• Title/Summary/Keyword: Tunnel portal

Search Result 94, Processing Time 0.022 seconds

A study on the characteristics of tunnel deformation and support system according to tunnel portal reinforcement method (터널 갱구부 보강방법에 따른 터널 변형 및 지보재 응력특성에 관한 연구)

  • Moon, Kyoung-Sun;Seo, Yoon-Sic;Kang, Si-On;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.3
    • /
    • pp.625-639
    • /
    • 2018
  • This study is about the reinforcing type of reinforcement method which is reinforced in tunnel portal of tunnel with bad ground condition. Generally, it is known that the horizontal reinforcement method is more effective than the conventional reinforcement method. However, as a limitation of the tunnel construction technology, it is being constructed by the superposition reinforcement method. In recent years, high-strength large-diameter steel pipes and horizontally oriented longitudes (L = 30.0~50.0 m) construction technology have been developed. Therefore, it is required to study reinforcement method of tunnel portal reinforcement method. Therefore, 3-D numerical analysis (Midas GTS NX 3D) was performed by setting the reinforcement method (No reinforcement type, overlap reinforcement type and horizontal reinforcement type) and ground condition as parameters. As a result, it was considered that the reinforcement effect was the largest as the horizontal reinforcement type of the reinforcement method was the smallest in the displacement and the support material stress. Based on the results of the numerical analysis, horizontal steel pipe grouting was applied to the actual tunnel site. The displacement of the tunnel portal and the stress of the support material occurred within the allowable values and were considered to ensure sufficient stability.

Experimental study on the alleviation of micro-pressure waves radiated from the tunnel exit with the slanted portals on the high-speed train operations of 300km/h (300km/h급 고속철도의 터널 미기압파 저감을 위한 경사갱구의 실험적 연구)

  • Kim, Dong-Hyeon;Min, Dong-Ho
    • Proceedings of the KSME Conference
    • /
    • 2000.04b
    • /
    • pp.841-846
    • /
    • 2000
  • The compression wave produced when a high-speed train enters a tunnel propagates along the tunnel ahead of the train. The micro pressure wave related to He compression wave is a special physics Phenomena created by high-speed train-tunnel interfaces. On this work, the method for reducing the micro pressure wave is to delay the gradient of the compression wave by using aerodynamic structures. The objective of this paper is to determine the optimum angle of the slanted portal using the moving model rig. According to the results of the present study, the maximum value of micro pressure wave is reduced by 19.2% fer the $45^{\circ}$ slanted portal installed at the entrance of the tunnel and reduced by 41.9% far the $45^{\circ}$ slanted portals at the entrance and exit of the tunnel. Also it is reduced by 34.6% for the $30^{\circ}$ slanted portals installed at the entrance and exit of the tunnel.

  • PDF

A Study on the Stability Analysis and Countermeasure of Tunnel Portal Failure Slope - in Suanbo Hot Springs 1 and 2 Tunnel Failure Site (터널 갱구부 붕괴 사면의 안정성 해석 및 보강공법에 관한 연구 - 수안보 온천 1, 2터널 붕괴 현장을 중심으로)

  • Baek, Yong;Koo, Ho-Bon;Yoo, Ki-Jeong
    • The Journal of Engineering Geology
    • /
    • v.12 no.4
    • /
    • pp.367-378
    • /
    • 2002
  • Recently, the number of tunnels on national roads has been increased due to the trend that construction of the large-scaled cut slopes is limited because of the environmental issues. Therefore, the slope failures of tunnel portal have often occurred. The tunnel portal in use has limitations on selection of the countermeasure and construction against slope failure. In the cases of Suanbo hot springs 1 and 2 tunnel portals, seedding was chosen and constructed as the countermeasureof slope failure when the tunnel was first built but collapsed in April, 2002. In this study, the failure sites were examined accurately through the site investigation and an efficient countermeasure according to stability analysis is presented. It is shown that it is very efficient to use resloping for Suanbo hot springs 1 tunnel and concrete buttress, rock anchor to reinforcement countermeasure, and attached rockfall prevention net by dividing the site into 3 sections for Suanbo hot springs 2 tunnel.

Assessment of tunnel stability according to height of embankment by numerical analysis (수치해석을 통한 성토 높이에 따른 터널 안정성 평가 연구)

  • Lee, Kang-Hyun;Lee, Sangrae;Kim, Nag-Young
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.1
    • /
    • pp.37-45
    • /
    • 2021
  • The construction of the tunnel portal should be careful because cover depth is shallow and it is difficult to exhibit the arching effect. Tunnel stability may be reduced with additional embankment above the portal of tunnel. In this study, in order to examine the stability of the tunnel according to additional embankment above the portal of tunnel, numerical analysis was performed while changing the ground conditions and height of embankment. As a result of the numerical analysis, it was found that the allowable flexural compressive stress of shotcrete and allowable axial force of rockbolts were exceeded when the height of additional embankment was 12 m in rock mass rating V. When considering the displacement, the range of the plastic region and the behavior of the support materials, the tunnel stability seems to be greatly reduced if the height of additional embankment above the portal of tunnel exceeds 10 m.

Geotechnical characteristics of the collapsed $\bigcirc\bigcirc$tunnel slope in Yeosu-Suncheon area (여수-순천 도로확장공사 구간 $\bigcirc\bigcirc$터널 붕괴사면 지반특성)

  • Kim, Seung-Hyun;Koo, Ho-Bon;Lee, Jeong-Yup;Rhee, Jong-Hyun;Kim, Seung-Hee
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.848-857
    • /
    • 2008
  • In September 2007, the collapses of slopes and landslides are happened at Jeonlanamdo due to heavy rains accompanied with Typoon "Nari". The study area is the tunnel portal slope in new road construction site. This slope consists of pyroclastic rocks and has lots of faults. Particularly, the residual soils of the slope is deteriorated with yellowish mudstone layer as a results of chemical and physical weathering. This has a variety of swelling clay minerals and might be moved easily down at the gentle terrain. The inner factor of $\bigcirc\bigcirc$tunnel portal slope's collapse is the geological weak zone, the convergent topography, the inferiority of drainage and the heavy rain act on the failure as direct trigger.

  • PDF

Study on Statistical Method for Objective Evaluation of Tunnel Portal Slopes (객관적인 터널 갱구사면 평가를 위한 통계기법 연구)

  • Kwon, O-Il;Baek, Yong;Na, Jong-Hwa;Seo, Yong-Seok;Kim, Gyo-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.634-643
    • /
    • 2006
  • This study was intended to develop a high reliable technique by statistically processing on-site data with a general linear model, providing the basic data for construction, analysis of stability and establishment of maintenance measures for tunnel portal slopes in the future. This study evaluated the stability of a tunnel portal slope using a quantified technique, which is based on a general linear model. The important scores of each independent variable were allocated by using the ranges of the quantified values, based on the predicted coefficient of regression and the scores for categories of each independent variable were allocated so that those are equally spaced. The quantification model obtained from the results of evaluating the total data used for the quantification process provided precise results. In addition, it is expected that a more detail subdivision of response variables and sufficient data would produce a better stability evaluation standard.

  • PDF

Experimental study on the alleviation of micro-pressure waves radiated from the tunnel exit with the slit hoods on the high-speed train operations of 300km/h (300km/h급 고속철도의 터널 미기압파 저감을 위한 슬릿후드의 실험적 연구)

  • Kim, Dong-Hyeon;Min, Dong-Ho
    • Proceedings of the KSME Conference
    • /
    • 2000.04b
    • /
    • pp.619-624
    • /
    • 2000
  • The purpose of present study is to investigate for reducing micro pressure waves generated according to train speeds $(240km/h{\sim}380km/h)$ through tunnels with countermeasures as followings; the hood configuration in tunnel entrance. We developed hoods for tunnel of 0.5 km length in the condition of tunnel cross-section area of $107m^2$ on the slab track. According to the results the maximum micro-pressure wave is reduced by 41.2% for the slit hood installed at the entrance of the tunnel and reduced by 47.7% for the slit hood installed at the entrance of the tunnel and the $45^{\circ}$ slanted portal at the exit of the tunnel

  • PDF

NATE터널의 갱문 가시설 배후 균열에 따른 조치 및 보강사례

  • Kil, Ho-Un;Kim, Jin-Hong;Yoo, Jai-Sung;Cha, Bok-Nam
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.342-355
    • /
    • 2006
  • The Tunnel portal is designed on temporary support system which is composed by 28m height H-Pile method and Ground Anchor method. The tunnel has excavated about 30m from the portal, but some deformation is found on the surface ground just above the tunnel face. It was investigated very carefully to find out the causes of deformation. By the observation and study, two main causes of deformation are found out. The one is earth pressure increase compared with classical earth pressure theory. That was due to the direction of ground rock mass's discontinuities. It causes the increase of earth pressure that are activated by the direction of discontinuity. The other one is that present design method neglect the transferred force by removal of temporary support members and ground anchor within the tunnel contour line as the tunnel excavation proceeds As the result of removals of the member and anchor, some force transferred from removed systems to remaining supporting systems. In designing the portal support systems, lt must be considered the discontiunity of ground mass and the transfered force due to excation.

  • PDF

Experimental Study on the Slit Cover Hood for Reducing the Micro Pressure Waves in High-Speed Train-Tunnel Interfaces (고속철도에서 슬릿커버 완충공의 터널 미기압파 저감성능)

  • Kim, Dong-Hyeon;Min, Dong-Ho
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.25 no.6
    • /
    • pp.758-765
    • /
    • 2001
  • Purpose of the present is to investigate the food configuration at a tunnel entrance for reducing the micro pressure wave that is generated according to train speed. Two configurations were examined for tunnel of 0.5 km length. The experimental results show that a slit cover hood installed at the entrance of the tunnel reduces the maximum micro pressure wave by 41.2%, and a configuration with a slit cover hood installed at the entrance and a 45$^{\circ}$slanted portal at the exit of the tunnel suppresses it by 47.7%.

Study on Ground Surface settlement of a 3-Arch-shaped Tunnel (3아치터널의 지표면 침하에 관한 연구)

  • Shin Kang Ho;Park Tu Sung;Park O Sung;Kim Jae Kwon
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1007-1013
    • /
    • 2004
  • A three-arch NATM tunnel with a total length of 53.5m has been constructed for a metropolitan subway station in Daejon, Korea. The tunnel, whose crown is located 22m below the ground, crosses the old Daejon station underneath. Since the tunnel comprises a very large section (10${\times}$28 m; largest in Korea), it shows complicated mechanical behaviors, especially near portal, due to its short length relative to width. As far as its construction step is concerned, the center tunnel is excavated with pre-excavated pilot tunnel, which is a unique feature of this tunnel (first in Korea) to secure safety during construction and prevent excessive settlements. The both side tunnels are then excavated along with the center tunnel. Since significant amount of settlement was predictable from the design stage, extensive monitoring was performed during construction. During excavation of the side tunnels, unexpected large settlements up to ${\~}$140mm (estimated 41.8 mm at design stage) was measured at the center tunnel. In this paper, we study the causes of this unusually large ground settlement. We believe that the extra-wide tunnel excavation increases the stress influence zone of portal in longitudinal direction and consequently add more settlements to the existing due to excavation and consolidation.

  • PDF