• Title/Summary/Keyword: Tunnel Length

Search Result 606, Processing Time 0.026 seconds

Analysis of the Characteristics of the Tidal Current Power Generation System Using PMSG and Water Tunnel (영구자석 동기발전기와 회류수조를 이용한 조류발전 시스템의 특성 해석)

  • An, Won-Young;Lee, Seok-Hyun;Kim, Gun-Su;Lee, Kang-Hee;Jo, Chul-Hee
    • New & Renewable Energy
    • /
    • v.9 no.1
    • /
    • pp.44-50
    • /
    • 2013
  • In order to analyze the characteristics of tidal current power generation system, we measured the output power according to the stream velocity by a water tunnel system and a simulation in MATLAB/Simulink. The water tunnel system consisted of impeller tidal flow transducer and PMSG with rotor in the water. The simulation consisted of PMSG, the tidal current turbine, and back-to-back converter. Also, we simulated the characteristics of output power according to the change of blade length and angular velocity.

Effects of Rock Weathering on the Degradation of Engineering Properties (암반풍화도에 따른 지질공학적 특성 저감효과)

  • Lee Chang-Sup;Cho Taechin
    • Tunnel and Underground Space
    • /
    • v.15 no.6 s.59
    • /
    • pp.411-424
    • /
    • 2005
  • Weathering is defined as a process by which surface rock, once formed in the deep ground, is broken down and altered to keep the equilibrium with the ambient environment. In this study granitic rock samples of different weathering grades were collected in the field and the microscopic observation, X-ray diffraction analysis, electron microscopic observation, chemical analysis, and rock property tests were carried out. Formation of secondary minerals, especially clay minerals, by weathering was identified and the mechanism for the change of engineering properties such as rock strength degradation was analyzed. Tunnel model test, Failure behaviour, Shallow tunnel, Unsupproted tunnel length.

프리캐스트 판넬을 이용한 장대터널 내부라이닝 개선방안 연구

  • Lee, Du-Hwa;O, Se-Jun;Choe, Chang-Rim
    • 도로교통
    • /
    • s.84
    • /
    • pp.23-39
    • /
    • 2001
  • Increasing constructions of tunnels are become larger of the size and longer of the length. Construction of the tunnellinings is in poor working environment, for example, dark and narrow underground. Therefore, it is difficult to constructlining by required quality in these poor working conditions. In case of the designing tunnel in large scale, particularly, there may be several problems as follows; delay of construction due to a long time in constructing lining and difficulty of quality control. It is also indicated that longitudinal cracks of them are main defects in domestic tunnels. Therefore, in this study, the precast lining method is introduced for solving problems, which are delay of the tunnel construction a d deterioration of tunnel lining. Precast linings have mainly been constructed in Norway and North Europe. A new construction method of tunnel lining, suitable in domestic situation, is introduced by detailed case study. Also, useful materials for design and construction of Precast lining are presented.

  • PDF

Development of Vision-Based Inspection System for Detecting Crack on the Lining of Concrete Tunnel (비젼센서를 이용한 콘크리트 터널 라이닝 균열검사 시스템의 개발)

  • 고봉수;조남규
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.20 no.12
    • /
    • pp.96-104
    • /
    • 2003
  • To assess tunnel safety, cracks in tunnel lining are measured by inspectors who observe cracks with their eyes. A manual inspection is, however, slow and subjective. This paper, therefore, proposes vision-based inspection system for measuring cracks in the tunnel lining that inspects cracks fast and objective. The system is consisted of an on-vehicle system and a lab system. An on-vehicle system acquires image data with line CCD camera. A lab system extracts crack then inform their thickness, length and orientation by using image processing. To improve accuracy of crack recognition the geometric properties of a crack was applied to image processing. The proposed system were verified with experiments in both laboratory and field environment.

Performance evaluation of an underwater body and pumpjet by model testing in cavitation tunnel

  • Suryanarayana, Ch.;Satyanarayana, B.;Ramji, K.
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.2 no.2
    • /
    • pp.57-67
    • /
    • 2010
  • Experimental investigations were carried out on an Axi-symmetric Body Model fitted with Pump-jet Propulsor (PJP) in the Cavitation Tunnel at Naval Science and Technological Laboratory (NSTL). The tests were intended for evaluating the propulsion characteristics of the body and propulsor. The self propulsion point of the model for two configurations was determined after finding the corrections for tunnel blockage effects and differences in model length at zero trim. The results were found to match closely with the towing tank results. The rotor and stator torques also matched closely over full range of experiment. Further experiments were carried out on the body at $4.5^{\circ}$ angle of trim to investigate the propulsive performance and assess the operational difficulties in the sea. The results indicated an increase in resistance and decrease in rotor thrust; but the balance of torques between the rotor and stator was undisturbed, causing no concern to vehicle roll.

Numerical Study of effects on micro-pressure wave reduction by a hood on a narrow tunnel (후드를 이용한 협소 터널 미기압파 감소 효과에 대한 수치적 연구)

  • Yun Su-Hwan;Kim Byung-Yeol;Ku Yo-Cheon;Lee Dong-ho;Kwon Hyeok-Bin;Ko Tae-hwan
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.872-877
    • /
    • 2005
  • The train entry into a tunnel generates a strong compression wave in the tunnel. The high amplitude of compression wave causes high pressure gradients that are responsible for both the aural discomfort of passengers and the impulsive acoustical wave called the miro-pressure wave. This paper provides a numerical study on effects of hood for micro'-'pressure wave reduction. An axisymmetric numerical solver, considering the cross sectional area of Korean Tilting Train eXpress, is used for a transient flow field in the tunnel. Results show that the micro-pressure wave is able to be reduced by a hood. In this results, the maximum reduction of micro--pressure wave is shown at 2L(length), 1.35D(diameter) hood around $56\%$ against the non-hood case.

  • PDF

한강 하저터널에서의 암반분류 및 평가사례

  • 박남서;이치문;김은섭
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.06b
    • /
    • pp.165-193
    • /
    • 2003
  • The Han River tunnel connecting Yoido and Mapo was constructed as a part of the Seoul subway line No.5, which is 52 km long, to improve the traffic conditions of Seoul. It is constructed 15.6∼30m below the river floor. It Is the first under-river tunnel in Korea with the length of 1,288m. Geological conditions of the ground under the Han River were more complex and irregular than expected at the design stage, because there were several faults, fracture zones and slickensided joints coated with graphite. It was thus indispensable to estimate the ground condition of the tunnel face to apply proper excavation and reinforcement methods. Advance borings and face mappings were performed before excavation to improve constructional efficiency and excavation stability.

  • PDF

Analysis and cause of defects in reinforced cement concrete lining on NATM tunnel based on the Precise Inspection for Safety and Diagnosis - Part I (정밀안전진단 결과를 활용한 NATM (철근)의 라이닝 결함 종류별 발생원인 및 분석 - Part I)

  • Choo, Jinho;Lee, Inmo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.1-29
    • /
    • 2019
  • Related to the previous paper on the typical crack pattern of tunnel lining with NATM, the characteristic defects in reinforced cement concrete lining of NATM tunnel have analyzed with the precise inspection with safety and diagnosis (PISD) by KISTEC. Depending on the reinforcing materials, steel rebar, steel fiber, and glass fiber have been implemented to reinforcing lining in various NATM tunnel constructions. Reinforcing lining with rebar are prevailed on NATM tunnel to countermeasure the weak geological circumstances, to pursuit the economical tunnel sections, and to resist the risk of tunnel deterioration. By the special act on the safety control of public facilities, the reinforced NATM tunnels for more than 1 km length are scrutinized closely to characterize defects; crack, reinforcement exposure, and lack of lining. Crack resistance by reinforcing is shown in comparison with the normalized crack to the length of tunnel. Typical exposed reinforcements in lining have exemplified with various sections. The lack of lining due to the mal-construction, spalling, fire, earthquake and leaching has been analyzed. The cause and mechanism with the field inspections and other studies has also been verified. Detailed cases are selected by the above concerns as well as the basic information from FMS (Facilities Management System). Likewise the previous paper, this study provides specialized defects in reinforced lining of NATM and it can be widely used in spreading the essential technics and reporting skills. Furthermore, it would be advised and amended for the detail guideline of Safety Diagnosis and PISD (tunnel).

A Study on the Improvement of Temporary Ventilation of long tunnel Using the Field Measurement data (현장 실측을 통한 장대터널 공사중 환기 문제점 연구)

  • Hong, Chang-Soo;Hwang, Dae-Jin;Kang, Hyun-Wook
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1350-1357
    • /
    • 2010
  • In tunnelling, temporary ventilation is very important factor in the safety of worker and the work efficiency which is affected by visibility. There are a lot of problems in the recent tunnel construction, because the longer the tunnel, the more the present design doesn't satisfy the allowable standard about dust and air pollution. Especially, In case the length of tunnel is more than 1,000m, the ventilation efficiency tends to decrease. In this study, the field measurement of the degree of contamination was performed near the face of tunnel. Based on the results obtained, the main factors of problem in temporary ventilation are the difference of temperature between outside and inside, the rate of leakage of ventilation duct and the dust and so on. It maybe helpful to the solution of problems, and also the accurate ventilation estimate.

  • PDF

Experimental Study on the Slit Cover Hood for Reducing the Micro Pressure Waves in High-speed Train-tunnel Interfaces (고속철도에서 슬릿커버후드의 터널 미기압파 저감성능에 관한 연구(II))

  • Kim, Dong-Hyeon;Shin, Min-Ho;Han, Myeong Sik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.2 no.3
    • /
    • pp.3-11
    • /
    • 2000
  • Purpose of this paper is to investigate the hood configuration at a tunnel entrance to reduce the micro pressure wave that is generated according to train speed. Two configurations were examined for the tunnel of 0.5 km in length. The experimental results show that a slit cover hood installed at the entrance of the tunnel reduces the maximum micro pressure wave by 41.2%, and the configuration with a slit cover hood installed at the entrance and the $45^{\circ}$ slanted portal at the exit of the tunnel suppress the pressure wave by 47.7%.

  • PDF