• Title/Summary/Keyword: Tunnel safety

Search Result 1,110, Processing Time 0.026 seconds

Design of Standard Submission Format for Underground Structures : An Automated Update of the UnderSpace Integrated Map (지하공간통합지도 자동갱신을 위한 지하구조물 제출 표준 설계)

  • Park, Dong Hyun;Jang, Yong Gu;Ryu, Ji Song
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.6
    • /
    • pp.469-476
    • /
    • 2021
  • The framework plan for the development of an integrated underground space map was established of preventing ground subsidence. The mapping process is expected to be completed to the level of nationwide municipal government standards by end of this year. To facilitate the utilization of the integrated underground space map, paper-based drawings for specialized organizations in underground safety impact assessment have been provided since September 2018, and services for local government officials have been provided in the underground information utilization system since May 2019. However, the map is utilized based on the information at the time of the initial development of the map, without any updates, thereby resulting in a lack of accuracy and latest information. This has led to a decrease in the utilization and reliability of the information. Therefore, in this study, for the underground structures(subway, underground shopping mall, underground passage, underground roadway, underground parking lot, utility tunnel), which are the key components of the integrated underground space map, a standard format for the submission of completed drawings is designed in accordance with Article 42 (2) of the Special Act on Underground Safety Management, which aims at laying the foundation for establishing the updated system of the integrated underground space map. In addition, through the verification of the automatically updated underground structure data based on the standard format, the reliability of the data can be assured. This format is expected to contribute to the improved utilization of the integrated underground space map in the future.

Introduction of Two-region Model for Simulating Long-Term Erosion of Bentonite Buffer (벤토나이트 완충재 장기 침식을 모사하기 위한 Two-region 모델 소개)

  • Jaewon Lee;Jung-Woo Kim
    • Tunnel and Underground Space
    • /
    • v.33 no.4
    • /
    • pp.228-243
    • /
    • 2023
  • Bentonite is widely recognized and utilized as a buffer material in high-level radioactive waste repositories, mainly due to its favorable characteristics such as swelling capability and low permeability. Bentonite buffers play an important role in ensuring the safe disposal of radioactive waste by providing a low permeability barrier and effectively preventing the migration of radionuclides into the surrounding rock. However, the long-term performance of bentonite buffers still remains a subject of ongoing research, and one of the main concerns is the erosion of the buffer induced by swelling and groundwater flow. The erosion of the bentonite buffer can significantly impact repository safety by compromising the integrity of buffer and leading to the formation of colloids that may facilitate the transport of radionuclides through groundwater, consequently elevating the risk of radionuclide migration. Therefore, it is very important to numerically quantify the erosion of bentonite buffer to evaluate the long-term performance of bentonite buffer, which is crucial for the safety assessment of high-level radioactive waste disposal. In this technical note, Two-region model is introduced, a proposed model to simulate the erosion behavior of bentonite based on a dynamic bentonite diffusion model, and quantitative evaluation is conducted for the bentonite buffer erosion with this model.

Stability Analysis of Open Pit Slopes in the Pasir Coal Field, Indonesia (인도네시아 Pasir 탄전에서의 노천채탄장 사면의 안정성 해석)

  • 정소걸;선우춘;한공창;신희순;박연준
    • Tunnel and Underground Space
    • /
    • v.10 no.3
    • /
    • pp.430-440
    • /
    • 2000
  • A series of studies such as geological logging data analysis, detailed geological survey, rock mass evaluation, in-situ and laboratory tests, rock strength and mechanical properties of the rock were concerned. The stability of the slope were carried out inorder to design the pit slope and individual benches using the stereographic projection analysis and numerical methods in Roto Pit of Pasir coal field. The bedding plane was one of the major discontinuities in the Roto Pit and the dip of which is about 60$^{\circ}$ in the northern part and 83$^{\circ}$ in the southern part. The dip of bedding becomes steeper from north to south. The plane and toppling failures are presented in many slopes. In laboratory test the average uniaxial compressive strength of mudstone was 9MPa and that of weak sandstone was 10MPa. In-situ test showed that the rocks of Roto north mining area are mostly weak enough to be classified in grade from R2(weak) to R3(medium strong weak) and the coal is classified in grades from R1(Very weak) to R2(Weak). The detailed stability analysis were carried out on 4 areas of Roto north (east, west, south and north), and 2 areas of Roto south(east and west). In this paper, the minimum factor of safety was set to 1.2 which is a general criterion for open pit mines. Using the stereographic projection analysis and the limit equilibrium method, slope angles were calculated as 30∼36$^{\circ}$ for a factor of safety greater than 1.2. Then these results were re-evaluated by numerical analysis using FLAC. The final slope angles were determined by rational described above. A final slope of 34 degrees can guarantee the stability for the eastern part of the Roto north area, 33 degrees for the western part, 35 degrees for the northern part and 35 degrees for the southern part. For the Roto south area, 36 degrees was suggested for both sides of the pit. Once the pit slope is designed based on the stability analysis and the safety measures, the stability of slope should be checked periodically during the mining operations. Because the slope face will be exposed long time to the rain fall, a study such aspreventive measures against weathering and erosion is highly recommended to be implemented.

  • PDF

The Activation Plan of Variable Speed Control of Considering Urban Freeway Continuos Traffic Characteristics (In Busan Metropolitan City) (도시고속도로 연속류의 교통특성을 고려한 가변속도제어 활성화 방안 - 부산광역시를 중심으로 -)

  • Jeong, Yong-Hwa;Choi, Yang-Won;Lim, Chang-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.627-635
    • /
    • 2014
  • Currently the highest speed limit on the road traffic congestion or because you can not cope with climate change to cause a traffic accident may be a factor. According to the Road Traffic Act as well as 20% to 50% in case of inclement weather, but the driver must slow speed left to the judgment of the difficulties, and to slow the vehicle and the relative velocity between the vehicle does not run longer be a big influence on the environment and safety. Thus, variable speed control for drivers on the road, specify the appropriate maximum speed limit in bad weather It keeps motorists slowed the run rate to prevent accidents or reduce the severity of accident damage is expected to be possible. The purpose of this study is the frequent traffic accidents Continuous Busan (City Freeway) around the variable speed control in the appropriate sections so that it can be done by analyzing the characteristics of traffic accidents were the severity of the accident. Highway and urban environment, the geometry of the structure because it has a lot of Curved planar point compared to wet and dry road surfaces by simulated rain wet had bom the more the speed the greater the risk of an accident was the result. Based on these results, the primary section, first urban highway tunnel, near the lamp, near Toll Plaza, near binary Outlet after considering various factors such as speed reduction is needed in the first period by conducting awareness and recognize the need for the participation of the driver and the future city installation and operation of highways in all sectors is expected to be expanded.

Experimental Study for the Capacity of Ordinary and Emergency Ventilation System in Deeply Underground Subway Station (대심도 지하역사 승강장 및 대합실 평상시/비상시 급·배기 풍량에 대한 실험적 연구)

  • Jang, Yong-Jun;Lee, Ho-Seok;Park, Duck-Shin
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.579-587
    • /
    • 2012
  • Shin-gumho station in Seoul underground subway have been selected to be experimentally investigated and analyzed for the real air supply & exhaust capacity compared to the original capacity of ordinary and emergency condition. The depth of Shin-gumho station is 43.6m which consists of the island-type platform ($8^{th}$ floor in underground) and a two-story lobby (first & second floor in underground). An emergency staircase connects between the platform and the lobby. Hot-wire anemometer, capture hood, wind vane & velocity meter and data acquisition systems are employed to perform the automatic measurement in this experiment. For ordinary case, air supply and exhaust capacity in the lobby were reduced by 34% and 46% compared to the original capacity, respectively. Air supply and exhaust capacity in the platform were reduced by 66% and 38%, respectively. For emergency case, air supply in the lobby was reduced by 42% and air exhaust in the platform was reduced by 28% compared to the original capacity. Therefore, air pollution in the station is expected to be worse in the ordinary environment and smoke control capability in the platform will be weakened in case of fire emergency.

A 2-D Location Determination Model of Buried Persons in Collapsed Shape using Optimal Wireless Communication Technology (최적 무선통신 기술을 활용한 붕괴지형 매몰자의 2차원 매몰위치 결정 모델)

  • Moon, Hyoun-Seok;Lee, Woo-Sik;Lee, Gun-Woo;Han, Dong-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.12
    • /
    • pp.8879-8888
    • /
    • 2015
  • When the disaster like earthquake in urban area occur, due to the collapse accidents for subway, tunnel space with buildings or underground area, enormous property and human damage are happened. Specially, since it is difficult to identify survived status of humans within collapsed debris and accurately buried locations of the humans, inputs of considerable time and manpower for rescuing them are required. Besides, secondary damage can be occurred by additional collapses. The aim of this study is to propose a stochastic location positioning method that enables to provide aid information by determining locations of mobile devices for buried persons in 2-D plane using wireless communication technologies. This study selected a detection method for buried persons based on Wi-Fi signal, and identified characteristics of signal strengths by distance unit. Using these methods, a stochastic location detection model in 2-D plane was built. It is expected that this technology will be utilized as a core technology that can protects safety and human life of the public by providing data for rescuing quickly buried persons in cases of national disasters for future.

A Case Study on the Boring-Hole Blasting for Offering of the Ground Vibration Source (지진동 Source 제공을 위한 심부 시추공발파 기술사례)

  • 조영곤;김희도;조준호
    • Tunnel and Underground Space
    • /
    • v.13 no.3
    • /
    • pp.187-195
    • /
    • 2003
  • This case study which is to make 2-Dimension earth's crust structures clearly is about the great boring-hole blasting to provide ground vibration source of the reflected wave research on the Korean Peninsula earth's crust structures research. For this study we've done blasting twice-500 ㎏/charge per delay, 1,000 ㎏/charge per delay, and the specifications of blasting are the following - dia.: 300 ㎜, boring-depth : 100m, besides, we used the explosives and electric detonators which have sufficient detonating velocity and very excellent safety, capacity of detonating, accurate delay time. We charged explosives into steel pipe with bulk type to avoid dead pressure by ground water. And then we tested about pipe airtight and blasting to certificate which has no problem by using on this study. In the results, we succeeded each blasting in Seosan, Youngdong. For the Peak Sum Vector(PSV) around the blasting at the main points, its real measured PSV is higher 180 % than estimated PSV with USBM. In this study we can't to be analysis of vibration velocity, but to be key providing vibration source.

The Evaluation on Applicability of Leakage-prevented Sealing Packer Out of Grouted Rockbolt Hole (록볼트 그라우팅 시 역류방지용 밀봉 패커의 적용성 평가)

  • Yang, Taeseon;Kim, Jichang;Jeong, Jongki;Yoo, Dongho;Choi, HakYun;Baek, Seungcheol
    • Journal of the Korean GEO-environmental Society
    • /
    • v.17 no.11
    • /
    • pp.15-21
    • /
    • 2016
  • Nowadays, some studies have been performed for rockbolt method widely used in Korea. To make large slopes, tunnels or rock structures stable, supporting systems, such as anchor bolt, rock bolt which are developed recently, are commonly used. In this study, laboratory pullout tests were carried out to compare the characteristics of rock bolt that is most widely used with ones of rock bolt by newly developed circular model testers. Re-pullout test for the rock bolt in which loading and unloading cycles are repeated several times showed that the maximum pullout load is almost constant irrespective of the number of loading cycles, which may be due to no failure between rock bolt and filler that is filled with soils and concrete as a substitute. A development of rock bolt fillers as supporters using to protect people in tunnels and slopes is reviewed as a probable man-made hazard after excavation works. The functions of the grouted rock bolts associated with reinforcement effects also should be assessed in this study, which develop the sealing apparatus preventing from overflowing mortar out of a rock bolt hole for securing safety in the tunnel and slopes in order to secure stability named the sealing packer.

A Case Study on the Ventilation and Heat Environment in a Underground Limestone Mine with Rampway (Rampway 설치 석회석 광산내 환기 현황 및 열환경 분석 사례연구)

  • Kim, Doo-Young;Lee, Seung-Ho;Jeong, Kyu-Hong;Lee, Chang-Woo
    • Tunnel and Underground Space
    • /
    • v.22 no.3
    • /
    • pp.163-172
    • /
    • 2012
  • As more diesel engines have been employed in underground limestone mines with large cross section, underground space environment is worsened by diesel exhausts and heat flow. This paper aims for the ultimate goal to optimize the work place environment through assuring the optimal required ventilation rate based on the analysis of the airflow, diesel exhaust gas concentrations and the effects of mechanization and deepening working face on temperature and humidity. Due to the insufficient capacity of the main exhaust fan and poor airway management, stagnant airflows were observed at various locations, while the flow direction was reversed instantly with passing diesel equipment and the flow reversal was also made by the seasonal variation of the outside surface weather. During the loading operation, CO concentration measurements were found to be frequently higher than the threshold limit of 50 ppm, and most of the $NO_2$ measurements during drilling and loading operations shows even more serious levels surpassing the permissible limit of 3 ppm. The actual ventilation quantity was considerably less than the required quantity estimated by the mine health and safety law, and this shortage problem was less serious in colder winter showing more effectiveness of the natural ventilation.

Establishment of a Safe Blasting Guideline for Pit Slopes in Pasir Coal Mine (파시르탄광의 사면안전을 위한 발파지침 수립 연구)

  • Choi, Byung-Hee;Ryu, Chang-Ha;SunWoo, Coon;Jung, Yong-Bok
    • Tunnel and Underground Space
    • /
    • v.18 no.6
    • /
    • pp.418-426
    • /
    • 2008
  • A surface blasting method with a single tree face is currently used in Pasir Coal Mine in Indonesia. The single free face is usually the ground surface. This kind of blasting method is easy to use but inevitably causes enormous ground vibrations, which, in turn, can affect the stability of the slopes comprising the various boundaries of the open pit mine. In this regard, we decided to make a specific blasting guideline for the control of found vibrations to ensure the safety of the pit slopes and waste dumps of the mine. Firstly, we derived a prediction equation for the ground vibration levels that could be occurred during blasting in the pits. Then, we set the allowable levels of ground vibrations for the pit slopes and waste dumps as peak particle velocities of 120mm/s and 60mm/s, respectively. From the prediction equation and allowable levels, safe scaled distances were established for field use. The blast design equations for the pit slopes and waste dumps were $D_s{\geq}5\;and\;D_S{\geq}10$ respectively. We also provide several standard blasting patterns for the hole depths of $3.3{sim}8.8m$.