• 제목/요약/키워드: Underground Construction

검색결과 1,899건 처리시간 0.027초

기존 지하 Box 근접 굴착공사 현장의 계측결과를 이용한 역해석 및 보강방안의 적용 사례 (A Case Study on the Feed-Back Analysis and the Reinforcement Plan using the Measurement Data of Excavation Site close to the Existing Underground Box)

  • 이정희;노원석;정순익;김완종
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.445-456
    • /
    • 2010
  • Massive underground excavation can be carried out recently due to the technical development of the excavation for retaining wall. Feed-back analysis using field measurement results is recommended to secure the stability of the construction because calculated values at stages of the design and the construction are uncertain. Reinforcement plan should be established based on the result of it. This study deals with the underground excavation site, which is under construction and is close to structure(subway) at downtown area. The result of feed-back analysis on the measurement data of displacement at multi-soil layers was reflected to make a plan for safe construction. This case study can be useful information for contingency plan on abnormal displacement which can be occurred at similar underground excavation.

  • PDF

3차원 지하시설물 가공 및 부분갱신 자동화 기술개발 - 지하공간통합지도 중심으로 - (Development of 3D Underground Utilities Processing and Partial Update Automation Technology - Focused on 3D Underground Geospatial Map -)

  • 이민규;최성식;전흥수;김성수
    • 한국지리정보학회지
    • /
    • 제23권4호
    • /
    • pp.1-15
    • /
    • 2020
  • 도시가 확장되고 지하시설물 관련 공사가 늘어남에 따라 지하시설물 관로 네트워크를 3차원으로 분석할 수 있는 기술이 절실히 요구되고 있다. 국내에서는 2015년부터 15종의 지하정보(지하시설물, 지하구조물, 지반)를 3차원 기반 지하공간통합지도로 구축하는 사업을 진행하고 있다. 하지만 현재 3차원 지하시설물 구축은 수작업 기반으로서 구축 방법이 매우 복잡하고 지자체별 수백만 건이 넘는 대용량 데이터를 처리하기에는 시간과 비용이 많이 발생한다. 본 논문은 3차원 지하시설물 모델의 가공 및 갱신 자동화 구축 프레임워크를 제시함으로써 3차원 지하시설물 모델을 최소비용으로 신속하게 구축하는 방안을 수립하였다. 본 연구에서 개발된 지하시설물 가공 및 부분갱신 자동화 기술들은 지하공간통합지도 구축사업에 즉시 현장적용이 가능할 것으로 기대한다.

도심지 근접시공의 자동계측응용 (Application of Automated Measuring System for the Underground Construction in Urban Area)

  • 남순성;정상용
    • 화약ㆍ발파
    • /
    • 제15권2호
    • /
    • pp.53-72
    • /
    • 1997
  • It is impossible to precat the behavior of ground soil and structure accurately during underground construction in urban area or excavation in soft ground area because of difference between the assumed design condition and the actual site condition. Therefore, it must be managed by measuring system and correct the difference by real data. Large scale under ground construction in urban area like a seoul subway project has needed for Intelligent Construction technique, a field of the Engineering Contractor. The automated measuring system is developed for the technique. It is described that the procedure and the method of measuring work with application of the automated measuring system.

  • PDF

웹기반 GIS를 이용한 지하시설물 통합 시스템 구축 (The construction of Underground Facility Unification System Using Web Base GIS)

  • 강준묵;강영미;이강원
    • 한국측량학회:학술대회논문집
    • /
    • 한국측량학회 2003년도 추계학술발표회 논문집
    • /
    • pp.287-290
    • /
    • 2003
  • The base composition for a construction information union and application is insufficient, because the existent information driving for the underground facility is separately promoted from management organization. This Study is to analyze a accuracy by converting pre-constructive underground facility database to the unification database of digital map base and improve the accuracy for a field surveying. moreover, These results is to construct the information common system of web base GIS by jointing internet technology.

  • PDF

일본의 지하철 건설설계실례 (The Subway Construction Design of Japan)

  • 이동경희;세소융지
    • 화약ㆍ발파
    • /
    • 제9권2호
    • /
    • pp.8-12
    • /
    • 1991
  • The Land price in Tokyo Vicinity was, increased 65.3% than Last year. so, it trend to get Subway constructed in deeper Underground. But, the subway Construction Cost is more increaseel beeause it is needed long works term, all modernized facilities beside that, deeper subway cocstruction works brought another task such as deeper entrance shaft sinking, Ventilation escapeway, all Underground water Treatment. In addition, Civil Act must be also amended became at Present landowner covers ground and Underground.

  • PDF

지하주차장의 내화성능 평가를 위한 차량연소실험 (The combustion test of assuming in parking space for fire resistance)

  • 강승구;김동준;이재영;原田和典;권영진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.48-50
    • /
    • 2013
  • In this study, Car fire for test using ISO 9705 10MW Large Scale Calorimeter. Especially, study on the underground parking for the fire resistance performance. The underground parking lot of the fire resistance regulations in according to with the standard heating curve in Korea. Because of this burning car through experiments to the propose a new heating curve.

  • PDF

초고층 및 지하연계 복합건축물 피난유도 시스템의 국외 사례 분석 연구 (A Study on the Overseas Case Analysis of Evacuation Guidance System for High-rise and Underground Complexes )

  • 최병윤;김동오;서정완;강부성
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.117-118
    • /
    • 2023
  • This study is a basic research study to establish an effective evacuation guidance system in case of fire in high-rise and underground-linked complex buildings. As a result of the analysis of overseas cases, it is judged that it is necessary to develop an evacuation guidance system using artificial intelligence.

  • PDF

무선통신 및 위치인식 통합기술을 활용한 지하구조물 현장지원시스템 최적 요소기술 연구 (A Study on Optimal Technical Factors of USFSS Based on Integrated Technique of Wireless Communication and Location Awareness)

  • 장용구;정재형;이준우;김현수
    • 한국지리정보학회지
    • /
    • 제12권4호
    • /
    • pp.48-58
    • /
    • 2009
  • 최근 들어, 건설시공에 있어서 현장 내 작업자의 안전관리는 중요하게 인식되고 있다. 특히, 터널, 공동구 등 지하구조물에서는 건설 중 붕괴사고가 빈번하게 발생하고 있어 그 중요성이 더욱 강조되고 있다. 하지만, 지하구조물의 특성상 유 무선 통신환경의 구현이 매우 어렵기 때문에 위험사고 발생 시 구조를 위한 현장투입요원과 구조자의 위치추적 및 음성통신이 어려워 구조작업에 많은 어려움이 발생하고 있다. 본 연구에서는 지하구조물 시공시 건설시공의 열악한 환경에 적합하고 작업자의 3차원 위치추적 및 통신 연락이 가능한 무선통신 및 위치인식 통합기술 기반의 지하구조물 현장지원시스템에 대한 최적의 요소기술을 도출하였다.

  • PDF

노후 상하수관 주변지반의 소규모 지하공동 형상 특성을 고려한 수치해석에 관한 연구 (A numerical study on the characteristics of small underground cavities in the surrounding old water supply and sewer pipeline)

  • 안준상;강경남;송기일;김병찬
    • 한국터널지하공간학회 논문집
    • /
    • 제20권2호
    • /
    • pp.287-303
    • /
    • 2018
  • 최근 한국에서는 지반함몰(ground subsidence) 현상이 자주 발생하고 있다. 이에 정부에서는 지하안전관리에 관한 특별법을 제정하였고, 2018년 1월 1일부터 법이 시행될 예정이다. 이 법에 의하면, 지하 굴착 시 지하안전영향 평가를 수행해야 하며, 이후에도 주기적으로 지구물리탐사 기법을 통해서 지하공동의 발생 유무를 조사하여야 한다. 지하공동 발견 시에는 수치해석을 통해서 지하안전성을 평가하도록 규정하였다. 하지만, 발견된 지하공동을 수치적으로 모델링하는 방법이 정해지지 않아서 논란의 여지가 있다. 본 연구에서는 지하공동의 형상 및 지표로부터 지하공동까지의 깊이에 따른 영향을 연속체 해석 프로그램을 사용해서 검토하였다. 본 연구를 통해서 지하공동의 형상을 수치모델링에 반영하는 방법을 제시하였고, 지하공동의 형상 및 깊이와 전단강도감소기법으로 산정된 안전율과의 관계를 제시하였다. 본 연구의 결과는 지하안전영향평가에 관한 기초 자료가 될 수 있을 것으로 판단된다.

Top Down 선기둥의 지지력 산정방법에 관한 연구 (Study on Load Carrying Capacity of Top Down Prefounded Columns)

  • 황희선;임홍철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 춘계학술논문 발표대회 제6권1호
    • /
    • pp.137-140
    • /
    • 2006
  • As underground construction is a large component of the cost of construction and a term of works in Top-Down construction, it is important to reduce the term of works in underground construction. The purpose of this study is to analyse buckling stress and load of prefounded columns as the process of excavation is changed, and propose a suitable process of excavation to increase the speed of works. When several floors are excavated, the valid buckling length of profounded column is increase and allowable buckling stress is decreased. The result shows that all columns are safe in buckling down to B3th story whether 2 stories or 3 stories are excavated straightly. However, several columns are not safe from B4th story when 2 or 3 stories are excavated straightly. With these results, a process can be designed that first B3 stories are excavated straightly, and then excavate B4th story putting concrete on B1st and B2nd story.

  • PDF