Measuring the Impact of Change Orders on Project Performances by Building Type

  • Juarez, Marcus;Kim, Joseph J.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.179-187
    • /
    • 2022
  • The project performances can be measured in terms of meeting the project schedule, budget, and conformance to functional and technical specifications. Numerous studies have been conducted to examine the causes and effects of change orders for both vertical and horizontal construction, respectively. However, these studies mainly focus on a single project type, so this paper examines the impact of change order for cost growth and schedule overruns using four different building types to close the gap in the change order research area. A total of 211 building projects are collected from four building types: healthcare, residential, office, and education. Statistical analyses using ANOVA tests and linear regression models are used to examine the created metric $CO/day on the cost and schedule impacts. The results found that mean $CO/day values were not statistically different among building types, and that the sum of change orders is a statistically significant predictor of $CO/day. The results will help project stakeholders mitigate the negative change orders effects can be a challenge for project managers and researchers alike.

  • PDF

A Simple Interactive 3D Interior Design Application for Living Room - Cost Management

  • Winnie, Chin;Hui, Saw Seow;Gee, Yap Seok
    • Journal of Multimedia Information System
    • /
    • v.4 no.3
    • /
    • pp.157-162
    • /
    • 2017
  • The title of this project is "A Simple Interactive 3D Interior Design Application for Living Room - Cost Management", focusing on developing an application that enables costing and designing to be executed concurrently in interior design phases. This is because any changes made at costing phase after design phase is completed, it will potentially lead to unnecessary increase in cost and time. Therefore, the objective of this project is aimed to devise a cost management module to be included in the proposed application, allowing interior designer to make cost-based decision at the designing phase itself. This can be achieved through its proposed functions which include total cost update, budget management, cost estimator calculator and material list generation. The methodology being proposed in this project is Prototyping Development, categorized under Rapid Application Development (RAD), by starting off with planning, analysis, design and implementation phases are performed concurrently and repeatedly in a cycle to produce a prototype until the application is completed. In the end of this project, the developed prototype is expected to contribute a better solution towards cost management in interior design.

Tabu search-based multi-objective optimization of work package schemes to minimize project costs and carbon emissions

  • Yaning ZHANG;Yue TENG;Xiao LI
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.823-830
    • /
    • 2024
  • Effective project planning is essential in construction project management for timely delivery and economic benefit realization. Work packages are pivotal in this planning, providing clear organization and progress tracking. However, existing methods for creating work package schemes often overlook environmental sustainability, specifically carbon emissions-a growing concern in construction. This study introduces a tabu search-based optimization method for work package schemes, aiming to reduce both project costs and carbon emissions. A cost-carbon model is devised, and a tabu search algorithm is developed to identify the Pareto frontier for total project cost and carbon emissions. A case study shows the tabu search outperforms existing heuristics, reducing carbon emissions by 6.19% with a marginal cost increase of 0.9%. The algorithm's adaptability and generalizability suggest it could significantly enhance economic and sustainable outcomes in construction project planning.

A Evaluation System Integrating Cost-Cross Effects of Big Scale R&D Projects (R&D프로젝트군의 우선순위 결정을 위한 비용 - 상호효과 통합평가시스템)

  • Kwon, Cheol-Shin;Lee, Soon-Cheon;Park, Jooh-Ho
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.32 no.2
    • /
    • pp.163-175
    • /
    • 2007
  • [ $ulcorner$ ]Cost-Effectiveness Analysis$\lrcorner$ has been wifely used to evaluate economic efficiency of R&D projects, but most of cost-effectiveness evaluation systems have some problems such as systematic method for setting and evaluating cost factors, estimation of single effect on each R&D project, and estimation of cross effects among R&D projects. To solve these problems, we have designed a new evaluation indicator called a $ulcorner$Cost-Cross Effect Integration Indicator$lrcorner$ including cross effects developed in this research. The major research findings are summarized as follows : (1) $ulcorner$Coist Estimation Model$lrcorner$, which estimates the cost factors divided into two classes of assembly product and system product and then integrates the total cost values, has been designed. (2) A new method for estimating parameters of cross effects among R&D projects has been developed. (3) $ulcorner$Cross Effects Estimation Model$lrcorner$ to estimate multi-effects and cross effects by completion time among several projects has been designed. (4) $ulcorner$Integration Estimation Indicator$lrcorner$ for setting priority on a project group has been extracted by combination of total cost value and total effect value.

Outcome of a Pilot Project on Case Management Service for Medical Aid Clients (의료급여텔레케어사업 효과 - 일 시범지역을 대상으로 -)

  • Oh, Jin-Joo
    • Journal of Korean Public Health Nursing
    • /
    • v.24 no.1
    • /
    • pp.61-70
    • /
    • 2010
  • Purpose: This study analyzed outcomes of a Telecare case management service pilot project for Korean Medicaid Program Clients in Seoul. Outcome data for provided services and medical aid cost data were analyzed. Methods: Case management services were delivered by 10 medical aid managers. The period of the project was from July to December 2007. Results: The total number of the objects was 9714, representing 43.4% of the total medical aid clients in the area. The average number of consults was 2.58. Consults were most frequently via letter and telephone, with in- person visits being least common. Of the total, 213 cases were referred to community services, 87.8% were transacted successfully. The medical expenditure was less than that from January-June, 2007. Conclusion: Telecare service via mail or telephone allows contact with many clients in a short time which can enable the discover and monitoring of high risk clients. This can be accomplished at a cost savings to the Korean Medicaid Program.

Construction of Time - Cost Model for Building Projects in Vietnam

  • Long, Le-Hoai;Lee, Young-Dai;Cho, Jeong-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.130-138
    • /
    • 2009
  • Bromilow's time-cost (BTC) relationship was examined for building projects in Vietnam using actual construction time and total construction cost. Data set was collected from 77 historical building construction projects completed between 1999 and 2005 which were adjusted by consumer price index (CPI) to 2000 price. Time-cost equations were specified respected to two sectors, public and private, in Vietnamese construction industry and all cases. It is shown that a public funded building project has the longer construction duration than a similar budget private funded project. The resulting models are statistically significant. The adjusted R-square coefficients of all cases, public and private projects models are respectively 0.403, 0.436 and 0.377 mean that the BTC regression lines moderately fit the data set.

RISK MANAGEMENT IN CIVIL CONSTRUCTION PROJECTS - FROM COST ESTIMATING PERSPECTIVE

  • Ashley Jaensch;Jian Zuo;Nicholas Chileshe
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.162-167
    • /
    • 2011
  • Construction projects are full of risks. This is particularly the case in civil construction projects that are often featured with large scale, complexity and involving a large number of participating parties. The eventuation of risks typically results in extended project durations leading to an increase in the total project budget. The consequence can be amplified considering the significant impacts of civil construction projects on the society, from economical, environmental and social perspectives. This research investigates the significance of risks within civil construction projects and approaches to deal with risks. Semi-structured interviews were undertaken with local industry practitioners in South Australia on this matter. It is found that the industry is fairly aware of risks associated with civil construction projects and subsequently has procedures in place to attempt to minimize the impacts of these risks on the project outcomes. The interview results also indicate that there is limited utilization of software for the risk management purpose from the cost estimation perspective.

  • PDF

A Study on the Improvement of Total Cost Change Control in Private Investment Projects (민간투자시설사업에 있어 총사업비 변경관리의 개선방안 연구 - 고속도로 민간투자시설사업을 중심으로)

  • Kim Se-Jong;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.119-126
    • /
    • 2001
  • This paper analyzes problems related to total cost changes in private investment projects, and then proposes an improvement measure for the control of cost changes within the framework of the project management, contract, human resource, project communication, cost, and time management. From the viewpoint of contract management, the basis of cost change ought to be cleared up with standardization of related provisions in the concession agreement, and potentiality of change ought to be excluded with prescription of the private investor's leading role from the design phase. Regarding human resource management, this paper proposes a standard work flow granting much sovereign rights to private parts by putting restriction on work scopes of the entrusted authority of government, and transferring the rights of assignment, contract, and control about the responsible supervisor to the concessionaire. With regard to project communication management the notification of changes on drawings and technical documents ought to be automated and the realtime database ought to be established with DMIS (Drawings & Documents Management Information System). From the cost management point of view, this thesis integrates the control of cost-change-approved items and disapproved items to one cost breakdown system, and then harmonizes the actual progress with EVMS in time management.

  • PDF

Research on RAM-C-based Cost Estimation Methods for the Supply of Military Depot Maintenance PBL Project (군직 창정비 수리부속 보급 PBL 사업을 위한 RAM-C 기반 비용 예측 방안 연구)

  • Junho Park;Chie Hoon Song
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.5
    • /
    • pp.855-866
    • /
    • 2023
  • With the rapid advancement and sophistication of defense weapon systems, the government, military, and the defense industry have conducted various innovative attempts to improve the efficiency of post-logistics support(PLS). The Ministry of Defense has mandated RAM-C(Reliability, Availability, and Maintainability-Cost) analysis as a requirement according to revised Total Life Cycle System Management Code of Practice in May 2022. Especially, for the project budget forecast of new PBL(Performance Based Logistics) business contacts, RAM-C is recognized as an obligatory factor. However, relevant entities have not officially provided guidelines or manuals for RAM-C analysis, and each defense contractor conducts RAM-C analysis with different standards and methods to win PBL-related business contract. Hence, this study aims to contribute to the generalization of the analysis procedure by presenting a cost analysis case based on RAM-C for the supply of military depot maintenance PBL project. This study presents formulas and procedures to determine requirements of military depot maintenance PBL project for repair parts supply. Moreover, a sensitivity analysis was conducted to find the optimal cost/utilization ratio. During the process, a correlation was found between supply delay and total cost of ownership as well as between cost variability and utilization rate. The analysis results are expected to provide an important basis for the conceptualization of the cost analysis for the supply of military depot maintenance PBL project and are capable of proposing the optimal utilization rate in relation to cost.

A Dual-Population Memetic Algorithm for Minimizing Total Cost of Multi-Mode Resource-Constrained Project Scheduling

  • Chen, Zhi-Jie;Chyu, Chiuh-Cheng
    • Industrial Engineering and Management Systems
    • /
    • v.9 no.2
    • /
    • pp.70-79
    • /
    • 2010
  • Makespan and cost minimization are two important factors in project investment. This paper considers a multi-mode resource-constrained project scheduling problem with the objective of minimizing costs, subject to a deadline constraint. A number of studies have focused on minimizing makespan or resource availability cost with a specified deadline. This problem assumes a fixed cost for the availability of each renewable resource per period, and the project cost to be minimized is the sum of the variable cost associated with the execution mode of each activity. The presented memetic algorithm (MA) consists of three features: (1) a truncated branch and bound heuristic that serves as effective preprocessing in forming the initial population; (2) a strategy that maintains two populations, which respectively store deadline-feasible and infeasible solutions, enabling the MA to explore quality solutions in a broader resource-feasible space; (3) a repair-and-improvement local search scheme that refines each offspring and updates the two populations. The MA is tested via ProGen generated instances with problem sizes of 18, 20, and 30. The experimental results indicate that the MA performs exceptionally well in both effectiveness and efficiency using the optimal solutions or the current best solutions for the comparison standard.