A numerical wind tunnel simulation is performed in order to predict wind loads acting on a building. The aim of the present study is to suggest a guideline for the numerical wind tunnel analysis, which could provide more detail wind load distributions compared to the wind code and expensive wind tunnel experiments. To validate the present numerical simulation, wind-induced loads on a 6 m cube model is predicted. Atmospheric boundary layer is used as a inlet boundary condition. Various effect of numerical methods are investigated such as size of computational domain, grid density, turbulence model and discretization scheme. The appropriate procedure for the numerical wind tunnel analysis is suggested through the present study.
International Journal of Aeronautical and Space Sciences
/
제13권1호
/
pp.34-42
/
2012
This paper discusses the mathematical modeling of a small scale ducted-fan UAV and examines its results in comparison to the wind tunnel test. A wind tunnel test is first performed, producing a substantial amount of test data. The acquired set of wind tunnel test data is then categorized and approximated as mathematical functions. Finally, the mathematically modeled forces and moments acting on the UAV are compared with the acquired wind tunnel data. The analysis involves a gradient-based algorithm and is applied to extract trim states with respect to various flight conditions. Consequently, a numerical analysis demonstrates that there exists a reasonable flight status with respect to airspeed.
D&B method in tunnel construction requires accurate and rapid measurement of the ground movement, which of essential for feedback analysis. Recently, survey technique adapting IT is getting more and more emphasized in the field of construction and tunnel survey also follow the same trend. Case study and adaptability of IT technique for tunnel survey will be discussed in this study. The application of laserscannig method in the field of tunnel construction was reported in several advanced country including Austria and Japan. Survey for the crown and shoulder movements by IT survey method was conducted and the results were compared to those do the conventional method. The pipe-roof, grouting, ring-cut are installed in the this site to prevent expected large ground settlement. The result show that laserscanner system is prefered rather than conventional method in that better understanding for the displacement condition and origin condition was liable by the lasersacnnig method. IT survey solution makes if possible to execute more economic and safe construction.
In this study, a database composed by 46 cases of tunnel collapses has been built up. Based on the database, comprehensive data analysis is carried out, providing us a number of the technical lessons, which can be considered in future design and construction to minimize possibility of tunnel collapse disaster. For making a better understanding, the technical lessons are given in two divisions: mountain tunnel and urban tunnel. Tunnel collapses taking place in the former tunnel are generally due to bad discontinuity condition of jointed rock mass. Otherwise, urban tunnel has weak condition generally on ground water and weathering of ground. Most of technical comments given in this paper are made based on the cases of tunnel collapses only used in this study, so that the comments seems to be hard to be available to all the tunnelling cases. However, the comment should be valuable technical lessons for tunnel engineers to consider in tunnel design or construction.
Common utility tunnel is essential to the daily lives of people underground utilities (electricity, gas and supply facilities such as water, communication facilities, sewer facilities, etc.) to improve the appearance by co-acceptance and disaster prevention, important for the conservation of the city's population was concentrated road construction the city-based facilities. There is recognition of the importance of the various supply treatment facilities in common utility tunnel as infrastructure to accommodate joint according to the city expanded, the demand for infrastructure. In this paper, a cost-benefit analysis using a one-time occurrence, without simply relying on cost or current cost, project manager for the city-dimensional feasibility study conducted, the user level of the maintenance costs and user costs, including social costs items from various angles can be investigated and proposed a mechanism of economic feasibility common utility tunnel. Evaluation of the proposed technique is cost-benefit and cost caused by installing common utility tunnel the existing pipeline area - was investigated by the benefit analysis, extended and repeated common utility tunnel installation depends much affected by the excavation, so users of reducing the number of repeat excavation convenience can be seen that this occurs.
고준위폐기물의 처분개념 실증을 위해 원자력연구소부지 내에 지하연구시설을 건설하는 경우, 지표면지형의 변화, 두터운 풍화대의 존재가 예상된다. 본 연구에서는 부지 특성과 터널의 경사 및 터별의 크기에 따른 영향 분석과 함께 수백 m의 터널을 단계적으로 굴착하는데 따른 영향을 FLAC3D를 이용한 3차원 구조해석을 통해 분석하였다. 해석결과 굴착을 단계적으로 실시하는데 따르는 응력이나 변위분포에는 차이가 없는 것으로 나타났으며 이는 지하연구시설의 부근에서는 응력재분포에 의한 소성영역의 발생은 없기 때문이다. 최대 응력으은 5 ㎫로 압축응력이 작용할 것으로 예상된다. 최대응력은 터별의 끝 부분에서 20 m 전방으로 터별의 벽면에서 발생할 것으로 예상되며 터널 경사각이나 풍화대의 크기, 터널의 크기변화에 따른 터널에서의 응력과 변위분포 변화는 거의 없는 것으로 나타났다. 진입터널과 연구모듈의 교차지점에 대한 모델링 결과 응력비 K가 3인 경우 구조적으로 가장 취약한 지점에서의 안전계수가 3이상으로 나타난다. 본 연구를 통해 원자력연구소 내 예상 부지에 소규모 지하연구시설을 구조적으로 안전하게 건설하는 것이 가능함을 보일 수 있었다.
Silo is a warehouse for storing granular materials such as grain, cement, petroleum compound and coal. When compared to other warehouses, the silo can use space efficiently. The coal silo are consists of silo, tunnel and extractor. Of these, there are not sufficient study and design data on tunnel. It depends heavily upon trial and error method by field engineers with several years of experience. Recently, silos are constructed with a large size, and tunnel becomes to be in danger of severe cracking and collapse by a huge load of coal. So it is necessary to analyze structural safety for tunnel. In this study, the problems of the tunnel are analyzed by field data, and reinforcement of structural weak area using FE analysis has been carried out to design the tunnel satisfying structural safety. From FE Analysis, the reinforced model which does not exceed the yield strength of the material has been proposed.
기존의 공동구에 관한 연구에서는 공동구 내부의 수용시설물들의 최적설계 및 타당성 분석 보다는 공동구 설치와 관련된 전반적인 사항에 대하여 검토 하였다. 공동구 도입과 관련된 기본계획 단계에서의 관련 지표 및 자료 등의 부족으로 수용시설물을 결정하기가 어려운 한계점을 해결하고자, 본 논문에서는 공동구 내 수용시설물의 최적 대안 결정을 위하여 VE/LCC 분석 방법을 제시하였다. 개별 수용시설물의 항목에 대한 분석 및 LCC 비용에 대한 가치지수를 종별 대안에 적용하여 검토 하였으며, 각 종별 우선순위를 분석하였다. 또한, 국내 공동구와 각 종별 시설물의 분석된 결과를 비교하였으며, 본 연구의 결과는 공동구의 도입 시에 최초 설계자를 포함한 사용자들이 수용시설물을 결정하는 과정에서 소요되는 시간을 단축하고 편의성을 높이는데 도움이 될 것으로 판단된다.
본 논문에서는 터널굴착으로 발생한 지표면에서의 최대 침하 및 수평변위와 총 침하부피량을 추정하기 위하여 서로 상이한 지층에서 다양한 깊이 및 직경, 서로 다른 시공조건(지반손실량)을 가진 터널에 대해 수치해석을 수행하였다. 수치해석 결과로부터 얻어진 지표면에서의 최대 침하량은 터널 굴착부 천단에서의 최대 침하량과 지층별, 터널직경 및 깊이, 시공조건(지반손실량)별로 비교되었으며, 또한 지표면에서의 최대 침하량은 지표면에서의 최대 수평변위량과도 비교하였다. 뿐만 아니라, 터널굴착부에서 발생한 지반손실량($V_L$)과 지표면에서 형성된 총 침하부피량($V_s$)을 지층 및 터널깊이와 직경을 달리하여 상호 비교하였다. 수치해석을 통해 얻어진 결과는 그 적용성과 타당성을 검증하기 위하여 기존 현장계측자료와의 비교가 수행되었으며, 이를 통해 본 연구의 수치해석 결과가 향후 터널굴착으로 발생된 주변 지반의 거동을 파악하고 분석하는 실무자료로서 활용될 수 있다는 것을 파악하였다.
본 연구는 한 경부 고속철도 터널의 NATM 굴착에 의한 2 arch 확공 굴착 시 발생되는 진동 및 응력의 변화가 터널 및 인근 사면에 미치는 영향을 사전에 파악하여 안정성을 검토하는 데에 그 목적이 있다. 지반물성치를 산정하기 위해 시추공 조사, TV검층 및 속도검층을 실시하였다. 2차원 해석을 통해 불확실한 지반의 물성을 변수로 간주하고 가능한 범위 내에서 해석을 수행함으로서 특정한 지반 물성이 입력 정수로서 결정되었다. 정적 및 발파 진동에 의한 준-정적(pseudo-static)안전율을 계산하였으며, 3차원 해석을 통해 터널굴착으로 인한 터널 및 터널 주변의 거동과 터널 지보재의 적정성 여부를 조사하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.