Joo Kim;Hoyoung Jeong
    • Tunnel and Underground Space
    • /
    • v.33 no.4
    • /
    • pp.244-254
    • /
    • 2023
  • The disc cutter mounted on the Tunnel Boring Machine (TBM) is subjected to cutting forces in three dimensions during rock excavation process. It is widely known that the cutting forces increased with the strength of the rock mass, while the rolling force can be significantly increased when the disc cutter encounters abnormal rotation. Therefore, the cutting force acts on the disc cutter provides important information because it represents the conditions of the rock mass and the disc cutter. For these reasons, several studies have been conducted to measure the cutter forces in real-time. This paper introduces the current status of research on the cutter force measurement of TBM disc cutters, which has been reported in the literature. It is judged that this paper can be a useful reference material when similar technologies are developed in Korea in the future.

A Study on the Automated Algorithm for Legal Calculation of Weighted Average of Building Surface - Based on Rhino Grasshopper Using Digital Topographic Map Data - (건축물 지표면 가중평균 법정산정 자동화 알고리즘에 관한 연구 - 수치지형도 데이터를 이용한 Rhino Grasshopper 중심으로 -)

  • Choi, Se-Yeong;Song, Seok-Jae;Kim, Yong-Seong
    • Journal of KIBIM
    • /
    • v.13 no.2
    • /
    • pp.1-15
    • /
    • 2023
  • Since the 1960s, the Korean Peninsula, which consists of 77.4 of the country's land and mountains, has seen a surge in demand for buildings due to population concentration due to urbanization and industrialization. Since then, the development of slopes has been inevitable due to the concentration and expansion of the city's population. When building a building on a slope, it is important to set the height of the surface. In this case, the means of regulating buildings in construction-related laws, such as the building closure ratio, floor area ratio, number of floors and total floor area of buildings, have an overall effect on buildings through the height of the surface. In the Korean Building Act, the setting of the height of the ground affects the calculation of the building height limit standard and the calculation of the underground floor, and it takes a long time to calculate. Therefore, the time required for attempts to change various design plans of buildings increases. The purpose of this study is to speed up the time required to calculate the weighted average of the surface when constructing buildings on slopes. In addition, the existing calculation process allows various design attempts compared to the same time given.

A Study on the Effective Selection of Tunnel Reinforcement Methods using Decision Tree Technique (의사결정트리 기법을 이용한 터널 보조공법 선정방안 연구)

  • Kim, Jong-Gyu;Sagong, Myung;Lee, Jun S.;Lee, Yong-Joo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4C
    • /
    • pp.255-264
    • /
    • 2006
  • The auxiliary reinforcement method is normally applied to prevent a possible collapse of the tunnel face where the ground condition is not favorable or geologic information is not sufficient. Recently, several engineering approaches have been made to choose the effective reinforcement methods using expert system such as neural network and fuzzy theory field, among others. Even if the expert system has offered many decision aid tools to properly select the reinforcement method, the quantitative assessment items are not easy to estimate and this is why the data mining technique, widely used in the field of social science, medical treatment, banking and agriculture, is introduced in this study. Using decision tree together with PDA, the decision aids for reinforcement method based on field construction data are created to derive the field rules and future study will be concentrated on the application of the proposed methods in a variety of underground development cases.

Examining the Influence of TBM Chamber Condition and Transmission Distance on the Received Strength of Bluetooth Low Energy Signals: A Laboratory Simulation Experiment (TBM 챔버 상태와 전송 거리에 따른 저전력 블루투스 신호의 수신 강도 분석: 실험실 모사 실험)

  • Yosoon Choi;Hoyoung Jeong;Jeongju Kim
    • Tunnel and Underground Space
    • /
    • v.33 no.5
    • /
    • pp.425-434
    • /
    • 2023
  • To measure the wear amount of the TBM disk cutter in real time, it is important not only to automate the measurement using sensors, but also to stably transmit the measured data to the information processing system. In this study, we investigated the viability of utilizing Bluetooth Low Energy (BLE) technology to wirelessly transmit sensor data from the TBM cutter head to a receiver located at the chamber's rear. Through laboratory experiments, we analyzed the Received Signal Strength Index (RSSI) of the receiver considering various signal strength of the transmitter, separation distances between the transmitter and receiver and chamber fill materials. Our results demonstrate that wireless data transmission is feasible across all tested conditions when the transmitter signal strength is 0 dBm or higher.

Study of Continuous Monitoring for Underground and Geotechnical Structures using Accelerometers (가속도계를 활용한 지하 및 지반구조물 상시 계측 방안에 관한 연구)

  • Gunwoong Kim
    • Journal of the Korean Geosynthetics Society
    • /
    • v.23 no.2
    • /
    • pp.19-27
    • /
    • 2024
  • Geotechnical structures such as dams, tunnels, and slopes require regular inspection and monitoring to ensure stability. Domestically, drones and accelerometers have become common tools for inspecting and monitoring various structures. However, drones have difficulty identifying internal changes in structures and the subsurface, and accelerometers generally serve for seismic design or strain measurement purposes. Therefore, this paper proposes to utilize accelerometers to monitor the internal information of the ground on a real-time or periodic basis. The proposed method utilizes a part of the analysis technique from the SASW test to monitor the stability and state changes of geotechnical structures. Cases where SASW was used to evaluate the safety of geotechnical structures, such as slopes, dams, and tunnels, were reviewed to verify the suitability of the technology. To make the proposed method more practical, the study considered using only the first-step analysis to derive the dispersion curve rather than the second-step analysis to determine the shear wave velocity profile, which requires complex analysis. The proposed technique is expected to enable the continuous monitoring and inspection of geotechnical structures by utilizing accelerometers.

Development and Performance Evaluation of Real-Time Wear Measurement System of TBM Disc Cutter (TBM 디스크 커터 실시간 마모계측 시스템 개발 및 성능검증)

  • Min-Seok Ju;Min-Sung Park;Jung-Joo Kim;Seung Woo Song;Seung Chul Do;Hoyoung Jeong
    • Tunnel and Underground Space
    • /
    • v.34 no.2
    • /
    • pp.154-168
    • /
    • 2024
  • The Tunnel Boring Machine (TBM) disc cutter is subjected to wear and damage during the rock excavation process, and the worn disc cutter should be replaced on time. The manual inspection by workers is generally required to determine the disc cutter replacement. In this case, the workers are exposed to dangerous environments, and the measurements are sometimes inaccurate. In this study, we developed a technology that measures the disc cutter wear in real time. From a series of laboratory tests, a magnetic sensor was selected as the wear sensor, and the real-time disc cutter measurement system was developed integrating wireless communication modules, power supply and data processing board. In addition, the measurement system was verified in actual TBM excavation circumstances. As a result, it was confirmed that the accuracy and stability of the system.

A Study on the Development of an Effective GIS Data Maintenance Plan -Focused on the Applications for Municipalities (효율적인 GIS 데이터 유지관리 방안의 개발에 관한 연구 - 지방자치단체를 중심으로 -)

  • Kim, Seong-Hoon
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.13 no.1 s.31
    • /
    • pp.89-96
    • /
    • 2005
  • As the number of the municipalities which have finished the phase I of their GIS system development projects increases, it is very natural that GIS system operation and maintenance rather than development itself has been a more important concern for these municipalities. It seems to me that these phenomena will be amplified as time goes by, and this is the right time for a series of proper guidelines regarding the GIS system maintenance to be supplied to the related municipalities. The subject which is called as 'GIS maintenance' is surely a very comprehensive area. It has been also founded that the necessity is widely agreed among the concerned people working for the municipalities which have already finished their first GIS projects. Nevertheless, it has been investigated that the studies done up to now in this area is in a very infant state from the quality and also quantity points of views. This paper, therefore, makes one of the very initial trials for the systematical GIS maintenance. Among the areas of GIS maintenance, the GIS database maintenance has been selected as the first trial area because of its natural characteristics of the basic element composing IS(Information System). For this, the present conditions of a variety of municipalities have been investigated as far as GIS maintenance is concerned, and the results are analyzed to produce a series of useful outcomes in terms of facing problems and accompanied plans. For each problem, a solution is defined and for each solution a detailed action plan (item) is derived. For each of the two kinds of GIS data given which are the fundamental map and the underground facilities map, an effective GIS data maintenance plan is suggested for the concerned municipalities.

  • PDF