A Study on the tension of Geogid on Pile-supported Construction Method (성토지지말뚝공법 중 섬유보강재의 인장력 검토에 관한 연구)

  • Moon, In-Ho;Park, Jong-Gwan;Lee, Il-Wha
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.905-917
    • /
    • 2008
  • Road or Railway construction over soft ground is needed to be considered on secondary consolidation which will be caused differential settlement, lack of transport serviceability, higher maintenance cost. Especially for the railway construction in the second phase of Gyung-Bu or Ho-Nam high speed railway, concrete slab track has been adapted as a safe and cost effective geotechnical solution. In this case controlling the total settlement under the tolerance is essential. And pile supported geogrid reinforced construction method is suggested as a solution for the problem of the traditional method on soft soil treatments. Pile supported geogrid reinforced construction method consists of piles that are designed to transfer the load of the embankment through the compressible soil layer to a firm foundation. The load from the embankment must be effectively transferred to the piles to prevent punching of the piles through the embankment fill creating differential settlement at the surface of the embankment. The arrangement of the piles can create soil arching to carry the load of embankment to the piles. In order to minimize the number of piles geogrid reinforced pile supported construction method is being used on a regular basis. This method consists of one or more layers of geogrid reinforcement placed between the top of the piles and the bottom of the embankment. This paper presents several methods of pile supported geogrid reinforced construction and calculation results from the several methods and comparison of them.

  • PDF

Stress waves transmission from railway track over geogrid reinforced ballast underlain by clay

  • Fattah, Mohammed Y.;Mahmood, Mahmood R.;Aswad, Mohammed F.
    • Structural Monitoring and Maintenance
    • /
    • v.9 no.1
    • /
    • pp.1-27
    • /
    • 2022
  • Extensive laboratory tests were conducted to investigate the effect of load amplitude, geogrid position, and number of geogrid layers, thickness of ballast layer and clay stiffness on behavior of reinforced ballast layer and induced strains in geogrid. A half full-scale railway was constructed for carrying out the tests, the model consists of two rails 800 mm in length with three wooden sleepers (900 mm × 10 mm × 10 mm). The ballast was overlying 500 mm thickness clay in two states, soft and stiff state. Laboratory tests were conducted to investigate the response of the ballast and the clay layers where the ballast was reinforced by a geogrid. Settlement in ballast and clay, soil pressure and pore water pressure induced in the clay were measured in reinforced and unreinforced ballast cases. It was concluded that the effect of frequency on the settlement ratio is almost constant after 500 cycles. This is due to that the total settlement after 500 cycles, almost reached its peak value, which means that the ballast particles become very close to each other, so the frequency is less effective for high contact particles forces. The average maximum vertical stress and pore water pressure increased with frequency.

Numerical Evaluation of Settlement Reducing Effect by Partial Reinforcement of Rock Fill (수치해석을 통한 암성토 부분보강의 침하억제 효과 평가)

  • Lee, Su-Hyung;Choi, Yeong-Tae;Han, Jin-Gyu ;Gu, Kyo-Young
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.11
    • /
    • pp.23-31
    • /
    • 2023
  • The escalating settlements observed in concrete slab tracks pose a significant challenge in Korea, raising concerns about their adverse impact on the safe operation of high-speed railways and the substantial costs involved in restoration. A primary contributor to these settlements is identified as the utilization of rock materials sourced from tunnel construction, incorporated into the lower subgrade without the requisite soil mixing to achieve an appropriate particle size distribution. This study employs numerical analysis to evaluate the efficacy of partial reinforcement in reducing settlements in rock-filled lower subgrades. Column-shaped reinforcement areas strategically positioned at regular intervals in the lower subgrade induce soil arching in the upper subgrade, leading to a concentration of soil loads on the reinforced areas and consequent settlement reduction. The analysis employs finite element methods to investigate the influence of the size, stiffness, and spacing of the reinforced areas on settlement reduction in the lower subgrade. The numerical results guide the formulation of an optimal design approach, proposing a method to determine the minimum spacing required for reinforcements to effectively limit settlements within acceptable bounds. This research contributes valuable insights into addressing the challenges associated with settlement in concrete slab tracks, offering a basis for informed decision-making in railway infrastructure management.

Wetting-Induced Collapse in Fill Materials for Concrete Slab Track of High Speed Railway (고속철도 콘크리트궤도 흙쌓기재료의 Wetting Collapse에 관한 연구)

  • Lee, Sung-Jin;Lee, Il-Wha;Im, Eun-Sang;Shin, Dong-Hoon;Cho, Sung-Eun
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.4
    • /
    • pp.79-88
    • /
    • 2008
  • Recently, the high speed railway comes into the spotlight as the important and convenient traffic infrastructure. In Korea, Kyung-Bu high speed train service began in bout 400 km section in 2004, and the Ho-Nam high speed railway will be constructed by 2017. The high speed train will run with a design maximum speed of 300-350 km/hr. Since the trains are operated at high speed, the differential settlement of subgrade under the rail is able to cause a fatal disaster. Therefore, the differential settlement of the embankment must be controlled with the greatest care. Furthermore, the characteristics and causes of settlements which occurred under construction and post-construction should be investigated. A considerable number of studies have been conducted on the settlement of the natural ground over the past several decades. But little attention has been given to the compression settlement of the embankment. The long-term settlement of compacted fills embankments is greatly influenced by the post-construction wetting. This is called 'hydro collapse' or 'wetting collapse'. In spite of little study for this wetting collapse problem, it has been recognized that the compressibility of compacted sands, gravels and rockfills exhibit low compressibility at low pressures, but there can be significant compression at high pressures due to grain crushing (Marachi et al. 1969, Nobari and Duncan 1972, Noorany et al. 1994, Houston et al. 1993, Wu 2004). The characteristics of compression of fill materials depend on a number of factors such as soil/rock type, as-compacted moisture, density, stress level and wetting condition. Because of the complexity of these factors, it is not easy to predict quantitatively the amount of compression without extensive tests. Therefore, in this research I carried out the wetting collapse tests, focusing on various soil/rock type, stress levels, wetting condition more closely.

Performance of Railway Roadbed Reinforced by Acrylate in Laboratory Experiment (실내실험을 통한 아크릴레이트의 철도노반 보강 성능)

  • Yoon, Hwan-Hee;Son, Min;Kim, Jin-Hwan;Kim, Dong-Hyun;Kim, Byung-Hyun;Jung, Hyuk-Sang
    • Journal of the Korean Geosynthetics Society
    • /
    • v.20 no.1
    • /
    • pp.9-19
    • /
    • 2021
  • This paper deals with the reinforcement performance of acrylate for reinforcing the settled railway roadbed. Concrete tracks have the advantage of reducing track maintenance costs and high resistance to track destruction. However, roadbed settlement is occurring in some construction sections, and the safety of railways is a serious concern because of difficulties in maintenance. Currently, maintenance through the track restoration method is being carried out in Korea as a way of roadbed settlement in concrete tracks, but continuous re-settlement can occur because the roadbed itself cannot be reinforced, and there are very few cases of reinforcement of railway roadbeds and field application. So the development of reinforcement materials and construction methods to reinforce railway roadbeds is required. Therefore, in this paper, acrylate was selected as reinforcement material for railway roadbed, and the reinforcement performance of acrylate was analyzed through experiment. As a result, it was analyzed that the acrylate can penetrate into a permeability coefficient of 1×10-4 cm/sec, and secure uniaxial compression strength of 0.5 MPa/30min or more and stiffness of 80 MPa or more.

Track Stability in Accordance with the Depth of Soil above Box Structures Constructed by Non-excavation Method on Railway Embankment (철도하부 비개착공법을 이용한 BOX구조물 설치시 토피고에 따른 궤도구조 안전성에 관한 연구)

  • Jeon, Byeon-Muk;Eum, Ki-Young;Cho, Kook-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.412-419
    • /
    • 2011
  • With an increase in rail traffic, developing activities around structures of railway have been expanded. Inevitably, the changes to cross though sub-structures of railway have been getting increased. However, this situation affects on the safe operation of trains. Generated wheel load makes on the result in settlement on roadbed and damages on track materials. Therefore, via the numerical analysis were carried out for the box structure and subground using FEM analysis program called. Visual FEA/Geo 4.19. Parametric studies were performed by changing soil depth above box structure constructed in railway embankment. A standard live load was applied to simulate loads from train. Through this study, a minimum required soil depth above subground box structure was recommended based on deformation and stresses in concrete railway system.

  • PDF

Development of a Nondestructive Seismic Technique for Flexural Rigidity of Concrete Track as Slab Displacement Index (콘크리트 슬래브궤도의 휨강성 평가를 위한 비파괴 탄성파 기법의 개발)

  • Cho, Mi-Ra;Joh, Sung-Ho;Lee, Il-Wha
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6D
    • /
    • pp.905-913
    • /
    • 2008
  • Recently, concrete tracks are introduced into high-speed railroads as an alternative to ballast tracks. Concrete tracks are superior to ballast tracks in the aspect of durability, maintenance and safety. However, deteriorated stiffness of railroad bed and settlement of soft ground induced by trapped or seepage water lead to problems in safety of train operation. In this research, flexural rigidity of concrete tracks was employed as an index of track displacement and a new seismic technique called FRACTAL (Flexural-Rigidity Assessment of Concrete Tracks by Antisymmetric Lamb Waves) method was proposed to delineate flexural rigidity of concrete tracks in a 2-D image. In this paper, to establish theoretical background, parametric research was performed using numerical simulations of stress-wave tests at concrete tracks. Feasibility of the FRACTAL technique was proved at a real concrete track for Korean high-speed trains. Validity of the FRACTAL technique was also verified by comparing the results of impulse-response tests performed at the same measurement array and the results of DC resistivity survey performed at a shoulder nearby the track.

Characteristics of Settlement for Non-woven Geotextile through Cyclic Loading Model Test (원형토조 시험을 통한 반복하중에 따른 부직포의 침하특성)

  • Choi, Chan-Yong;Lee, Jin-Wook;Kim, Hyun-Ki
    • Journal of the Korean Geosynthetics Society
    • /
    • v.8 no.2
    • /
    • pp.47-54
    • /
    • 2009
  • The ballast track, the most common type of conventional railroad track in Korea, is deteriorated by abrasion of ballast, it's penetration into roadbed, and rugged surface of roadbed caused by cyclic loading of train. Persistent occurrence of those phenomena lead to insufficient drain capacity, one of major factors in track design, and it increases pore water pressure and decreases of shear strength under rainfall condition leading to unstable roadbed. In this study, cylindrical model tests are executed for 3 types of geotextile applying cyclic loading in order to observe the characteristics of displacement and bearing capacity of geotextile, and undrained condition has been applied for 0 day, 3 days and 7 days to each geotextiles. The results showed that there was about 1% difference at the final displacement rates between reinforced soils and nature soils and the displacement of the ground surface increases along with the degrees of the saturation. And in case that water contents exceeds the threshold, it is also apparent that weight and tensile strength of geotextile influences displacement of the ground surface. And the larger weight of geotextile is, the smaller plastic displacement. It is evaluated that non-woven fabric comes into effect on reducing the bearing capacity but, the weight of geotextile has little influence on it.

  • PDF

A Case Study on the Cause and Reinforcement of Railroad Facilities Settlement According to the Ground Excavation (지반굴착에 따른 철도시설물의 침하 원인 및 보강 사례연구)

  • Oh, Beyung-Sam
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.10
    • /
    • pp.85-94
    • /
    • 2012
  • Recent development trend of construction projects in the urban area is the efficient use of insufficient land, however caused to difficult construction conditions because of many adjacent structures. This paper presents the case study that analyzed the ground settlement of railroad structure for the double track railway project of Gyeongui line, adjacent to the high rise building under ground excavating for substructure work, considering interaction of soft ground characteristics. Field survey and measurement works were carried out during construction of station and excavation of high rise building, and field data were analyzed to find the source of settlement of platform and railway. In addition, the soil reinforcement and foundation restoration were performed using in-situ injection method, i.e., D-ROG(Digitalized Restoring On Grout) method which filled the pore of bottom and around of foundation with micro-cement.

Settlement Characteristics of the Reinforced Railroad Roadbed with Crushed Stones Under a Simulated Train Loading (모사 열차하중 재하에 따른 쇄석강화노반의 침하특성)

  • Hwang, Seon-Keun
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.2
    • /
    • pp.5-13
    • /
    • 2004
  • Conventional railroad roadbeds constructed with soils can easily deteriorate with time due to the increase of repeated traffic loading, increase of train speed, built-up of ground water on the roadbed and decrease of permeability in the roadbed layer, etc. In this study, performance of reinforced railroad roadbeds with the crushed stones was investigated through the real scale roadbed tests and numerical analysis. It was found that the reinforced roadbed with crushed stone had less elastic and plastic vertical displacement(settlement) than general soil roadbed regardless of the number of loading cycles. It was also found through the actual testing that for the roadbed with the same thickness, the displacement of reinforced roadbed decreases with the increase of subgrade reaction modulus. The settlement of reinforced roadbed with the same subgrade reaction modulus also decreases with the increase of thickness of the reinforced roadbed. However, the subgrade reaction modulus is a more important factor to the total plastic displacement of the track than the thickness of the crushed stone roadbed.