• Title/Summary/Keyword: Tunnel Safety Facility

Search Result 72, Processing Time 0.022 seconds

Analysis of Landscape Preference by the Installation Combination of Lightning in Tunnel based on Conjoint Analysis (컨조인트 분석에 의한 터널 내 조명시설 설치조합별 경관 선호도 분석)

  • Lee, hyeryung;Kum, kijung;Jung, hyunjung
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.111-120
    • /
    • 2012
  • PURPOSES : This study is to suggest suitable lighting facility installation plans by finding out driver's preference for combination of lighting facility installation among landscape factors that affect driver visibility in tunnels. METHODS : SD method is used to extract emotional factors that affect drivers' preference, Components of tunnel lighting facility installation are evaluated through conjoint analysis and it suggested relative importance of attributes and utility values. RESULTS : In the aspects of satisfaction levels of components of tunnel lighting facility installation, Tunnel side, two lows, and solid line arrangement type has the highest level of satisfaction. Extract emotional factors that affect drivers' preference are "safety", "openness" and "amenity." In addition, the result of analyzing relative importance of attributes of tunnel lighting facility shows that numbers of lighting array has the highest importance and lighting facility arrangement has the lowest importance. Result of analyzing partial utility shows that the 2 low type among number of lows, the solid line arrangement type between arrangement types, placing in the middle part among lighting facility arrangement were highly preferred. CONCLUSIONS : In the case of lighting numbers, utility values of the first line and the second line showed us a big difference. Increasing the number arrays in the future reformation of lighting facility installation combination will be effective in enhancing the utility of the driver.

An effective prevention facilities for railway tunnel design by using Quantitative Risk Analysis (효율적 방재시설을 위한 정량적 위험도 분석)

  • Kwon, Soon-Sub;Shin, Hwa-Cheol;Jung, Ji-Seung;Min, Dae-Hing
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1080-1084
    • /
    • 2007
  • Recently, as demands of new railway and the relocation of existing line, a number of tunnel structures have been constructed. Tunnel structures contribute to minimize the cost and time of transport, but in case of railway fire accident bring serious damages of human life caused by narrowness of shelter, smoke and high temperature, difficulty in rescue. For that reason, at the beginning of plan of tunnel, the optimum design of safety facility in tunnel for minimizing the risks and satisfying the safety standard is needed. In this study, QRA(Quantitative Risk Analysis) technique is applied to design of railway tunnel for assuring the safety function and estimating the risk of safety. The case study is carried out to verify the QRA technique for railway tunnels in Iksan-Sili.

  • PDF

Understanding Facility Management on Tunnel through Text Mining of Precision Safety Diagnosis Data (터널시설물 점검진단 데이터의 텍스트마이닝 분석을 통한 유형별·지역별 중점 유지관리요소의 이해)

  • Seo, Jeong-eun;Oh, Jintak
    • Journal of Korean Association for Spatial Structures
    • /
    • v.21 no.3
    • /
    • pp.85-92
    • /
    • 2021
  • The purpose of this paper is to understand the key factors for efficient maintenance of rapidly aging facilities. Therefore, the safety inspection/diagnosis reports accumulated in the unstructured data were collected and preprocessed. Then, the analysis was performed using a text mining analysis method. The derived vulnerabilities of tunnel facilities can be used as elements of inspections that take into account the characteristics of individual facilities during regular inspections and daily inspections in the short term. In addition, if detailed specification information and other inspection results(safety, durability, and ease of use) are used for analysis, it provides a stepping stone for supporting preemptive maintenance decision-making in the long term.

Assessment Items for the Level of Service for Tunnel Facilities from an Asset Management Perspective (자산관리관점에서 터널시설물의 서비스 수준 평가항목에 관한 연구)

  • Jeong, Seong-Yun;Nah, Hei-Suk;Choi, Won-Sik
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.1
    • /
    • pp.68-79
    • /
    • 2012
  • Korea was followed by a rapid increase in road construction investment in late 1980s with the help of strong economic conditions. As a result of such investment, it will be expected that there must be a rapid increase in demand for maintenance or rehabilitation of the facilities after 2010. We are developing asset management information systems for enhancing user's satisfaction and innovating the facility management techniques within a limited budget. We suggested the assessment items for the Level of Service for tunnel facility's operation and maintenance(O&M), in this study. We have surveyed for the importance of assessment items by considering both user's viewpoints and facility management agency's viewpoints. We came to realize the relative importance of the items based on this survey using the Analytic Hierarchy Process(AHP) method proposed by Satty. The relative importance of assessment items in terms of the user's viewpoint was identified in descending order such as safety, mobility, accessibility, convenience, O&M efficiency, comfort, rural revitalization, environment, and information. Also, the importance of the items in terms of the management agency's viewpoint was identified in descending order such as safety, mobility, accessibility, environment, rural revitalization, convenience, O&M efficiency, information, and comfort. It means that safety of tunnel facilities is more important than mobility, although which is the basic function of the road facility, both in agency's and user's concern. Therefore, the agencies have to pay more attentions and efforts to ensure safety of tunnel facilities when they establish the investment plans for the tunnel facility O&M.

Wind-Resistant Safety Reviews of Cable-Stayed Bridge by Wind Tunnel Tests (풍동실험을 통한 사장교의 내풍 안전성 검토)

  • Huh, Taik-Nyung
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.4_2
    • /
    • pp.637-644
    • /
    • 2020
  • Because suicide accidents sometimes were happened in grand bridges over rivers or sea water recently, it will be necessary that prevention measures be made preparation in advance from now on. Additional safety facilities must be needed in addition to existing safety facilities in such a way as this prevention measure. In order to make cable-stayed bridge safe on wind for additional safety facilities, main girder models with added safety facilities for wind-tunnel tests was made, and wind tunnel experiments was carried out to measure aerodynamic force coefficients. Also, wind-resistant analyses of 3D cable-stayed bridge were performed on the basis of wind-tunnel test results. From the wind experiments, force coefficients of main girder with added safety facilities were assessed, and it is known that there are little possibility of galloping and rotation of steel main girder. Finally, from the wind resistant analyses, it was concluded that wind-resistant safety of cable-stayed bridge was secured on wind speed 60.6m/sec.

A study on the estimation of safety in long railway tunnel (장대 철도터널에서의 방재 안전성 평가에 관한 연구)

  • Kim, Young-Geun;Kim, Dong-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.3
    • /
    • pp.287-298
    • /
    • 2007
  • Recently, as the construction of new railway and the relocation of existing line increase, tunnel structures get longer. The railway fire accidents in long tunnel bring large damages of human life and disaster. The interest on safety in long tunnel has been growing and the safety standard for long tunnels is tightening. For that reason, at the planning stage of a long tunnel, the optimum design of safety facility for minimizing the risks and satisfying the safety standard is required. For the reasonable design of a long railway tunnel considering high safety, qualitative estimation for tunnel safely is required. In this study, QRA (Quantitative Risk Analysis) technique is applied to design of a long railway tunnel for assuring the safety function and estimating the risk of safety. The case study for safety design was carried out to verify the QRA technique for two railway tunnels.

  • PDF

The Quantitative Risk Assessment for Railroad-tunnel Fire Incidents by using CFD code (CFD code를 이용한 철도터널 화재 위험도 평가)

  • Kim, H.B.;Lee, D.H.;Jang, Y.J.;Jung, W.S.
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.169-172
    • /
    • 2011
  • Recently, railroad long tunnels are increasing and growing longer due to topological feathers like a lot of mountain in Korea. But fire disaster of a long tunnel cause many people to injury and death. For that reason, at the early design stage of a long tunnel, risk assessment and mitigation measure of risk for satisfying tunnel safety are required. According to the railroad facility safety standard (Korean MLTM Announcement No. 2006-395), risk assessment for railroad-tunnel fire should be performed when design stage. Therefore, various methods of risk assessment for tunnel fire have been studied and applied. In the paper, QRA(Quantitative Risk Analysis) for fire risk assessment by using CFD code is presented and the usefulness of CFD is discussed.

  • PDF

Decision technique for accommodation facilities of multi-utility tunnel in basic planning phase (기본 계획 단계에서의 공동구 수용시설물 결정 기법)

  • Oh, Won-Joon;Jin, Kyu-Nam;Kang, Yeong-Ku;Cho, Choong-Yeun;Sim, Young-Jong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.79-92
    • /
    • 2019
  • In this paper, we propose a method to determine whether to install the accommodation facility of the multi-utility tunnel more effectively in the basic planning phase, and to set up an evaluation system to determine the configuration and kind of accommodation facility. For the configuration of the accommodation facility, 98 alternatives were analyzed for 7 accommodation facility. For the evaluation system of the accommodation facility, index related to feasibility and economic in basic planning phase were selected. The evaluation system classified as spatial, effective, and cost evaluation was presented reflecting the selected index, and AHP analysis was performed for weight setting. The results of this study will be helpful for users including designers to shorten the time and increase the efficiency in the process of determining accommodation facility of the multi-utility tunnel in basic planning phase.

Experimental Study on Calculation of Critical Velocity in Accordance with Gradient of a Road Tunnel at Fire (도로터널 화재시 경사도에 따른 임계풍속산정에 관한 실험적 연구)

  • Kim, Jong-Yoon;Seo, Tae-Beom;Rie, Dong-Ho;Lim, Kyung-Bum;Yoo, Ji-Oh
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.5 s.77
    • /
    • pp.1-5
    • /
    • 2006
  • This study provides a basic data necessary to design a facility of smoke management after calculating the critical velocity of the gradient scale model tunnel and reviewing its adequacy to establish an optimum disaster prevention system for a road tunnel at fire. The experiment is carried out by using Froude scaling to a scale model which is about 1/29 as big as the real tunnel, and its critical velocity calculation is calculated to the 0-2% gradient of the tunnel. The result shows that the higher the gradient is, the stronger the critical velocity, but that it doesn't affect the critical velocity so much when the gradient is less 2%. In addition, this result is studied in comparison with the results done by other researchers to review the adequacy of the critical velocity.

Estimation of Safety in Railway Tunnel by Using Quantitative Risk Assessment (QRA를 이용한 철도터널 방재 안전성 평가)

  • Kim, Do-Sik;Kim, Do-Hyung;Kim, Woo-Sung;Lee, Du-Hwa;Lee, Ho-Seok
    • Tunnel and Underground Space
    • /
    • v.16 no.5 s.64
    • /
    • pp.357-367
    • /
    • 2006
  • Recently, as the construction of new railway and the relocation of existing line increase, tunnel structures grow longer. The railway fire accidents in long tunnel bring large damages of human life and disaster. The interest of safety in long tunnel have a growing and the safety standard of long tunnel is tightening. For that reason, at the planning of long tunnel, the optimum design of safety facility in long tunnel for minimizing the risks and satisfying the safety standard is needed. For the reasonable design of long railway tunnel considering high safety, qualitative estimation for tunnel safety is required. In this study, QRA (Quantitative Risk Assessment) technique is applied to design of long railway tunnel for assuring the safety function and estimating the risk of safety. The case study for safety design in long railway tunnel is tarried out to verifying the QRA technique for two railway tunnels. Thus, the inclined and vertical shaft for escape way and safety facilities in long tunnel are planned, and the risks of tunnel safety for each case are estimated quantitatively.