An enhanced control strategy for variable-speed unbalanced stand-alone doubly-fed induction generator-based wind energy conversion systems is proposed in this paper. The control scheme is applied to the rotor-side converter to eliminate stator voltage imbalance. The proposed current controller is developed based on the proportional-resonant regulator, which is implemented in the stator stationary reference frame. The resonant controller is tuned at the stator synchronous frequency to achieve zero steady-state errors in rotor currents without decomposing the positive and negative sequence components. The computational complexity of the proposed control algorithm is greatly simplified, and control performance is significantly improved. Finally, simulations and experimental results are presented to verify the feasibility and the robustness of the proposed control scheme.
This paper presents an efficient algorithm for determining the location, size and number of capacitors in unbalanced radial distribution system. The objective function formulated consists of two terms: cost for energy loss and cost related to capacitor purchase and capacitor installation. The cost function associated with capacitor placement is considered as step function due to banks of standard discrete capacities. Genetic algorithms(GA) are used to obtain the population is derived. The strings in each population consist of the bus number index and size of capacitors to be installed. In order to determine the number of capacitor placement, the length mutation operator is used. Its efficiency is proved through the application in unbalanced radial distribution systems made of 10 buses with 9 distribution lines and 25 buses with 24 distribution lines.
The railway characteristic, which is concerned, as most utilities is unbalance produced by the large single-phase loads. Here are two theoretical concerns associated with unbalanced loads. First, generator rotor heating resulting from unbalanced current flow, Second, there is the possibility of motor overheating in industrial plants, due to the unbalanced voltage. Therefore, the exact assessment of the voltage unbalance must be carried out preferentially as well as load forecast at stages of designing and planning for the electric railway system. This paper proposes a new analysis model to more effectively estimate voltage unbalance. Numerous distributed circuits in the electric railway system are composed by components. The entire system can be easily modeled by the combination of four-port representation of each component in parallel and/or series. Simulation results using the model are compared with field data, and it verifies the accuracy of the proposed model.
DSTATCOM(distribution static compensator) is one of the custom power devices, and protects a distribution line from unbalanced and harmonic current caused by non-linear and unbalanced loads. Researches about DSTATCOM are mainly divided two parts, one is the calculation of compensation current and the other part is the current control. Conventional researches use a LPF(low pass filter) to eliminate ripple component at the calculation of compensation current. But this method has a problem that LPF's characteristics restrict the compensation performance of instantaneous active and reactive power. This paper proposes a calculation of compensation current using state observer that can be a counterproposal of conventional methods using LPF. Improved performance of instantaneous active and reactive power compensation was shown by experiments.
Power grids are large complicated networks in use around. An absolute phase value for a particular unknown-phase line at a local site should be identified for the operation and management of a 3-phase distribution network. The phase shift for a specific point in the line, as compared with a phase reference point at a substation, must be within a range of ${\pm}60^{\circ}$ for correct identification. However, the phase shift at a particular point can fluctuate depending on the line constants, transformer wiring method, line length, and line amperage, etc. Conducted in this study is a theoretical formulation for the determination of phase at a specific point in the line, Simulink modeling, and analysis for a distribution network. In particular, through evaluating the effects of unbalanced current loads, the limitations of the present phase identification methods are described.
This paper presents an effective rotor current controller for variable-speed stand-alone doubly fed induction generator (DFIG) systems feeding an unbalanced three-phase load. The proposed current controller is developed based on proportional plus two resonant regulators, which are tuned at the positive and negative slip frequencies and implemented in the rotor reference frame without decomposing the positive and negative sequence components of the measured rotor current. In addition, the behavior of the proposed controller is examined in terms of control performance and stability with respect to rotor speed variations, i.e., slip frequency variations. Simulations and experimental results are shown to validate the robustness and effectiveness of the proposed control method.
Neutral line current is analyzed by the neutral line CF in nonlinear load balanced and unbalanced conditions. The worst nonlinear load condition is nonlinear balanced load condition, and It is below CFNL=1.194 that a neutral line current could not excess the rated value
플랫 플레이트 구조의 외부접합부는 편심전단에 대해 비대칭형의 위험단면을 가지고 있으며, 위험단면의 길이가 내부접합부 보다 작고 중력하중과 횡하중 모두에 의해 편심전단응력이 발생하게 되므로 뚫림전단파괴에 대해 대단히 취약하다. 외부접합부의 거동은 대단히 복잡하며 또한 구조해석에서 사용하고 있는 강도모델이 부적합하기 때문에, 현 설계기준은 실험결과를 정확히 설명하고 있지 못하다. 본 연구에서는 이러한 현 설계기준의 미비점을 보완하기 위하여 슬래브-기둥 외부접합부에 대해 비선형유한요소해석을 수행하였다. 외부접합부에서는 횡하중의 재하방향에 따라 거동 및 최대강도가 상이하며, 해석결과에 근거하여 하중재하방향 별로 외부접합부에 대한 강도모델을 제안하였다. 제안된 강도모델은 실험결과와의 비교를 통해 검증되었다.
This paper presents assessment of possibility on the human risk for the electromagnetic field of unbalanced two coupled three-phase transmission line using fuzzy theory. Three phase load flow program was developed which employed a Newton-Raphson method as a tool to analyze system unbalanced. This research presents a method of handling two coupled three phase transmission system unbalance analysis and unbalanced power demand as a function of voltages. As the results of case study, in case of 345[kV] T/L, the electric field intensity was 10.9540[kV/m], magnetic field intensity was 0.2567[G] in severest case. The results showed that the membership of a proposition fuzzy '10.9540 [kV/m] is hazardous' is 0.6349. As the analytic results using the fuzzy qualifier term, the membership in case of very false is 0.1379 and fairly false is 0.6124, respectively. In assessment of fuzzy measure possibility for the electromagnetic field, this paper used probability of fuzzy arid measure of fuzziness technique.
Mahendran, G.;Sathiskumar, M.;Thiruvenkadam, S.;Lakshminarasimman, L.
Journal of Electrical Engineering and Technology
/
제8권2호
/
pp.215-222
/
2013
Electrical power distribution systems are critical links between the utility and customer. In general, power distribution systems have unbalanced feeders due to the unbalanced loading. The devices that dependent on balanced three phase supply are affected by the unbalanced feeders. This necessitates the balancing of feeders. The main objective of reconfiguration is to balance the loads among the phases subject to constraints such as load flow equations, capacity and voltage constraints and to reduce the real power loss, while subject to a radial network structure in which all loads must be energized. Therefore, the distribution system reconfiguration problem has been viewed as multi-objective problem. In this paper, the hybrid heuristic algorithm has been used for reconfiguration, which is the combination of fuzzy and greedy algorithms. The purpose of the introduction of greedy is to refrain the searching for the period of phase balancing. The incorporation of fuzzy helps to take up more objectives amid phase balancing in the searching. The effectiveness of the proposed method is demonstrated through modified IEEE 33 bus and modified IEEE 125 bus radial distribution system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.