• Title/Summary/Keyword: Transformer failure

Search Result 116, Processing Time 0.032 seconds

An Efficiency Improvement of Secondary-Side Rectifier for Minimizing 2nd Coil-Making in Contact-less Power Supply (비접촉 전원공급 시 2차측 코일 제작을 줄이기 위한 2차측 정류부 효율 개선에 관한 연구)

  • Yu, Joo-Hee;Kim, Choon-Sam;Sung, Won-Ki
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.3
    • /
    • pp.1302-1307
    • /
    • 2011
  • The Spiral coil is made considering primary, secondary side coil inductance, turn number, size, thickness, and shielding area with the litz wire-type in case of manufacturing a coil, and at this time, the semi-automation winding machine is used. When deciding on primary and secondary side coil specification and manufacturing a coil, the spiral coil of a specification varied in the various litz wire of a specification is required, and at this time, a difficulty is generated by the manufacture cost, period which during, and failure the manufacture is generated in the coil sample making. A difficulty is in the desired coil quality control of a specification. Since improving the rectifier of the secondary side in order to improve this kind of problem, the range of the coil design and the during the manufacture, various coil manufacture specifications can be comprehensively made.

The development for flooding prevention apparatus of electrical equipment using air pressure (공기압을 이용한 전기설비 침수 방지 장치 개발에 관한 연구)

  • Kim, Gi-Hyun;Jean, Hyun-Jae;Lee, Sang-Ick;Bae, Suk-Myong;Lee, Jae-Yong
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.05a
    • /
    • pp.281-284
    • /
    • 2008
  • Inundation of substation and ground power equipment breaks out every summer season in low-lying downtown and low-lying shore by localized heavy rain, typhoon and tidal wave. In case inundation excluding the exchanging cost of equipment, it occurs a great economic and social loss owing to recovery time and events of electric shock occur by inundation electrical equipment(Pad-mounted Transformer and Switch). In case of installing the power equipment at flood danger territory, we are necessary to the product development, the product is that water does not come in the inside the power equipment. Product of pressure maintaining are established on the basic frame and sensor operates at the flooding occurrence and is maintained a shutting tightly structure and it is a method. The product which is produced the reliability of the product it confirmed a flooding yes or no from the condition which puts in the water tank and it verified. We estimate that loss cost which is caused by with flooding and the power failure will be diminished if it is addition to advances the reliability evaluation and a security of the flood protection product.

  • PDF

PTP Management Node-based Time Synchronization Error Detection and Recovery System (PTP Management Node 기반 시각동기 오류 검출 및 대응 시스템)

  • Kim, Yoon Hyun;Son, Kyou Jung;Seo, Young Duk;Chang, Tae Gyu
    • Journal of IKEEE
    • /
    • v.24 no.1
    • /
    • pp.248-253
    • /
    • 2020
  • This paper proposed PTP(Precision Time Protocol) management node-based time synchronization error detection and recovery system. The proposed system is to maintain the preciseness of time synchronization under time synchronization error situations on IEEE 1588-based network environment. To demonstrate the proposed time synchronization error detection and recovery system, PTP implemented EVM(Evaluation Module)-based experiments were performed. As a results of the experiments, it is shown that the proposed system effectively maintains the preciseness of time synchronization under time synchronization error situations.

Study on Analysis of Operating Characteristics of Motor Block While KTX is Moving at Neutral Section of Kyung-Bu High Speed Line (경부고속선 절연구간에서 KTX 운행중 모터블럭의 동작특성 분석)

  • Choi, Chang Hyun;Lho, Young Hwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.10
    • /
    • pp.1523-1527
    • /
    • 2015
  • Traction power is supplied by three-phase alternating current of 154 kV power grid and electric trains are operated on single phase feeding system. It becomes important to use all the three phases equally and convert them into two-phase electric power (90 degree phase rotation) for traction supply. This is achieved by special transformer from the adjacent traction substation which is separated by a neutral section. Neutral section locations are in front of the substation and between the two substations. The first stage of the Seoul-Busan high-speed railway, design curve radius is larger than 7,000 m and the greatest slope is 25‰. The railway track conditions are evaluated as good enough to install a neutral section at the first stage, but a few factors of coasting operation of the train should be considered at the second stage of Seoul-Busan high-speed railway. The neutral section was located at Kim-cheon substation, which made some neutral section problems produced by the operating train, and the neutral section was moved about 1.5 km to the south toward Dong Dae-gu station due to the track operation condition. Some of the trains which stopped at the existing Kim-cheon Gu-mi station produced another motor block failure after moving the neutral section. In this paper, power quality, system performance and track condition, etc. are suggested to solve the problems.

Identifying Process Capability Index for Electricity Distribution System through Thermal Image Analysis (열화상 이미지 분석을 통한 배전 설비 공정능력지수 감지 시스템 개발)

  • Lee, Hyung-Geun;Hong, Yong-Min;Kang, Sung-Woo
    • Journal of Korean Society for Quality Management
    • /
    • v.49 no.3
    • /
    • pp.327-340
    • /
    • 2021
  • Purpose: The purpose of this study is to propose a system predicting whether an electricity distribution system is abnormal by analyzing the temperature of the deteriorated system. Traditional electricity distribution system abnormality diagnosis was mainly limited to post-inspection. This research presents a remote monitoring system for detecting thermal images of the deteriorated electricity distribution system efficiently hereby providing safe and efficient abnormal diagnosis to electricians. Methods: In this study, an object detection algorithm (YOLOv5) is performed using 16,866 thermal images of electricity distribution systems provided by KEPCO(Korea Electric Power Corporation). Abnormality/Normality of the extracted system images from the algorithm are classified via the limit temperature. Each classification model, Random Forest, Support Vector Machine, XGBOOST is performed to explore 463,053 temperature datasets. The process capability index is employed to indicate the quality of the electricity distribution system. Results: This research performs case study with transformers representing the electricity distribution systems. The case study shows the following states: accuracy 100%, precision 100%, recall 100%, F1-score 100%. Also the case study shows the process capability index of the transformers with the following states: steady state 99.47%, caution state 0.16%, and risk state 0.37%. Conclusion: The sum of caution and risk state is 0.53%, which is higher than the actual failure rate. Also most transformer abnormalities can be detected through this monitoring system.

Evaluation Method for Protection Coordination of PV Systems Interconnected with Primary Feeders (태양광전원이 연계된 고압배전선로의 보호협조 평가 방안에 관한 연구)

  • Kim, Byungki;Kim, Sohee;Ryu, Kyungsang;Rho, Daeseok
    • Journal of the Korea Convergence Society
    • /
    • v.2 no.4
    • /
    • pp.29-37
    • /
    • 2011
  • Dispersed generation (DG) such as wind power (WP) and Photovoltaic systems (PV) that has been promoted at the national level recently is mainly being introduced into distribution systems adjacent to consumers because it is generation on a small scale when compared to current generation. Due to its characteristics, DG can be operated by interconnection with distribution systems to present security of more stable power and efficient use of power facilities and resources. Problems on protection coordination of distribution systems by reverse flow of DG can roughly be divided into three possibilities: excess in rated breaking capacity (12.5KA) of protective devices by a fault in DG current supply, failure to operate protective devices by an apparent effect that can occur by reduction in impedance parallel circuit fault current due to interconnection of DG, and malfunction of protective devices by interconnection transformer connection type. The purpose of this study is to analyze problems in protection coordination that can occur when DG is operated by interconnection with distribution systems by conducting modeling and simulations by using theoretical symmetrical components and MATLAB/SIMULINK to present methods to improve such problems.