EGR Effects on Exhaust Gas of Heavy-Duty Turbo Charge Engine with Low Pressure Route System (저압방식을 적용한 대형과급기관의 배기가스에 관한 EGR효과)

  • 오용석
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.3 no.1
    • /
    • pp.58-62
    • /
    • 2002
  • The efforts of EGR on performance and emissions were investigated in this study. The engine used for the tests was a six-cylinder, 11 liter, and turbo-charged, heavy-duty diesel engine with a low pressure route ECR system. The volume of recirculated gas was controlled by a manually operated valve which was installed between the turbine outlet and compressor inlet. The experiments were performed at various engine speeds and loads while the ECR rates were set at 4% and 8%. Exhaust emissions with EGR system were compared with the baseline emissions.

  • PDF

Performance Analysis of a 3 Pressured Combined Cycle Power Plant (3압 복합 발전 플랜트 사이클에 대한 성능해석)

  • Kim, S. Y.;K. S. Oh;Park, B. C.
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.2 no.2
    • /
    • pp.74-82
    • /
    • 1998
  • Combined cycle power plant is a system where a gas turbine or a steam turbine is used to produce shaft power to drive a generator for producing electrical power and the steam from the HRSG is expanded in a steam turbine for additional shaft power. The temperature of the exhaust gases from a gas turbine ranges from $400{\sim}650^{\circ}C$, and can be used effectively in a heat recovery steam generator to produce steam. Combined cycle can be classed as a topping and bottoming cycle. The first cycle, to which most of the heat is supplied, is a Brayton gas turbine cycle. The wasted heat it produces is then utilized in a second process which operates at a lower temperature level is a steam turbine cycle. The combined gas and steam turbine power plant have been widely accepted because, first, each separate system has already proven themselves in power plants as an independent cycle, therefore, the development costs are low. Secondly, using the air as a working medium, the operation is relatively non- problematic and inexpensive and can be used in gas turbines at an elevated temperature level over $1000^{\circ}C$. The steam process uses water, which is likewise inexpensive and widely available, but better suited for the medium and low temperature ranges. It therefore, is quite reasonable to use the steam process for the bottoming cycle. Recently gas turbine attained inlet temperature that make it possible to design a highly efficient combined cycle. In the present study, performance analysis of a 3 pressured combined cycle power plant is carried out to investigate the influence of topping cycle to combined cycle performance. Present calculation is compared with acceptance performance test data from SeoInchon combined cycle power plant. Present results is expected to shed some light to design and manufacture 150~200MW class heavy duty gas turbine whose conceptual design is already being undertaken.

  • PDF

Development of Distributed Micro Turbine Co-generation System (분산형 마이크로 터빈 열병합 발전시스템 개발)

  • Kwon, Gi-Hun;Kim, Seung-Woo;Lee, See Woo
    • 유체기계공업학회:학술대회논문집
    • /
    • 2002.12a
    • /
    • pp.320-327
    • /
    • 2002
  • In concert with the growing emphasis placed on distributed power generation there will be a need, in the first decade of the 21th century, for a compact thermal energy system capable of providing the total energy needs of individual homes. A natural gas fueled co-generation micro-turbine with ultra low emission will meet this need. Market opportunities for a distributed micro turbine co-generation system are projected to increase dramatically. In this paper, It was determined that with current state of art component performance levels, metrallic materials, thermal efficiency goal of $28\%$ at sea level standard day conditions are attainable. Higher overall thermal efficiency of $78\%$ is attainable with micro-turbine combined with exhaust fired boilers.

  • PDF

Sensitivity Study on the Infra-Red Signature of Naval Ship According to the Composition Ratio of Exhaust Plume (폐기가스 조성 비율이 적외선 신호에 미치는 영향 연구)

  • Cho, Yong-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.4
    • /
    • pp.103-110
    • /
    • 2018
  • Infrared signatures emitted from naval ships are mainly classified into internal signatures generated by the internal combustion engine of the ship and external signatures generated from the surface of the ship heated by solar heat. The internal signatures are also affected by the chemical components ($CO_2$, $H_2O$, CO and soot) of the exhaust plumes generated by the gas turbine and diesel engine, which constitute the main propulsion system. Therefore, in this study, the chemical composition ratios of the exhaust plumes generated by the gas turbines and diesel engines installed in domestic naval ships were examined to identify the chemical components and their levels. The influence of the chemical components of the exhaust plumes and their ratios on the infrared signatures of a naval ship was investigated using orthogonal arrays. The infrared signature intensity of the exhaust plumes calculated using infrared signature analysis software was converted to the signal-to-noise ratio to facilitate the analysis. The signature analysis showed that $CO_2$, soot and $H_2O$ are the major components influencing the mid-wave infrared signatures of both the gas turbine and diesel engine. In addition, it was confirmed that $H_2O$ and $CO_2$ are the major components influencing the long-wave infrared signatures.

Influence on heat transfer due to uneven flow (유동 불균일이 전열관 튜브에 미치는 영향)

  • Chong, Chae-Hon;Song, Jung-Il
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2008.11a
    • /
    • pp.273-279
    • /
    • 2008
  • The purpose of this study is not only to evaluate thermal performance but also to find the stress behavior of heat transfer tubes under the part load operation in Heat Recovery Steam Generator. Flow analysis was performed to know the behavior of exhaust gas from gas turbine and thermal performance was calculated using distribution of hot exhaust velocity. In addition, tubes temperature during operation were gathered from actual plant to verify the uneven flow distribution under part load operation. Stress analysis was performed using tubes temperature data gathered from actual plant under both part and full load operations to know the stress behavior of tubes.

  • PDF

A Design of Engine Exhaust Ejector for Smart UAV (스마트무인기의 엔진 배기이젝터 설계에 관한 연구)

  • Lee, Chang-Ho;Kim, Jai-Moo
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2006.11a
    • /
    • pp.403-406
    • /
    • 2006
  • An ejector is designed for the purpose of engine bay cooling. The primary flow of the ejector is the exhaust gas of the PW206C turboshaft engine. The mass flow of secondary flow is calculated by using the approximate analytic equation. For the purpose of verification of approximate analytic method, comparison is made with the results of Navier-Stokes turbulent flow solution. According to the results of CFD, the mixing of two flows is incomplete due to the short length of mixing duct.

  • PDF

A Study on Fault Detection of Main Component for Smart UAV Propulsion system (스마트 무인기 추진시스템의 주요 구성품 손상 탐지에 관한 연구)

  • Kong, Chang-Duk;Kim, Ju-Il;Ki, Ja-Young;Kho, Seong-Hee;Choe, In-Soo;Lee, Chang-Ho
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2006.11a
    • /
    • pp.281-284
    • /
    • 2006
  • An intelligent performance diagnostic program using the Neural Network was proposed for PW206C turboshaft engine. It was selected as a power plant for the tilt rotor type Smart UAV (Unmanned Aerial Vehicle) which has been developed by KARI (Korea Aerospace Research Institute). The measurement parameters of Smart UAV propulsion system are gas generator rotational speed, power turbine rotational speed, exhaust gas temperature and torque. But two measurement such as compressor exit pressure and compressor turbine exit temperature were added because they were difficult each component diagnostics using the default measurement parameter. The performance parameters for the estimate of component performance degradation degree are flow capacities and efficiencies for compressor, compressor turbine and power turbine. Database for network learning and test was constructed using a gas turbine performance simulation program. From application results for diagnostics of the PW206C turboshaft engine using the learned networks, it was confirmed that the proposed diagnostics could detect well the single fault types such as compressor fouling and compressor turbine erosion.

  • PDF

Performance Analysis of CHP(Combined Heat and Power) for Various Ambient Conditions (외기조건변화에 따른 CHP 성능 해석)

  • Jeon, Yong-Han;Kim, Jong-Yoon;Kim, Nam-Jin;Lim, Kyung-Bum;Seo, Young-Ho;Kim, Ki-Hwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.8
    • /
    • pp.3353-3359
    • /
    • 2011
  • The co-generation system consisted of gas a turbine, a steam turbine, heat recovery steam generator and a heat exchangers for district heating was investigated in the present study. A back-pressure steam turbine (non-condensing type) was used. A partial load analysis according to the outdoor temperature in winter was conducted and optimal thermal load and power conditions was examined using the commercial computing software Thermoflex. As a result, under a constant thermal load, the power outputs of gas turbine and overall system increased as an outdoor temperature decreased. On the other hand, the reduction in exhaust gas temperature led to the decrease in output of steam turbine. Considering the portion of gas turbine in overall system in terms of the power output, it can be known that the tendency in power output of overall system was similar to that of the gas turbine.

A Study on the Preliminary Design of Gas Turbine Combustor (가스터빈 연소기 기본형상 결정에 관한 연구)

  • Ahn, Kook-Young;Kim, Han-Suck;Kim, Kwan-Tae;Bae, Jin-Ho
    • 한국연소학회:학술대회논문집
    • /
    • 1997.06a
    • /
    • pp.135-151
    • /
    • 1997
  • The preliminary design and performance test for determining dimensions of gas turbine combustor were investigated. The combustor design program was developed and applied to design our combustor. and detailed design for determining of swirler. dome and liner holes were performed experimentally. The swirler. which govern the combustion characteristics of combustor, was determined $40^{\circ}$ as swirl angle at first performance test. After second performance test the swirler was re-determined by 24 mm i.d.. 34 mm o.d., and swirl angle of $45^{\circ}$. The geometry of liner holes were determined by considering the flame stability and recirculation zone size. It was found that flame can be more easily stabilized by adjusting the swirier dimensions rather than liner holes. The geometry of swirler and liner holes were re-determined by final performance test with dilution holes. Also. the performance of combustor was evaluated by analysis of exhaust gases.

  • PDF

The performance of combined heat and power plant according to gas turbine air mass flow rate change (가스터빈 공기량 조절에 따른 열병합발전 성능 변화)

  • Kim, Jae-Hoon;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.18 no.2
    • /
    • pp.32-40
    • /
    • 2022
  • In this study, we investigated the operation data of combined heat and power in accordance with the change of the inlet guide vane with partial load. The partial load 80% could close the inlet guide vane up to 24%, and the exhaust gas temperature could be increased by 52℃. The partial load 90% could close the inlet guide vane up to 12%, and the exhaust gas temperature could be increased by 23℃. At 80% of partial load with the thermal load tracking mode, the output could be increased up to 5.68 MW, the combined cycle efficiency increased by 0.73%, and the combined heat and power efficiency increased by 1.81%. At 90% of the partial load, the output could be increased up to 2.55 MW, the combined cycle efficiency increased by 0.32%, and the combined heat and power efficiency increased by 0.72%.

  • PDF