• Title/Summary/Keyword: Turbine Performance Test

Search Result 448, Processing Time 0.024 seconds

Optimization of Micro Hydro Propeller Turbine blade using NSGA-II (NSGA-II를 이용한 마이크로 프로펠러 수차 블레이드 최적화)

  • Kim, Byung-Kon
    • The KSFM Journal of Fluid Machinery
    • /
    • v.17 no.4
    • /
    • pp.19-29
    • /
    • 2014
  • In addition to the development of micro hydro turbine, the challenge in micro hydro turbine design as sustainable hydro devices is focused on the optimization of turbine runner blade which have decisive effect on the turbine performance to reach higher efficiency. A multi-objective optimization method to optimize the performance of runner blade of propeller turbine for micro turbine has been studied. For the initial design of planar blade cascade, singularity distribution method and the combination of the Bezier curve parametric technology is used. A non-dominated sorting genetic algorithm II(NSGA II) is developed based on the multi-objective optimization design method. The comparision with model test show that the blade charachteristics is optimized by NSGA-II has a good efficiency and load distribution. From model test and scale up calculation, the maximum prototype efficiency of the runner blade reaches as high as 90.87%.

Wind Analysis and Site Assessment for Test Site of 3MW Wind Power System (3MW 풍력발전시스템 개발품의 육상풍력실증단지 조성 타당성 평가를 위한 풍황 및 지형평가 연구)

  • Woo, Sangwoo;Lee, Ki-Hak;Lee, Sang-Il;Park, Jong-Po
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.11a
    • /
    • pp.35.2-35.2
    • /
    • 2011
  • A wind turbine power performance test is very important to wind turbine manufacturers because a wind farm developer or planner must want to define power performance characteristics and reliability of new wind turbines. Based on the IEC 61400-12-1, A wind turbine test site has to be nicely installed at flat terrain for testing. We are developing the wind power system which is IEC wind class IIa model with rated power of 3MW. KEPCO's Gochang power testing center was considered as candidates to build the test site without site calibration. This paper aims to verify the validity of the test site by using implement site assessment result that was based on IEC 61400-12-1.

  • PDF

Performance evaluation facilities and evaluation methods for hydropower equipment (해외 수력발전설비 성능평가설비 및 평가 방법)

  • Kim, Youngjoon;Kim, Yongyeol;Cho, Yong;Ko, Jaemyoung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.194-194
    • /
    • 2010
  • The variable demand on the energy market, as well as the limited energy storage capabilities, requires a great flexibility in operating hydraulic turbines. But, present in Korea, the absence of testing laboratories and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic hydropower machines, A performance guarantees for hydro turbines shall be contain, as a minimum, guarantees covering power, discharge and specific hydraulic energy, efficiency, maximum momentary overspeed and maximum momentary pressure and/or maximum steady-state runaway speed, as well as guarantees related to cavitation. Performance test are conducted by the test standard. Test codes based on extensive research data are written under the leadership of an IEC. Performance evaluation is carry out several test(performance test, cavitation test and runaway test). The paper presents the international turbine test laboratory and performance test standard.

  • PDF

Present Status and Further Development of Performances of Industrial Gas Turbine Engine Turbogreen 1200

  • Min, Daiki;Bograd, Alexander M.
    • 유체기계공업학회:학술대회논문집
    • /
    • 1998.12a
    • /
    • pp.191-197
    • /
    • 1998
  • The recent results of the engine development performed in this you on Turbogreen 1200, the first industrial gas turbine engine developed in Korea, are presented. In order to improve the engine performance and structural stability from the first prototype engine, several variants of the engine and major components such as combustor and rotor assembly have been developed and tested. This paper shows these results especially focused on the engine test and performance analysis, in which test system, instrumentation and data processing are discussed as well. The engine performance and its trend give relatively good coincidence with the design ones. At design power of 1.2MW, the thermal efficiency of the engine is estimated over $25\%$ which is below the design target of $27.2\%$. This gap of efficiency is caused mainly by large tip clearance between turbine blades and casing. Considering high design efficiency superior to those of other competitive engines in this power class, Turbogreen 1200 would have a strong competition in its performance if the design efficiency is achieved by further developments such as tip clearance control, which are very possible and natural in final mass production of the developed gas turbine engine.

  • PDF

A Study on the Uncertainty Propagation of Measured Parameters on the Turbine Performance Test (터빈성능시험에서 측정변수의 불확도 파급에 관한 연구)

  • Kim,Eun-Jong;Jo,Su-Yong
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.31 no.8
    • /
    • pp.107-114
    • /
    • 2003
  • The effect of uncertainties caused by measured parameters, which are propagated to the uncertainty of total-to-total efficiency, are analyzed from a turbine performance test. The degree of reaction is 0.373 at the mean radius on a tested 3-D axial type turbine, and the performance test is conducted at the low pressure and cold temperature status. The uncertainty of turbine inlet and exit total pressure shows the strong propagation effect to the uncertainty of total-to-total efficiency. This means that a high precision pressure measuring system is required to reduce the uncertainty propagated by the pressure. In the uncertainty portion of each measured parameters to the uncertainty of total- to-total efficiency, the uncertainty by torque is the highest and the uncertainty by RPM is the lowest. In case of the total pressure, the effect of the uncertainty by torque is increased with the increasing RPM. The uncertainty of total pressure at the turbine exit is more important than that at the turbine exit.

Turbine Performance Experiments for the Turbopump of a Liquid Rocket Engine

  • Lee, Hanggi;Shin, Juhyun;Jeong, Eunhwan;Choi, Changho
    • International Journal of Aerospace System Engineering
    • /
    • v.3 no.1
    • /
    • pp.25-29
    • /
    • 2016
  • This paper highlights the performance of an impulse turbine which is a part of turbopump in a liquid rocket first stage engine. The turbopump, currently under development at Korea Aerospace Research Institute, has an impulse type turbine with 12 nozzles and a single rotor. The impulse turbine can archive high specific power with the low gas flow rates. The supersonic impulse turbine with a single rotor can make a simple structure. High-pressure gases are converted into the dynamic energy with flows through the 12 nozzles and drive the rotor to make the power for the pumps. The turbine test was performed in the high-pressured turbine test facility with air gas instead of burned gas. A hydraulic dynamometer was used to absorb the power from the turbine and control the rotational speed and torque. The test points were at several pressure ratios with 7 different rotational speeds. Results showed the efficiency was highest at the design pressure ratio. The efficiency was insensitive to the pressure ratio variation than the rotational speed. It was a typical characteristic in an impulse turbine.

Conceptual Design Study of a Low-Speed Wind Tunnel for Performance Test of Wind Turbine (풍력터빈 성능시험을 위한 풍동 개념연구)

  • Kang, Seung-Hee;Choi, Woo-Ram;Kim, Hae-Jeong;Kim, Yong-Hwi
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.431-434
    • /
    • 2009
  • Conceptual study of an open-circuit type low-speed wind tunnel for test of wind turbine blade is conducted. The tunnel is constituted of a settling chamber, a contraction, closed and open test sections, a diffuser, two corners, a cross leg and a fan and motor. For the performance test, the closed test section width of 1.8 m, height of 1.8 m and length of 5.25 m is selected. The open test section with dimension width of 1.8 m, height of 1.8 m and length of 4.14 m is adopted for aeroacoustic test. The contraction ratio is 9 to 1 and maximum speed in the closed test section is 67 m/sec. Input power in the tunnel is about 238 kW and its energy ratio is 3.6. The wind tunnel designed in present study will be an effective tool in research and development of wind turbine.

  • PDF

Hydraulic Efficiency measurement of small turbine and example of it's analysis (소수력수차의 효율측정과 분석사례)

  • Kim, Eung-Tae;Jung, Yong-Chea;Park, Jang-Won
    • 유체기계공업학회:학술대회논문집
    • /
    • 2005.12a
    • /
    • pp.748-756
    • /
    • 2005
  • The Purpose of this writing is a presentation of small turbine efficiency measuring method, applicable new technology, and several analysis result for real turbine. Measurement methods of hydraulic efficiency written in here are extracted from small turbine applicable international code(IEC, ASME). It includes brief synopsis of 'Current meter method' and 4 other methods and ASFM as a new small turbine applicable technology. And several analysis of test result are for recently performed domestic small turbine result in korea. Through this presentation of extracted code, I hope that it make other small turbine concerner be familiar to perform an efficiency test. for small turbine. And, some analysis of that, make other to feel the importance of efficiency test.

  • PDF

Hot Test of a Turbopump for a Liquid Rocket Engine (액체로켓엔진용 터보펌프의 고온 성능시험)

  • Hong, Soon-Sam;Kim, Dae-Jin;Kim, Jin-Sun;Kim, Jin-Han
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.33 no.12
    • /
    • pp.933-938
    • /
    • 2009
  • Hot test of a full-scale turbopump for a 30-ton-thrust liquid rocket engine was carried out. The turbopump is composed of an oxidizer pump, a fuel pump, and a turbine on a single shaft. Model fluid was used in the test, that is, hot air for the turbine and water for the pumps. The turbopump was operated stably at full speed for 120 seconds. In terms of performance characteristics of pumps and turbine, the results from the turbopump assembly test are compared with those from the turbopump component tests which were performed at about half of the design rotational speed.

A Power Quality Monitoring of The Grid-connected Wind Turbine in Daegwallyeong Test Site (계통 연계 대관령 풍력실증단지에서의 전력 품질 모니터링)

  • Kwon H. J.;Kim K. H.;Jang S. I.;Yoo N. S.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.1513-1515
    • /
    • 2004
  • This paper describe the power quality monitoring results of the grid-connected wind turbine generator in Daegwallyeong Test Site. The power quality monitoring for grid-connected wind turbine generators are important to verify their performance as the grid-connected generators. In order to measure the impacts on the grid of wind turbine generator and evaluate the performance by analyzing electrical parameters, we equipped the power quality monitoring system in the real field of the Daegwallyeong test site. The developed monitoring system gathers information by remote access through the internet. The monitoring results and the detail explanation for the developed wind turbine monitoring system is presented in the study.

  • PDF