• Title/Summary/Keyword: Train Operation plan

Search Result 98, Processing Time 0.026 seconds

Effective Connecting Methods Between Incheon International Airport Railroad and Existing Railroads (인천국제공항철도와 기존 철도의 효율적인 연계방안)

  • 한우진
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.253-258
    • /
    • 2002
  • The Incheon International Amort Railroad (IIAR) is the railroad that connects Incheon International Airport, Gimpo Airport and Seoul Station. IIAR is now under construction, and it will be finished to Gimpo Amort by 2006, to Seoul Station by 2008. But IIAR is not only so late to start but also has no discussion about effective connecting methods to existing railroads and fine operation plan. Therefore, after IIAR opens, it is possible for IIAR to lose to limousine bus using highway. So, this paper proposes 4 effective connecting methods for IIAR - (1) Shuttle transport, (2) Short-distance connecting transport (Inside IIAR, Seoul Subway Line 9, 'Han-River line') (3) Mid-distance connecting transport (Jung-ang, Tae-baek, Young-dong line) (4) Long-distance connecting transport (Korean Train express (korean high speed railroad)) These methods can increase the connectivity of IIAR with existing railroads and the competition power of IIAR against highway.

  • PDF

An Efficient Model and Algorithm to Allocate Rail Track Capacity Considering Line Plans (노선 계획을 고려한 철도 선로 용량 배분 최적화 모형 및 해법)

  • Park, Bum Hwan;Chung, Kwang Woo
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.6
    • /
    • pp.466-473
    • /
    • 2014
  • Recently, there is has been significant interest in the allocation systems of rail track capacities with considerations of the multiple train operating companies. The system indicates both a well-defined procedure and an algorithmic method to allocate the rail track capacities. Among them, this study considers the algorithmic method to derive the optimal timetable for the trains, which the companies propose together with their arrival and departure times at each station. However, most studies have focused on the adjustment of the departure and arrival times without conflicts, which could result in incompatible allocations with the line plan, which would result in an insufficient number of trains on each line to satisfy the demands. Our study presents a new optimization model and algorithm for the allocation problem in order to reflect the predetermined line plan. Furthermore, we provide the experimental results that were applied to the Korean high-speed railway network including the Suseo lines.

A Comparative Study on the Perception of the Job Seeking College Degree Candidates and the Librarians Concerning Library Specialized Services

  • Noh, Younghee
    • International Journal of Knowledge Content Development & Technology
    • /
    • v.9 no.1
    • /
    • pp.81-108
    • /
    • 2019
  • This research has investigated the perceptions of subject specialization services and the opinions of students majoring in library and information science preparing for librarianship, librarians operating in the field, and library directors on the status and ways of nurturing subject specialization for librarians, among others. To this end, based on the results of previous research and the survey questionnaire analysis, we have presented a policy to train subject librarians. First, we have proposed a plan for systematizing the current educational system within the department of library and information science. We have also suggested ways to secure subject expertise based on curriculum management, minor programs, multi-major programs, and interdisciplinary major programs based on the standard curriculum model. Second, we have presented a subject specialization educational system for field librarians, and further suggested details for the development of an educational program that can help build subject expertise and the operation of educational methods as well as the personnel in charge of implementing the educational programs. Third, we have proposed institutionalization of the qualifications of the subject librarian where the qualification requirements have been organized considering academic background, major program, library career, and career experience in the subject specialization service, further suggesting the implementation and maintenance of the system.

The Funding system for Shanghai Metro And The Practical Experiences of Utilizing Foreign Funds

  • Zhou Yao Dong
    • Proceedings of the KOR-KST Conference
    • /
    • 1998.09a
    • /
    • pp.185-191
    • /
    • 1998
  • Metro, as a kind of city rail transit, is a modem city passenger transit system with mass transportation and independent special rails. It has become a backbone of the traffic in the metropolis and an important modern symbol of a city. A modem traffic system is indispensable for Shanghai to be an international metropolis of finance, trade and economy. At present, Shanghai metro line No. 1 and its extension have been put into operation, metro line NO. 2 will be put into trial operation by the end of 1999, the Pearl Line, an elevated rail transit system is under construction and other lines will be constructed later according to the plan. But the funding of the city rail transit construction (both metro and light rail) is a big difficult problem to the infrastructure construction of the metropolises either at home or abroad, which is also a problem to restrict the development of the city rail transit of Shanghai. We have learned from the internal and external experiences of the rail transit construction that it is an important means to deal with the funds of the city rail transit construction to actively utilize foreign funds. It makes up the shortage of the internal funds on the one hand, the external advanced science and technology and the management experiences can be introduced on the other hand. In order to discuss and study conveniently with you together the new problems appearing in the metro construction and to open up a new train of thought, this article will give out a certain analysis and description to the funding method in the metro construction of Shanghai and the characteristics of utilizing foreign funds in the rail transit construction as well as the problems which we are faced with.

  • PDF

A Study of the Effect of the KTX Mulgeum Station Stop on Railroad Users in Yangsan City (KTX 물금역 정차 확정이 양산시 철도 이용자에게 미치는 영향에 관한 연구)

  • Choi, Yang-Won;Jang, Jae-Suck;Suh, Jeong-Yeal
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.4
    • /
    • pp.527-536
    • /
    • 2022
  • The purpose of this study is to predict changing traffic environments and related economic effects by reflecting the changed KTDB and socio-economic indicators pertaining to Mulgeum station, a general railway stop, when it is confirmed as a KTX stop. To analyze the data of this study, socioeconomic indicators and the general status of transportation facility operations were investigated with reference to related statistical data, centered on the country overall and on Yangsan city in particular. In addition, we investigated and referenced the railroad facility construction plan and train operation plan, which are national high-level plans related to land development and transportation network construction. Currently, there are only ITX trains (4 times/day) and Mugunghwa trains (29 times/day) that stop at Mulgeum station in Yangsan, meaning that passengers cannot use KTX trains in the Yangsan area. In particular, the need for a KTX stop at Mulgeum station has been continuously raised because train users in the Yangsan area have inconvenient transportation in that they must travel 40 minutes to Ulsan station or 30 minutes to Gupo station to use the KTX. As a result of analyzing railroad transportation demand that will change in the future as the KTX stop at Mulgeum station is confirmed, the number of passengers boarding and arriving at Mulgeum station is predicted to be 1,674 passengers/day by 2025. In addition, the numbers of train passengers that are converted from Ulsan and Gupo stations due to the stop at Mulgeum station are predicted to be 594 passengers/day boarding and 562 passengers/day arriving by 2025. In the future, if Yangsan citizens use the KTX Mulgeum station, the access time to Mulgeum station can be shortened to 22 minutes from 65 minutes, and it is predicted that the inconvenience of transferring between railroads will be resolved, with the waiting time for transfers reduced by up to a maximum of 40 minutes. Therefore, the economic effect of creating a KTX stop at Mulgeum station was analyzed to be B/C=1.823 when general railroad operating costs are not taken into account and B/C=2.127 when general railroad operating costs are considered. In conclusion, when using KTX trains to visit the Seoul Metropolitan Area, it takes 2 hours and 43 minutes to use Mulgeum station without using Ulsan station or Gupo station, which is considered to be very effective for reducing travel times and improving the economic feasibility of this development; it is also expected that Yangsan city will be able to improve accessibility and mobility to the Seoul Metropolitan Area by breaking free from the disgrace of being a remote location given its link to KTX in the future.

A Study on SCOTT Transformer Protection Relay Malfunction Case and Improvement Methodology (스코트 변압기 보호계전기 오동작 사례분석 및 개선방안 고찰)

  • Lee, Jong-Hwa;Lho, Young-Hwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.7
    • /
    • pp.394-399
    • /
    • 2017
  • In Korean AC power railway substations, SCOTT winding transformers are under operation to have a single phase power supply together with a phase angle of $90^{\circ}$ on the secondary side of the main transformer. In the case of an internal fault of the transformer, the transformer protection relay should be cut off on the primary side, the transformer should be inoperative to the external fault of the transformer or to the normal train operation. Reducing the malfunction of the relay through an exact fault determination is very important for securing a stable power system and improving its reliability. The main transformers are protected using Buchholtz's relay and a differential relay as the internal fault detection devices, but there are some cases of the main transformer operation under the deactivation of this protection function due to a malfunction of the differential relay. In this paper, the characteristics of the SCOTT transformer and differential relay as well as the malfunctioning of the protection relays are presented. The modeling of the SCOTT transformer protection relay was accomplished by the power system analysis program and the Comtrade file from 'A substation', which was used as the input data for the fault wave, and the harmonics were analyzed to determine if the relay operates or not. In addition, an improvement plan for malfunctioning cases through wave form analysis is suggested.

A Redesign of the Military Education Structure of General Universities based on Defense Innovation 4.0 -Focused on Capabilities of Tech-Intensive Junior Officers based on Advanced S&T- (국방혁신4.0 기반의 일반대학의 군사학 교육체계 재설계 방안 -첨단과학기술 기반의 기술집약형 초급 간부 역량 중심으로-)

  • Jung-Ho Eom;Keun-Seog Park;Sang-Pil Chun
    • Convergence Security Journal
    • /
    • v.22 no.4
    • /
    • pp.35-44
    • /
    • 2022
  • Among the five promotion strategies of Defense Innovation 4.0(DI 4.0), the military structure/operation optimization strategy aims to innovate the military structure based on advanced science&technology(S&T), and to integrate advanced S&T in the field of defense operation such as education&training and human resource development. As the future battlefield expands to AI-based unmanned/robot combat systems, space, cyberspace, and electromagnetic fields, it is necessary to train officers with the capabilities required in these battlefields. It is necessary to develop capabilities from junior officers who will lead the future battlefield to operating core advanced power based on the 4th industrial revolution S&T. We review the education system of the military in universities and propose a method of redesigning the education system that is compatible with DI 4.0 and can develop technology-intensive capabilities based on advanced S&T. We propose a operation plan of major and extra-programs that can develop the capabilities of junior officers required for the future battlefield, and also suggest ways to support the army's practical training.

Study on the Category of Safety Models for the Urban Railway (도시철도 안전성 모델의 유형 분석)

  • Seo, Yong-Jun;Kook, Kwang-Ho;Lee, Jeong-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.4
    • /
    • pp.402-407
    • /
    • 2012
  • Since reports on trip delays or incidents often appear as accident articles on the press, the social criticisms and concerns on the safety of the urban railway are increasing. Therefore, a railway authority sometimes adopts an abstract safety goal like "let's build the urban railway to a masterpiece level" or "let's obtain an aeronautic safety level" to make citizens relieved and to alert involved persons. However with a vague goal, it is almost impossible to make an implementation plan systematic which helps the authority academically verify and validate if the goal is achieved or not. In this paper, the features of the railway safety are described and the safety models for securing the safety of the urban railway are surveyed and categorized. Based on the comparisons among the features and limitations of the models, we identify a more practical model which can be applied to the urban railway more effectively.

Risk identification, assessment and monitoring design of high cutting loess slope in heavy haul railway

  • Zhang, Qian;Gao, Yang;Zhang, Hai-xia;Xu, Fei;Li, Feng
    • Structural Monitoring and Maintenance
    • /
    • v.5 no.1
    • /
    • pp.67-78
    • /
    • 2018
  • The stability of cutting slope influences the safety of railway operation, and how to identify the stability of the slope quickly and determine the rational monitoring plan is a pressing problem at present. In this study, the attribute recognition model of risk assessment for high cutting slope stability in the heavy haul railway is established based on attribute mathematics theory, followed by the consequent monitoring scheme design. Firstly, based on comprehensive analysis on the risk factors of heavy haul railway loess slope, collapsibility, tectonic feature, slope shape, rainfall, vegetation conditions, train speed are selected as the indexes of the risk assessment, and the grading criteria of each index is established. Meanwhile, the weights of the assessment indexes are determined by AHP judgment matrix. Secondly, The attribute measurement functions are given to compute attribute measurement of single index and synthetic attribute, and the attribute recognition model was used to assess the risk of a typical heavy haul railway loess slope, Finally, according to the risk assessment results, the monitoring content and method of this loess slope were determined to avoid geological disasters and ensure the security of the railway infrastructure. This attribute identification- risk assessment- monitoring design mode could provide an effective way for the risk assessment and control of heavy haul railway in the loess plateau.

Short-term Railway Passenger Demand Forecasting by SARIMA Model (SARIMA모형을 이용한 철도여객 단기수송수요 예측)

  • Noh, Yunseung;Do, Myungsik
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.14 no.4
    • /
    • pp.18-26
    • /
    • 2015
  • This study is a fundamental research to suggest a forecasting model for short-term railway passenger demand focusing on major lines (Gyeungbu, Honam, Jeonla, Janghang, Jungang) of Saemaeul rail and Mugunghwa rail. Also the author tried to verify the potential application of the proposed models. For this study, SARIMA model considering characteristics of seasonal trip is basically used, and daily mean forecasting models are independently constructed depending on weekday/weekend in order to consider characteristics of weekday/weekend trip and a legal holiday trip. Furthermore, intervention events having an impact on using the train such as introduction of new lines or EXPO are reflected in the model to increase reliability of the model. Finally, proposed models are confirmed to have high accuracy and reliability by verifying predictability of models. The proposed models of this research will be expected to utilize for establishing a plan for short-term operation of lines.