• Title/Summary/Keyword: Transportation and installation

Search Result 333, Processing Time 0.025 seconds

A Study on the Sea Areas Dynamic Stability of LL-26(M) Light Buoy (LL-26(M) 등부표의 해역별 동적안정성에 관한 연구)

  • Moon, Beom-Sik;Gug, Seung-Gi;Kim, Tae-Goun
    • Journal of Navigation and Port Research
    • /
    • v.44 no.3
    • /
    • pp.166-173
    • /
    • 2020
  • AtoN Accident causes navigation dangerous to ships and reduces the credibility of aids to navigation. The most light buoys on the sea have the highest accident rate from the influence of sea weather such as wind, current, and waves. However, in Korea, despite the different sea weather conditions in each sea area, in calculating the dynamic stability of the light buoy, there is a problem that only limit value conditions are applied to all sea areas. Thus, the purpose of this study was to analyze the dynamic stability of the LL-26(M) light buoy, the most installed buoy of its kind on the sea and suggest a stable operation plan for the LL-26(M) light buoy. To achieve this, after analyzing the weather for each sea area of the previous study related to the light buoy, the dynamic stability (inclination angle) was estimated by applying to the representative light buoys of each sea area wherein the number of accidents caused by sea weather was high. As a result of this study, the inclination angle of LL-26(M) light buoy for each sea area was different. That is, the inclination angle caused by winds was 10.329°-36.868°, the inclination angle caused by currents was 0.123°-18.834° and the inclination angle caused by waves was 4.777°-20.695°. The results of study can be used as basic data useful for installation standards for each sea area for stable operation of the LL-26(M) light buoy.

A Study on Value Evaluation of Smart Intermodal-Transfer Service (복합환승센터 스마트환승정보서비스에 대한 이용자 가치 추정 연구)

  • Lim, Jung-Sil;Kim, Sung-Eun;Lee, Chunl-Ki
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.11 no.4
    • /
    • pp.19-33
    • /
    • 2012
  • Ministry of Land, Transport and Maritime Affairs prepared the method to update traffic connection system by amending "National Transport System Efficiency Act(hereinafter Act)". The key is a development of Intermodal Transfer Center. The law and guideline related with Intermodal Transfer Center requires the installation and operation of transfer information guide facility to improve user's convenience. However, there are no sufficient studies that can be used as references for the method to construct transfer support information system related with user's preference. The study performed the research about user's service satisfaction in relation with transfer support information service, which was embodied in model operation process, on the basis of transfer support information system of Intermodal Transfer Center applied to Gimpo Airport. The analysis result about service preference, importance of each supplied information, service satisfaction and consideration for service embodiment can be used as a guideline to embody the user information service of Intermodal Transfer Center. In addition, through CVM, the study estimated and proposed the service valuation of smart intermodal transfer service that provides customized information to cope with user's situation and traffic means operation status among transfer support information service. It is determined that the study will measure the benefit of Intermodal Transfer Center user by using monetary value when smart intermodal transfer service is supplied and provide the ground to expand high-tech transfer information service with high usefulness and convenience.

Study on the Appropriate Time for Leading Pedestrian Intervals (보행자 우선 출발신호의 적정 시간 산출 연구)

  • Kim, Daekyung;Yoon, Suyoung;Yoon, Jinsoo;Kim, Sang-Ock;Yun, Ilsoo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.19 no.3
    • /
    • pp.1-13
    • /
    • 2020
  • When pedestrians cross a pedestrian crossing during a pedestrian signal, there is a problem that pedestrians are exposed to the danger of traffic accidents due to permissive-left turning and right-turning vehicles. In order to solve this problem, there is an increasing demand to improve the traffic signal system to increase pedestrian safety at the signal crossing. This study aims to examine the feasibility of introducing a leading pedestrian interval(LPI) to prevent conflict between unprotected left and right turn vehicles and pedestrians. In this study, the need for LPI was surveyed by experts and the general public. As a result of the survey, many opinions indicated that the introduction of LPI was necessary. In addition, after selecting the non-protected left and right turn pilot operation targets, LPI was installed on two signal intersections. After installation, the speed analysis of the arrival vehicle in the pedestrian crossing and the violation rate of the pedestrian signal were analyzed. As a result of analysis, when the walking signal was equalized, the speed of the arriving vehicle in the pedestrian crossing was reduced, and the violation rate of the walking signal was improved.

Feasibility Study of Pressure Letdown Energy Recovery from the Natural Gas Pressure Reduction Stations in South Korea (한국의 천연가스 도시정압기지에서 감압에너지 회수에 대한 타당성 연구)

  • Yoo, Han Bit;Hong, Seongho;Kim, Hyo
    • Journal of the Korean Institute of Gas
    • /
    • v.19 no.3
    • /
    • pp.9-17
    • /
    • 2015
  • Almost all of the natural gas consumed in South Korea is compressed into very high pressure for the transportation through the underground pipelines, then reduced in pressure regulation stations before delivery to the consumer. For pressure reduction, expansion valves have been used due to the simple and effective installation, but recover none of the energy in the gas during compression. Hence, turbo-expanders are proposed instead of the valves to accomplish the same pressure letdown function and recover some of the compression energy in the form of shaft work converting into electric powers. Here we have theoretically calculated the electric powers at the pressure reduction from 68.7 bar to 23 bar (which are the average values taken at the inlet and outlet points of the expansion valve in medium-pressure regulation stations) according to the inlet conditions of temperature and flow rate. The natural gas is considered as two cases of a pure methane and the mixture of hydrocarbons with a very small amount of nitrogen, and the Peng-Robinson equation of state is employed for the calculation of required thermodynamic properties. The electric energy is recovered as much as 1596 MW(methane) and 1567 MW(mixture) based on the total supply of natural gas in 2013.

Algorithm Deciding Offshore Cable Layout Valid for Integrated Power Supply Between Adjacent Islands (근거리 도서간 통합전력공급에 유효한 해저케이블 포설 방안 결정 알고리즘)

  • Kim, Mi-Young;Rho, Dae-Seok;Moon, Guk-Hyun;Seo, In-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.2
    • /
    • pp.28-36
    • /
    • 2018
  • Islands are supplied with power from diesel generation or from photovoltaic power generation, and problems with offshore environmental impacts (age deterioration, salt pollution), environmental pollution (exhaust gas, noise, dust) and power generation costs (installation, maintenance) have increasingly emerged. In 2016, the cost recovery rate was only 27%, and deficits reached 73% on 65 islands managed by KEPCO. In terms of deficits, the costs incurred in the power generation sector accounted for 91%, with the ratio of fixed costs at about 60%. Analysis suggests that operating costs can be reduced with an optimal power supply system that improves power generation efficiency and makes operating systems more efficient. Therefore, it is possible to simplify fuel transportation and facility maintenance, because one island integrates the power plants of remote islands, and offshore cable is used to supply power to the other islands. From the economic evaluations in this paper, an algorithm deciding offshore cable layout validity for an integrated power supply between adjacent islands is presented. Simulation results based on the proposed algorithm confirmed that an integrated power supply is economical for existing stand-alone operations on islands having diesel generation, low peak power, and near distances.

A Case Study on the effects of Elephant Foot Method considering the rate of Changes in Tunnel Cross Section (터널 단면적 변화를 고려한 각부보강 영향성 평가)

  • Lee, Gil-Yong;Oh, Hyeon-Mun;Cho, Kye-Hwan;Oh, Jeong-Ho;Kim, Jong-Ju;Kim, Yong-Seong
    • Journal of the Korean Geosynthetics Society
    • /
    • v.17 no.1
    • /
    • pp.111-118
    • /
    • 2018
  • In case of excavation of the tunnel under weak ground conditions, such as fault zone, leg pile reinforcement with the purpose of suppressing tunnel crown settlement and side wall displacement is commonly applied. There are convergence, crown settlement, leg settlement, and the axial force of leg as a main factor for confirming the safety of support considering the installation angle and length of leg pile reinforcement according to the increase in rate of change of tunnel cross-section. In particular, the influence of right corner settlement, among variables for safety confirmation during excavation, has been analyzed as the dominant factor in the most important priority management showing larger displacement tendency than the increase in rate of the cross-section. And, it was analyzed that the occurrence tendency of axial force on leg pile reinforcement showed the influence of behavior according to the friction support concept mechanism of the pile reinforcement rather than the increase in rate of tunnel cross-section, as it showed a small increase compared to the increase rate of the tunnel cross-section which did not show a great correlation from the viewpoint of the change of the axial force by the length of each leg pile reinforcement with regards to the change in rate of increase in tunnel cross-section. If a certain length of the leg pile reinforcement is selected based on the above grounds, even if the cross-section of the tunnel in poor ground condition is somewhat larger, it has been proved to be a more reasonable method considering the workability and economical efficiency by not extending the length of the leg pile reinforcement by force.

A Proposal for Optimizing Unit Modular System Process to Improve Efficiency in Off-site Manufacture, Transportation and On-site Installation (유닛 모듈러 공법의 효율성 확보를 위한 공장제작, 운반, 현장설치의 최적 공정 제안)

  • Lee, Kwang-Bok;Kim, Kyung-Rai;Shin, Dong-Woo;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.14-21
    • /
    • 2011
  • A unit modular system is a construction method which installs on site by manufacturing 50%~90% of the whole process in the factory. This method can minimize the process in the site and maximize the operation, which will reduce the duration and improve the overall quality. The recent paradigm of construction is to be sustainable building. Modular system can be regarded as a sustainable building construction method because it can reduce the amount of construction waste by recycling partial or whole part of overdue building be torn down. A unit modular system is the answer to cope with the increasing market of small size housings. A unit modular system is the most appropriate option at this point. This research proposes the standard operation and construction process of modular system, which enable to optimal system. A case study of reconstructing small-size housing was introduced to support this proposal. Finished unit modular is the reasonable way. However, 80% of complication rate of the modular is the most rational when a defect occurrence during delivery is considered.

Life Cycle Assessment (LCA) of the Wind Turbine : A case study of Korea Yeongdeok Wind Farm (한국 영덕 풍력단지 사례 연구를 통한 풍력 발전의 환경 영향 평가)

  • Jun Heon Lee;Jun Hyung Ryu
    • Korean Chemical Engineering Research
    • /
    • v.61 no.1
    • /
    • pp.142-154
    • /
    • 2023
  • As the importance of the environment has been recognized worldwide, the need to calculate and reduce carbon emissions has been drawing an increasing attention throughout various industrial sections. Thereby the discipline of LCA (Life Cycle Assessment) involving raw material preparation, production processes, transportation and installation has been established. There is a clear research gap between the need and the practice for Korean Case of renewable energy industry, particularly wind power. To bridge the gap, this study conducted LCA research on wind power generation in the Korean area of Yeongdeok, an example of a domestic onshor wind power complex using SimaPro, which is the most widely used LCA system. As a result of the study, the energy recovery period (EPT) of one wind turbine is about 10 months, and the GHG emitted to generate power of 1 kwh is 15 g CO2/kWh, which is competitive compared to other energy sources. In the environmental impact assessment by component, the results showed that the tower of wind turbines had the greatest impact on various environmental impact sectors. The experience gained in this study can be further used in strengthening the introduction of renewable energy and reducing the carbon emission in line with reducing climate change.

An Analysis of Velocity Patterns and Improvement Effect after Application of Domestic Roundabout Design Guidelines (Focusing on Busan Metropolitan City) (국내 회전교차로 설계지침 적용에 따른 속도패턴과 개선효과 분석 - 부산광역시를 중심으로 -)

  • Lim, Chang-Sik;Choi, Yang-Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.1
    • /
    • pp.305-316
    • /
    • 2013
  • To find out if modern roundabout is still effective under drivers behavior and driving conditions in Busan Metropolitan City, the effects before and after introduction of roundabout were analyzed. According to analysis on velocity profile at roundabout, velocity deviation decreased, and average vehicle speed was close to design speed. As a result, it has been confirmed that most roundabouts were properly built. In terms of traffic operation, average vehicle speed improved by 87.2% when a traffic intersection was replaced by a roundabout. therefore, it has been found out that the introduction of roundabout has a positive effect on increasing vehicle speed by reducing traffic congestion. In addition, annual benefits expected from the replacement from a traffic intersection to a roundabout were KRW 872 million as follows; KRW 410 million in traffic communication, KRW 39 million in transportation safety, KRW 255 million in energy saving, KRW 95 million in reduction of air pollution and KRW 73 million in reduction of traffic signal installation cost. In other words, if 10% (193 spots) of all traffic intersections (1,926 spots in total) in Busan City are replaced by roundabouts, the municipal authority would be able to save about KRW 168.3 billion. According to analysis on the benefits expected from the installation of roundabouts compared to the investment cost for traffic intersections, about KRW 679 million could be saved per roundabout. Considering 10% of all traffic intersections in the City of Busan, about KRW 131 billion could be saved annually. The traffic accidents in roundabout usually occur because drivers aren't aware of right-of-way rules. Once the right-of-way rules settle, the number of traffic accidents would significantly decrease. In addition, it is urgent to promote education and campaign for drivers, pedestrians and bikers on the roundabout.

A Study on Evaluation Method of the Urban Railway Station Sign Based on Applying the Positive Guidance Technique - Focusing on the Suseo Station Transfer Passageway - (Positive Guidance 기법을 적용한 도시철도역사 안내표지 평가방법 연구 - 수서역 환승동선을 중심으로 -)

  • Kim, Hwang Bae;Kim, Hyun Ju;Lee, Sang Hwa
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.3
    • /
    • pp.629-636
    • /
    • 2017
  • Urban railway are the most widely used means of transportation in the metropolitan area. It is difficult to draw out problems through the quantitative analysis technique because most of the research results show that most of the guide signs are installed with many or few guide signs. In this study, we propose a method to evaluate the information load and proper installation location at the main decision point in the transfer passageway for Suseo Station by applying Positive Guidance. As a result of analyzing the information load using this technique, it is suggested that the necessary information should be provided centered on the copper node because it provides confusion of the users by providing the same information in the transfer line. It is necessary to obtain guidance on how to remove the sign (advertising, high ceilings, etc). The study will be regarded as a key for the basis and placement of the guidelines for determining the appropriateness of the in the future urban railway station sign guide.