• Title/Summary/Keyword: Track alignment

Search Result 52, Processing Time 0.023 seconds

Sensitivity of the ballast resistance and track irregularity on the track stability (궤도 안정성에 대한 도상저항력과 궤도틀림의 민감도)

  • Lim, Nam Hyoung;Choi, Sang Hyun;Lee, Chin Ok;Sung, Ik Hyun
    • Journal of Korean Society of Steel Construction
    • /
    • v.17 no.5 s.78
    • /
    • pp.519-526
    • /
    • 2005
  • During summer, very high compressive force occurs on the continuous welded rail (CWR) track because of the increase of rail temperature (max. $60^{\circ}C$). This extreme temperature stress can cause the CWR track to buckle. Among many CWR parameters affecting the track buckling, the influence of the lateral and longitudinal ballast resistance was investigated on the stability of the CWR track in this study. Also, the sensitivity of the track irregularity such as the alignment defect and the gauge irregularity was investigated.

Technical Review for Speed-Up of Existing Railway Line (기존선 속도향상을 위한 기술적 검토)

  • 양신추;신정렬;정우진
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.423-430
    • /
    • 2000
  • With speed-up of existing railway, a greater attention is paid to the riding safety and the comfort of the passengers. They are combined to some technical factors related to track such as alignment, derailment coefficient, and track bearing capacity, A quantitative analysis method for those technical factors is presented in this study. Calculating the allowable transit speed, the technical reviews of speed-up of Janghang-Line(Chunan∼Janghang) are conducted. And the alternatives for improving train speed in existing railway are proposed.

  • PDF

Analysis method for the Measured Track Geometry Data using Wavelet Transform (웨이브렛 변환을 이용한 궤도틀림 분석)

  • Lee, In-Kyu;Kim, Sung-Il;Yeo, In-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.187-192
    • /
    • 2006
  • The regularity of railway track alignment is a crucial component fur maintaining travel safety and the smoothness of passenger ride. The conventional spectral analysis has been considered to estimate the severity of the track irregularity from measured data. The time domain data used to be changed into the frequency domain by Fourier transform. Because the measuring points can be regarded as the time points, the spatial-frequency can be introduced instead of the time-frequency. Although FFT(Fast Fourier Transform) and/or PSD(Power Spectral Density) function could provide fairly localized information within frequency domain, but chronical configurations of data could be missed. In this study, we attempt to apply the Morlet wavelet transform for the purpose of a frequency-time-domain analysis rather than a frequency-domain analysis. The applicability of wavelet transform is examined for the estimation of the track irregularity with real measured track data on the section of Kyoung-bu line by EM-120 measuring vehicle. It is shown that the wavelet transform can be an effective tool to manage the track irregularity.

Measurement of Track geometry with HSR350X (한국형고속열차를 이용한 궤도 틀림 측정결과 비교분석)

  • Im, Yong-Chan;Kim, Sang-Soo;Park, Choon-Soo;Kim, Ki-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.278-282
    • /
    • 2007
  • The riding comfort and the durability of train are effected by the rail irregularities such as track gauge, superelevation, alignment, longitudinal level, twist, cant and cross level. Inspection and estimation of irregularities are very important to maintain the rail condition. Generally, the EM120 has been utilized to measure the rail irregularities once a month in Korea. However, the EM120 can be operated at night time only, because the inspection speed of EM120 is much slower than the speed of high-speed trains. Also, the EM120 is too slow to inspect effectively for the whole commercial line. Therefore, we have mounted the track inspection system on the High-Speed Rolling Stock 350 eXperimental (HSR350X) and measured the rail irregularities to confirm the condition of a rail while running 300km/h. In this paper, the track inspection system mounted on HSR350X is mainly considered, and the measured results through test run are introduced.

  • PDF

A Study on the Parameters Effecting on the Derailment Factor of Running Train on the Curved Track (곡선부에서 탈선계수에 영향을 미치는 매개변수들에 대한 연구)

  • Song, Bong-Hwan;Yang, Shin-Chu;Kang, Yun-Suk
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.348-356
    • /
    • 2004
  • In this paper, Analysis of parameters effecting on the derailment factor was conducted in oder to deduce technical requisites have to be reflected in design of Track and rolling-stocks because it is important to grasp the risk of derailment quantitatively. And then go far toward becoming practical study with that select two section of sharp curved track of actual train in service, incheon Metro Line 1 and make field research in condition of vehicles and track and analysis As a result of parameter study, the following conclusions were obtained. The radius of curve and Cant is in inverse proportion to the derailment factor, but as train operation velocity, standard deviation of alignment irregularity and the ratio lateral force : wheel load of the inside track increase, the derailment factor rise. In the investigation for the derailment safety of incheon Metro Line 1, the derailment factor was below 0.43 in both section R=200 and R=300, so that it proved safe compare with allowance limits 0.8, but it appeared that risk of the derailment in second transition curve is the highest among the entire curve.

  • PDF

Evaluating New Track Construction Costs of Two Different Options: Conventional Trains vs. Tilting Trains

  • Rho, Hag Lae;Han, Seong Ho;Kim, Gang Seog
    • International Journal of Railway
    • /
    • v.5 no.3
    • /
    • pp.103-113
    • /
    • 2012
  • Infrastructure costs could be greatly reduced if the need for bridges and tunnels was reduced, or if the line could be shortened. Tilting trains might be a less costly alternative to building new tracks with large curve radii, because tilting trains can negotiate tighter curves without having to decrease their speeds. Tracks built for tilting trains would be cheaper, as they require fewer bridges and tunnels. This paper compares the construction costs of two different options for the new Dodam-Yeoncheong section on the Central line, which includes 148.65 km of new electrified double-track with a design speed of 250 km/h. The first option is to straighten the high-speed line. The second option is to build a line with small radii curves and run tilting trains on the line. In the first option, tunnels would account for about 51% of the new section. In comparison, the second option would have shorter curves and fewer tunnels and bridges which would reduce construction costs. Furthermore, alignment modifications could be made to several segments on the straight line, making the most of the existing roadbed. The analysis concluded that the line suited to tilting trains would be 95.7 million USD cheaper to build the straight route. That is a savings of 2.8% of the total project cost. However, this option would increase the total travel time of the route by 1.2 minutes, which means it is not necessarily the best choice.

Evaluation of Track irregularity due to Adjacent Excavation Work on Serviced Urban Transit (도시철도 인접굴착공사에 따른 운행선 궤도의 궤도틀림 분석)

  • Choi, Jung-Youl;Lee, Ho-hyun;Kang, You-Song;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.2
    • /
    • pp.481-487
    • /
    • 2020
  • In this study, finite element analysis was performed to evaluate the track irregularity of the existing track system on urban transit according to the large-scale excavation work that is constructed adjacent to the serviced line. Based on the numerical analysis, the effect of track irregularity generated during the step-by-step construction process was analytically derived, and the stability in terms of track deformation was evaluated through comparison with related standards. As the results, in the case of track irregularity items evaluated based on the relative displacement difference at a certain distance, such as alignment and vertical irregularity, it occurred most clearly at the location where deformation of the existing structure begins, such as the end point of adjacent excavation work. On the other hand, the overall vertical and horizontal displacement of the track was the largest deformation at the center of the construction section. The vulnerable position of the deformed side of the existing structure due to adjacent excavation is analytically proven that the both of the end point section and the center of the construction can be a vulnerable position in terms of track irregularity.

Application of the GPS Data Simplification Methods for Railway Alignments Reconstruction (철도 선형 복원을 위한 GPS 데이터 단순화 방법의 적용)

  • 정의환
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.22 no.1
    • /
    • pp.63-71
    • /
    • 2004
  • This research is to reconstruction of railway alignment using GPS data, an investigation is made on the method of optimum simplification for reduction of unnecessary linear data, improve the accuracy by using four simplification algorithms among the methods. By applying two measured of displacement between observed data and it's simplification methods have been evaluated. The results showed that the complexities of lines is not practical to investigate simplification algorithms, the Douglas-Peucker method produced a little displacement between observed data and it's simplification. Its by using the Douglas-Peucker method to observed linear GPS data in railway track, design elements of horizontal alignment have been calculated. Then we could know that obtain the good results fur reconstruction of alignment elements through the methods and algorithns of this study.

Evaluation of Optimal Horizontal Alignment Considering Ride Comfort in Renewal of Curved Tracks (곡선부 선형개량 시 승차감을 고려한 최적평면선형 평가)

  • Um, Ju-Hwan;Choi, Il-Yoon;Lee, Jun S.
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.5
    • /
    • pp.457-465
    • /
    • 2015
  • A method of evaluating the optimal alignment range while considering ride comfort when performing line renewal of curved tracks for speed-up is proposed in this study. The proposed method was applied to analyze the optimal renewal range for horizontal alignments with the smallest curve radii in the Kyung-Bu high-speed line; a parametric study on the effects of various initial design conditions on the permissible renewal range and optimal alignment range was also performed. From the analysis results, it was found that the permissible range is enhanced in proportion to the increase in the curve radius and the cant. It was also verified that a slight adjustment of the horizontal alignment enables speed-up even in the case of R7000/R8000, placed in the ballasted track section of the Kyung-Bu high-speed line.

A Study on the Optimization of the Alignment Considering the Ride Comfort in the Case of the Superimposition of Vertical and Horizontal Curves (종곡선/평면곡선 경합 시 승차감을 고려한 선형최적화에 관한 연구)

  • Um, Ju-Hwan;Yang, Sin-Chu;Choi, Il-Yoon
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1943-1950
    • /
    • 2010
  • Superimposition of horizontal and vertical curves may hamper the ride comfort and the running stability of train and largely affect the maintenance cost. However, in many cases, it's not easy to make a track plan because of the fixed points (bridge, tunnel, turnout, catenary system, etc.) to be avoided due to the geographic conditions or to be passed for utilization of existing structures. In this study, when the horizontal and vertical curves are superimposed, in order to optimize the horizontal curve in aspect of the ride comfort, the object function $P_{CT}$ was developed and verified by vehicle dynamic analysis. Also, the solution algorithm for simplified evaluation method was presented.

  • PDF