• Title/Summary/Keyword: Tunnel blasting design

Search Result 105, Processing Time 0.022 seconds

Pilot Test of Grid-Type Underground Space Considering Underground Complex Plant Operation (지하 복합플랜트 운영 중 확장을 고려한 격자형 지하공간 파일럿 테스트)

  • Chulho Lee
    • Tunnel and Underground Space
    • /
    • v.33 no.6
    • /
    • pp.472-482
    • /
    • 2023
  • The grid-type or room-and-pillar method is applied for the purpose of mining horizontally buried minerals. In this study, design and pilot test were performed to apply the room-and-pillar method which uses natural rock as a rock pillar to the construction of underground space. The area where the pilot test was conducted was in stone mine and had good rock conditions with an appropriate depth (about 30 m) to apply the pilot test. The pilot test site was selected by reviewing accessibility and ground conditions and then site construction was performed through detailed ground investigation and design. The pilot test was designed with a column shape of 8×8 m and a cross-section of 8×12 m. The blasting pattern was determined through test blasting at the site, and blasting of 3 m excavation with 89 holes was performed. Through field observations, the average width of 12.5 m and the average height of 8.3 m were measured. Therefore, it is possible to proceed similar to the cross-sectional shape considered in the design.

Sensitivity analysis of tunnel stability with a consideration of an excavation damaged zone (암반손상대를 고려한 터널 안정성 민감도 분석)

  • Kim, Jin-Soo;Kwon, Sanki
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.1
    • /
    • pp.91-104
    • /
    • 2014
  • An Excavation Damaged Zone (EDZ), in which rock properties are permanently changed due to blasting impact or stress redistribution, can influence the behavior and stability of structures. In this study, the mechanical stability of an underground opening was simulated by using FLAC, which is a two-dimensional modeling code, with a consideration of EDZ. A sensitivity analysis was also carried out with fractional factorial design. From the modeling, it was found that the behavior and the stability of an underground tunnel are strongly dependent on the existence of the EDZ. The sensitivity analysis showed that the key parameters affecting the factor of safety around the tunnel are in-situ stress ratio, depth, cohesion, reduction ratio, internal friction angle, and height and width of the tunnel. It is necessary to consider the EDZ, which can significantly affect mechanical stability in tunnel design.

Experimental and Numerical Approach foy Optimization of Tunnel Blast Design (터널 발파설계 최적화를 위한 실험 및 수치해석적 접근)

  • 이인모;김상균;권지웅;박봉기
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.2
    • /
    • pp.75-85
    • /
    • 2003
  • Laboratory model blast and in-situ rock blast tests were conducted to determine blast-induced stress wave propagation characteristics under different explosive types, different loading conditions and different mediums. Dynamic numerical approaches were conducted under the same conditions as experimental tests. Stress magnitudes at mid-point between two blast holes which were detonated simultaneously increased up to two times those of single hole detonation. The rise time of maximum stress in a decoupled charge condition was delayed two times that of a fully charged condition. Dynamic numerical analysis showed almost similar results to blast test results, which verifies the effectiveness of numerical approaches fur optimizing the tunnel blast design. Dynamic numerical analysis was executed to evaluate rock behavior and damage of the contour hole, the sloping hole adjacent to the contour hole in the road tunnel blasting pattern. The rock damage zone of the sloping hole from the numerical analysis was larger than that of the contour hole. Damage in the sloping hole can be reduced by using lower density explosive, by applying decoupled charge, or by increasing distance between the sloping hole and the contour hole.

Effects of Earthquake on Tunnel Stability (지진이 터널 안정에 미치는 영향)

  • 박남서
    • Explosives and Blasting
    • /
    • v.14 no.2
    • /
    • pp.71-80
    • /
    • 1996
  • A series of nurmerical analysse for the earhtquake of Iran railway tunnles under construction by NATM(New Astrian Tunnelling Method) were careid out throuth a pseudo-dynamic analyses techique used in a FFM computer program, DWTAP(Daewoo Tunnel Analysis Program), and the results are described in the paper. The analyses were performErl for two case;one is for the primary supports and the other is for the rompletEd permanent roncrete lining. The horizontal and verical groW1d accelerations for the design were estimatEd as 0.34 g and 0.23 g, respectively based on the historical reismic rerords in the proj3et area and the empirical equations. The results show that the turmel would be safe W1der the anticipitOO earthquake motion with the permanent roncrete lining, but some minor cracks rnigt be developErl in the primary shotcrete lining without any significant structural damages.

  • PDF

Numerical Analysis for Carinthian Cut and Cover Tunnelling Method (카린시안 터널 공법의 기준 제안을 위한 수치 해석적 연구 - 국내 고속철도 복선터널 표준 단면을 기준으로 -)

  • Roh, Byoung-Kuk;Baek, Seung-Kyu;Cha, Min-Woong
    • Explosives and Blasting
    • /
    • v.31 no.1
    • /
    • pp.33-40
    • /
    • 2013
  • Carinthian cut and cover tunnelling method which combines cut & cover and NATM tunnel excavation method has increased the interest. Design and construction of arch concrete have been increased, but there is no applicable standards for arch concrete. Therefore, in this study numerical analysis was performed to propose standards for the Carinthian tunnelling method considering a variety of conditions such as ground conditions, tunnel overburden thickness, thickness of backfill, and overburden surface slope angle changes, linear regression equations derived to classify and organize a rational, economical, and safe Carinthian cut and cover tunneling method based proposed.

A Case Study of Underwater Blasting (수중발파 사례 연구)

  • 정민수;박종호;송영석
    • Explosives and Blasting
    • /
    • v.22 no.3
    • /
    • pp.57-64
    • /
    • 2004
  • There are two major types of underwater blasting at Korea, bridges and harbor construction work. Pier blasting for lay the foundation bridges construction is used dry excavation working (drilling and charging) after pump out water and then fire pump in water that is same as bench blasting. In contrast, underwater blasting for harbor construction and increase of harbor load depth is used to barge with digging equipment that is in oder to drilling on the surface and blasting work(charge, hook-up) under water. Thus, there are need to special concern such as charge method and hook-up method different from tunnel blasting work and bench blasting work. If do not use special concern breaks out dead pressure and mis fire because of there are so many difficult condition such as water pressure, obstruct field of vision. In this study underwater blasting at Busan Harbor Construction have consider with special concern that is plastic pipe charge method used to MegaMITE I and specialized buoy hook- up method make far initial system detonate on the surface used to TLD. The results is designed blast pattern charge per delay effect an inspection of verify between predict velocity and measure velocity. minimized break out mis fire consideration charge method, hook up method. According to result best underwater blasting design is 105mm drilling dia, MeGAMITE II, HiNLL Plus(non electric detonator).

Ground Vibration in Tunnelling by Blasting and its Effect on Surface Structures (터널굴착이 지상구조물에 미치는 영향평가 및 발파지침설계)

  • 신희순;한공창;류창하;신중호;박연준;최영학
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.463-470
    • /
    • 2000
  • In tunnel excavation by blast beneath the surface structures in urban area, the characteristics of ground vibration induced by blast and its influence on surface structures are analyzed by the field test and the numerical analysis on dynamic behaviors of the structure. According to the field test on the propagating characteristics of blast vibration through the rock mass and the concrete foundation pile. the attenuation index of peak particle velocity with distance shows the range of 1.7∼2.0 for the rock mass and the range of 2.0∼2.3 for the concrete pile. This shows that the blast vibration reduces more rapidly in the concrete pile. It is known from the numerical analysis on dynamic behavior of the structure that the coefficient of response, velocity ratio of structure response to input wave, is different according to the story of the structure. It can be said from this research that the characteristics of the ground vibration and the dynamic behavior of the structure should be well evaluated and be considered as important factors for safe blasting design especially in underground excavation at shallow depth in urban area.

  • PDF

Transformation of Measured Blasting Vibration Data to Vibration Level by Digital Filter (디지털 필터를 이용한 진동의 변환 연구)

  • Kim, Yong-Kuk;Kim, Sik;Lee, Sang-Eun;Yang, Hyung-Sik
    • Tunnel and Underground Space
    • /
    • v.10 no.3
    • /
    • pp.486-491
    • /
    • 2000
  • Blasting vibrations velocity had been used to design blasting pattern and predict damage-possibility of structures. As vibration levels are currently required to estimate the damage concerning human-body and livestock, so measured vibration velocities must be transformed into vibration levels. In this study, the digital filter program was developed to transform measured data into vibration levels. Simple harmonic vibrations and measured data obtain by Blastmate series (Instantel Inc.) were applied to the digital filter program. As a result, simple harmonic vibrations and measured data were successfully transformed into vibration levels using the developed program. Measured data from any instrument with ASCII output-function will similarly be transformed into level units.

  • PDF

A Study on the Development of the Rock Blastability Classification and the Methods for Minimizing Overbereak in Tunnel (터널 굴착면 여굴 최소화를 위한 발파암 분류(안) 및 공법 개발 연구)

  • 이태노;김동현;서영화
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.303-310
    • /
    • 2002
  • Overbreak occurred inevitably in a tunnel excavation, Is the main factor for increasing cost and time in tunnel projects. Furthermore the damage to the remained rock mass related to the overbreak can give rise to a serious safety problem in tunnels. As a rule of thumb, causes for the overbreak are inaccuracy in drilling, the wrong design of blasting and selection of explosives, and heterogeneity in rock mass. Specially, the geological features of the rock mass around periphery of an excavation are very important factors, so a lot of researches have been conducted to describe these phenomena. But the quantitative geological classification of the rock mass for the overbreak and the method for decreasing the amount of the overbreak have not been established. Besides, the technical improvement of the charge method is requested as explosives for the smooth blasting have not functioned efficiently. In this study, the working face around periphery of an excavation has been continuously sectionalized to 5∼6 parts, and the new Blastability Index for the overbreak based on 6 factors of RMD(Rock Mass Description), UCS(Uniaxial Compressive Strength) JPS(Joint Plane Spacing), JPO(Joint Plane Orientation), JPA(Joint Plane Aperture) and FM(Filling Material) is proposed to classify sections of the working face. On the basis of this classification, the distance between contour holes and the charging density are determined to minimize the overbreak. For controlling the charging density and improving the function of explosives, the New Deck Charge(N.D.C) method utilizing the deck charge method and detonation transmission in hole has been developed.

  • PDF

Slope stability method establish and carry out in vertical slope for tunnel excavation (터널의 굴착을 위한 수직사면의 안정대책 방안 수립 및 시행)

  • Park, Chal-Sook;Kim, Jun-Yong;Kwan, Han;Kim, Min-Jo;Choi, Yu-Kyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.992-1006
    • /
    • 2008
  • The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. Cutting-slope adjacent to outlet of spillways had been originally designed to be 63 degrees and about 65m in height. Examination is carried out in preceding construction that it is caused to some problems possibility which of machine for slope cutting couldn't approach to the site, blasting for cutting slope might have negative influence on highway and roads nearby, and fine view along the Tae-hwa river would be eliminated. In order to establish stability of tunnel and more friendly natural environment that we are carry out detailed geological surface survey and analysis of slope stability. So, we are design and construct for tunnel excavation with possible method that it is keep up natural slope. The result of survey and analysis that natural slope was divided 3 zone(A, B, C zone). In A and B zone, in first removed floating rock, high tensile tension net is install that it prevent of release and falling of rock, in order to security during under working. In addition to, pre-stressed rock anchor is install purpose of security during tunnel excavation because of fault zone near vertical developed above excavation level. Zone C is relatively good condition of ground, design is only carry out random rock bolt. All zone are designed and constructed drainage hole for groundwater and surface water is easily drain. Desinged slpoe is harmony with near natural environment. Successfully, construction is completed.

  • PDF