지형과 사교하는 갱구부의 비탈면 최소화 방안 연구 (A Study on the Minimization of Cutting Slope around Tunnel Portal)

  • 정관식;박지훈;김건호;이완재
    • 한국터널공학회:학술대회논문집
    • /
    • 한국터널공학회 2005년도 학술발표회 논문집
    • /
    • pp.359-371
    • /
    • 2005
  • The Cutting slope is to be minimized when a tunnel meets the contour of slope terrain at a right angle around its portal. However, a tunnel portal has been generally installed at a right angle to the longitudinal axis of a tunnel with no consideration of the intersection angle with the slope terrain. This sometimes tended to cause huge cutting slope that resulted in many disadvantage in terms of safty, economy and environment. Therefore, the minimization of cutting slope is studied by taking the intersection angle into account, and the result is compared with that by the conventional method. In addition a design method for the inclined portal to the tunnel axis is proposed through 3D-FEM analysis, also the applicable ground condition is suggested.

  • PDF

네트워크형 지하 도로터널 분기부에서의 환기효율 향상방안에 대한 실험적 연구 (Experimental study of improvement of ventilation efficiency at intersection in network-form underground road tunnel)

  • 이호석;홍기혁;최창림;강명구;임재범;문홍표
    • 한국터널지하공간학회 논문집
    • /
    • 제14권2호
    • /
    • pp.107-116
    • /
    • 2012
  • 네트워크형 도로터널 내 분기부 구조물과 제트팬에 의한 분기 환기효율 분석하고자 실제 도로터널을 1/45로 축소하여 실험을 수행하였다. 차량이 주행할 때 발생하는 교통관성력을 적용하기 위해 블로워 팬를 사용하여 축소모형 터널내 기류를 형성하였고, 터널의 국부적인 위치에서 속도를 측정하여 분기 효율을 연구하였다. 구조물의 특징으로 발생되는 환기 저감을 개선하기 위해 제트팬을 설치하여 터널 내 환기 효율을 최적화하였다.

계측에 의한 지하철터널 교차부의 안정성 검토 (Stability Analysis on the Intersection Area of Subway Tunnels by Observational Method)

  • 김치환
    • 터널과지하공간
    • /
    • 제15권1호
    • /
    • pp.71-79
    • /
    • 2005
  • 지표로부터 터널까지의 토피가 얇고 지반이 풍화토 혹은 풍화암으로 연약한 곳에서 두 터널이 교차되도록 굴찰할 때 교차부의 역학적 안정성을 계측으로 확인하였다. 터널의 시공방법은 주로 12 m의 강관 다단그라우팅 3열로 막장전방을 선보강한 후 터널상반부를 굴착하였고 두 터널의 교차부는 자천공 록볼트로 추가 보강하였다. 터널 굴착 후 교차부 주변 지반의 변위가 수렴되어 역학적인 안정을 확인 할 수 있었다. 최종적으로 수렴된 변위는 천단침하와 내공변위가 각각 약 6-7 mm. 약 5 mm로 터널의 심도와 연약한 지반조건을 고려할 때 작은 값이었다. 따라서 길이 12 m의 강관 다단그라우팅 3열로 막장전방을 보강한 후 터널 교차부 주변을 굴착한 것은 변위를 억제하고 터널의 안정화에 효과적인 것으로 분석되었다.

대심도 복층터널 교차로 화재연기 확산지연 방안 연구 (A study on the fire smoke diffusion delay strategy in a great depth underground double deck tunnel junction)

  • 신태균;문정주;양용원;이윤택;한재희
    • 한국터널지하공간학회 논문집
    • /
    • 제21권1호
    • /
    • pp.115-126
    • /
    • 2019
  • 최근 도심지 차량 정체 해소와 주변환경을 개선하기 위하여 도심지 지하공간을 활용하는 대심도 복층터널 설계 및 시공 기술개발 연구가 진행되고 있으며, 네트워크형 복층터널은 단면이 작고, 평지 하부에 시공됨에 따라 입 출구의 경사가 가파른 특징이 있는 교차로 형태를 가지며 화재발생시 화재연기가 매우 빠르게 전파되어 인명피해 발생이 우려된다. 따라서 본 연구에서는 교차로에 화재연기 확산지연장치를 설치한 경우와 미설치된 경우에 대하여 화재연기 확산지연효과를 분석하였다. 화재연기 확산지연장치를 교차로에 설치하였을 시 화재발생 후 270초까지 화재연기가 지연되었으며, 화재연기 확산지연장치의 차단면적이 커질수록 인명피해 예방에 도움이 될 것으로 분석되었다.

The impact of EPB pressure on surface settlement and face displacement in intersection of triple tunnels at Mashhad metro

  • Eskandari, Fatemeh;Goharrizi, Kamran Goshtasbi;Hooti, Amir
    • Geomechanics and Engineering
    • /
    • 제15권2호
    • /
    • pp.769-774
    • /
    • 2018
  • The growth of cities requires the construction of new tunnels close to the existing ones. Prediction and control of ground movement around the tunnel are important especially in urban area. The ground respond due to EPB (Earth Pressure Balance) pressure are investigated using the finite element method by ABAQUS in intersection of the triplet tunnels (Line 2, 3 and 4) of Mashhad Urban Railway in Iran. Special attention is paid to the effect of EPB pressure on the tunnel face displacement. The results of the analysis show that in EPB tunneling, surface settlement and face displacement is related to EPB pressure. Moreover, it is found that tunnel construction sequence is a great effect in face displacement value. For this study, this value in Line 4 where is excavated after line 3, is smaller than that line. In addition, the trend of the displacement curves are changed with the depth for all lines where is located in above and below, close to and above the centerline tunnel face for Line 2, 3 and 4, respectively. It is concluded that: (i) the surface settlement decreases with increasing EPB pressure on the tunnel face; (ii) at a constant EPB pressure, the tunnel face displacement values increase with depth. In addition, this is depended on the tunneling sequence; (iii) the trend of the displacement curves change with the depth.

네트워크형 복층 도로터널 환기에서의 충격 손실 평가를 위한 수치해석적 연구 (Numerical Analysis on the Estimation of Shock Loss for the Ventilation of Network-type Double-deck Road Tunnel)

  • 박상훈;노장훈;김진
    • 터널과지하공간
    • /
    • 제27권3호
    • /
    • pp.132-145
    • /
    • 2017
  • 과거 도로터널 환기에 있어서 충격 손실은 설계에 반영되지 않았지만, 터널 내 네트워크형 구조로 인해 분기 합류부가 존재하는 복층 도로터널에서는 충격 손실에 의한 압력 손실이 크게 발생할 것이다. 이에 본 연구에서는 네트워크형 구조를 가지는 복층 도로터널 최적 환기 설계를 위하여 분기 합류 지점에서 발생하는 충격 손실에 대한 3D 전산유체역학(CFD) 수치해석 연구를 수행한다. 이를 위해 복층 도로터널 표준단면을 적용한 실제 스케일 모델을 활용하여 전산 유체 역학을 수행하였고 다양한 각도와 차도폭에 대한 충격 손실 계수를 도출하여 기존의 설계 값과 비교 분석하였다. 연구 결과, 분기 구간에서는 30도의 분류 각도를 가진 모델의 충격 손실 계수가 높게 측정되었고, 합류 구간에서는 2차선으로 설계된 모델의 충격 손실 계수가 낮게 측정됨을 확인할 수 있었다. 따라서 분기 합류 각도와 차도폭이 충격 손실 산정에 있어서 중요한 설계 요소가 될 수 있으므로 환기기 용량 산정에 있어서 정확한 설계 인자를 제시할 것으로 판단된다. 본 연구는 3D 전산유체역학(CFD)를 활용하여 확폭 교차 유 무에 따른 분기 합류 지점에서의 충격 손실 계수를 도출하고, ASHRAE 설계 값과 결과를 비교 분석하였다. 확폭 구간이 반영되지 않은 모델은 ASHRAE 값에 비해 최대 3배의 충격 손실 값을 확인하였고, 확폭 구간이 반영된 모델은 최대 2배의 값을 확인할 수 있었다.

발파시 터널 숏크리트의 최대입자속도와 부착상태평가 분석 (Analysis of the peak particle velocity and the bonding state of shotcrete induced by the tunnel blasting)

  • 홍의준;장석부;송기일;조계춘
    • 한국터널지하공간학회 논문집
    • /
    • 제12권3호
    • /
    • pp.247-255
    • /
    • 2010
  • 숏크리트의 부착강도는 천정부의 낙반방지와 발파진동에 의한 숏크리트 탈락방지에 중요한 역할을 하는 요소이다. 따라서, 숏크리트의 부착상태평가는 품질관리의 주요 요소가 될 수 있다. 본 연구는 터널 내 발파에 의하여 숏크리트에 미치는 최대 입자속도를 예측하고, 발파 진동에 의한 숏크리트의 부착상태를 평가하기 위하여 수행되었다. 이를 위하여 현재 시공중인 터널현장에서 피난연락갱의 발파시 본선부 및 서비스 터널의 발파진동을 측정하였으며 충격반향시험을 수행하여 숏크리트-암반의 부착상태를 평가하였다. 충격반향시험 신호분석을 위하여 시간-주파수 영역 해석 기법을 도입하였으며 평가결과, 국내에서 일반적으로 시행되는 발파조건에서는 숏크리트와 암반의 부착력 손실(들뜸 현상)은 거의 발견되지 않았으며, 숏크리트 부착력 손상 가능성은 낮은 것으로 판단되었다.

터널시공 중 붕락발생 원인과 최신 보강기술 (Major causes of failure and recent measurements of tunnel construction)

  • 박봉기;황제돈;박치면;김상수
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 지반공학 공동 학술발표회
    • /
    • pp.140-153
    • /
    • 2005
  • During the tunnel construction the major failure mode can be categorized as: tunnel failure just after the tunnel excavation without support, failure after application of shotcrete and finally failure after setting the concrete lining. The failure mode just after the tunnel excavation without support, can be further classified as : bench failure, crown failure, face failure, full face failure, failure due to weak strata and failure due to overburden. Moreover the failure after application of shotcrete is classified as heading face failure, settlement of shotcrete support, local failure of shotcrete lining and invert shotcrete. To find out the major causes of tunnel collapse, the investigation was done in case of the second phase of Seoul subway construction. The investigation results depicted that the major causes of tunnel collapse were due to the weak layer of rock/fault and sudden influx of ground water from the tunnel crown. While the investigation results of the mountain road tunnels construction have shown that the major causes of tunnel failure were inadequate analysis of tunnel face mapping results, intersection of faults and limestone cavities. In this paper some recent measurement in order to mitigate such tunnel collapse are presented