• Title/Summary/Keyword: Total project cost management

Search Result 200, Processing Time 0.026 seconds

Study on Development for Plan Model of Tunnel construction by using Arena;on focused NATM (ARENA를 활용한 터널공사계획모델 개발에 관한 연구;NATM공법을 대상으로)

  • Lee, Si-Wook;Kim, Ok-Ki;Woo, Sung-Kwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.872-875
    • /
    • 2007
  • Estimation of total construction period and cost in the early stage of the project is very important. Simulation is one of the method considering proper compound such as tools, materials for effective construction management and estimating and analysing affected factors to construction through making suitable process. This study is to develop the model by using Arena simulation considering limited facts like blast time in a subway tunnel construction of both sides inner city. Developed model is easily useful type by using Visual Basic program, and can obtain total construction period and cost as a result. It could be used as a decision making tool in early stage of the construction.

  • PDF

Development of Integrated Cost and Schedule Management System using Work Package Concept for Efficient Project Management (Work package 개념을 활용한 현장의 공정관리와 공사비 통합관리 효율화 방안)

  • Kim, Yongpyo;Lee, Yongjun;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.32-40
    • /
    • 2017
  • Korean construction industry is facing downtime mood and need more productivity. In order to successfully accomplish the construction project with more productivity, systematic and reasonable schedule management techniques should be developed and utilized. Therefore, in this study, first, a current status of the schedule management in the construction site is identified and the improvements in the schedule management are suggested. And, the effective schedule management technique in the construction site is proposed based on the in-site experience of the researcher. In order to find solutions, survey questionnaires designed to measure the understanding of process management and measure perception of the importance of schedule management. Total twenty nine field engineers who are performing schedule management of construction project at domestic civil engineering construction site were participated in the survey, and In-depth interviews were conducted. Eleven construction sites are inspected. Finally, a simple and effective schedule management technique including from WSB classification to schedule analysis, performance management, and performance improvement is proposed based on the inspection of current status of schedule management in civil engineering construction site.

A Building Scheme on LAMIS for ROK Army (한국군 종합군수지원 관리정보체계 (LAMIS) 구축방안)

  • Hong Jang-Ui;Yun Hyeon-Cheol;Byeon Jae-Jeong
    • Journal of the military operations research society of Korea
    • /
    • v.18 no.2
    • /
    • pp.1-22
    • /
    • 1992
  • Computer-aided logistics support system is recognized an essential system to reduce supply and maintenance cost, and to improve readiness of weapon system or operationable composite machines. According to these trends, this paper focuses on the design scheme and the computerization strategy of information management system for Integrated Logistics Support (ILS) work. Suggested system. LAMIS(Logistics support Analysis Management Information System) is a total system that composed of Logistics Support Analysis Management information system (LSAM), Configuration Management Information System (CMIS), Maintenance Management Information System (MMIS), Project Management System (PMS) and Information Retrival System(IRS) etc. Also, LAMIS is a computerized tool that improves current supply and maintenance support program, that attempts to reliable requirment analysis of logistics support elements, and that supports to use the existing technical specification of similar one when weapon system acquisition project is started newly. When LAMIS implication is completed, it can be applied to logistics support of defense or commercial site. Straightway, LAMIS will be enhanced with computer - aided design system, engineering drawing system, interactive electronic technical manual system, electronic data interchange system, and three dimensional simulation system to weapon system configuration. When that is done, LAMIS is CALS system.

  • PDF

Analysis and Survey on Occupational Safety and Health Management Expenses in the Construction Industry (건설업 산업안전보건관리비 사용 실태조사 및 분석)

  • Sung-Yun Kang;Oh-Se Wook;Kim-Chang Won;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.2
    • /
    • pp.113-120
    • /
    • 2023
  • Occupational safety and health management expenses in the construction industry are statutory and separately included in the cost statement to prevent occupational accidents and health problems. The expenses are determined by multiplying the standard amount by the rate decided according to construction types and scales. However, the current expense appropriation method does not properly reflect the recent changes in the construction industry such as industry size, industry diversification, and social atmosphere about safety reinforcement. This study surveyed 1579 questionnaires in total and analyzed expense execution rate and proportion of each expense category. The expense execution rate was relative higher in complex construction (e.g., heavy construction = 126%, civil engineering = 125%) and long-period project (equal to or over 48 months construction = 133%) compared to general construction (98~116%) and short-period project (less than 48 months construction = 115%). The proportion of spending expenses was higher in the category of safety manager labor costs (25~52%), safety facility costs (22~40%), and personal protective equipment costs (10~25%). The analysis results of the study can be utilized in revising the standard expense appropriation method by reflecting the current usages of the occupational safety and health management expenses in the construction industry.

Survey of Corrosion Cost in China and Preventive Strategies

  • Ke, Wei;Li, Zhiqiang
    • Corrosion Science and Technology
    • /
    • v.7 no.5
    • /
    • pp.259-264
    • /
    • 2008
  • A national consultative project entitled "corrosion cost survey in China and preventive strategies" was funded by the Chinese Academy of Engineering in 1998. Soon afterwards, an expert group was organized jointly by the Institute of Metal Research, CAS and Chinese Society of Corrosion and Protection. The report on corrosion cost survey in China was published in 2003. According to this report the overall annual corrosion cost in China estimated by the Uhlig Method and Hoar Method at 1997-2001 was found to be 200.7 billion Yuan RMB and 228.8 billion Yuan RMB respectively, which is equivalent to 2% of the gross national product of China. However the total cost of corrosion including the direct and indirect cost was estimated to be more than 500 billion Yuan RMB per year in China. Among them, corrosion cost of infrastructure ranked in first comparing with other sectors. Although corrosion costs in some sectors, such as electric power, petrochemical, oil pipeline and railway in China has reduced in the past years, significant losses are still being encountered in most sectors of industries and cost-effective methods have not always been implemented. Both successful and unsuccessful cases in corrosion control and corrosion management were collected. As the investment in capital construction continues increasing rapidly in China, the maintenance and life extension of the infrastructures will become a big issue. The preventive strategies have been suggested

A Normative Analysis on Broiler Farm investment in Korea (육계 건물 및 시설에 대한 투자 분석)

  • 김정주
    • Journal of Animal Environmental Science
    • /
    • v.3 no.1
    • /
    • pp.49-56
    • /
    • 1997
  • Most of Korean broiler farms are constructed with vinyl houses. Such types of broiler farms might be cheaper in terms of cost, but poor in terms of environment condition. According to enlargement of broiler farm size, high value production systems or automatic facilities are introduced in this field. However, investment may not always guarantee the profit of the management. Therefore, it is necessary to undertake the investment analysis before decision making for the investment. Under the assumption that 870 Pyoung(≒$3.3㎡) of a broiler farm within 1,740 Pyoung(≒3.3㎡) of land is built with the producing capacity of 50,000 heads of chicken in a time. The total investment is calculated to be 600 million won(1,000 won≒$1.1), and out of them 58.1% is provided by the owner, 31.6% from the government loan, 5.8% from government subsidy, and 5.3% from other agencies or banks. The expected profit of the broiler farm is 64.6 million won(1,000 won≒$1.1) per year. The IRR calculated is 0.0808 which means that the rate to profit of this project would be 8.1%. This also means that for this investment the interest rate of the capital provided should be less than 8.1% per year. Considering that the current opportunity cost of the own capital is 8.5% this project is not so attractive for those who is going to build broiler farms mainly with their own capital. In other words this project would not be profitable, unless the average interest rate of the loans provided for this project is less than 8.1% per year.

BIM-BASED TIME SERIES COST MODEL FOR BUILDING PROJECTS: FOCUSING ON MATERIAL PRICES

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.1-6
    • /
    • 2011
  • As large-scale building projects have recently increased for the residential, commercial and office facilities, construction costs for these projects have become a matter of great concern, due to their significant construction cost implications, as well as unpredictable market conditions and fluctuations in the rate of inflation during the projects' long-term construction periods. In particular, recent volatile fluctuations of construction material prices fueled such problems as cost forecasting. This research develops a time series model using the Box-Jenkins approach and material price time series data in Korea in order to forecast trends in the unit prices of required materials. Building information modeling (BIM) approaches are also used to analyze injection times of construction resources and to conduct quantity take-off so that total material prices can be forecast. To determine an optimal time series model for forecasting price trends, comparative analysis of predictability of tentative autoregressive integrated moving average (ARIMA) models is conducted. The proposed BIM-based time series forecasting model can help to deal with sudden changes in economic conditions by estimating material prices that correspond to resource injection times.

  • PDF

Developing an Owner's Project Evaluation Framework for Construction Management (프로젝트 관리자로서의 발주자 사업수행평가 프레임워크 개발)

  • Kim, Jonghoon;Lee, Hyun-Soo;Park, Moonseo;Park, Sanghyuk;Lee, Inbeom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.130-137
    • /
    • 2016
  • Owner's participation on a construction project can alter the success of a construction project. In general, success of a construction project is measured by project schedule and cost decrease without considering the role an owner has in a project. As a result, this research developed a framework for the project evaluation form and after extracting a total of 9 project critical success factors (CSF) and 27 sub-CSF. AHP method was utilized to evaluate the importance factor of each CSFs. Setting a goal for each CSFs at the beginning of a project and comparing the values at the completion of the project utilizing the project evaluation form will allow a systematic evaluation and management of a project. Solution Map was introduced and Solution Tool was suggested in order to utlize the evaluation results effectively. In the future studies, various project cases needs to be supplemented for further verification and a solution based on the evaluation result needs to be developed that can be applied to construction projects.

A Relationship of Managing Impacts of FOREX Fluctuations and Organizational Capabilities in Construction Business

  • Mohamed, Mohd Amizan Bin;Teo, Melissa;Kajewski, Stephen;Trigunarsyah, Bambang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.477-480
    • /
    • 2015
  • Construction projects are high-risk activities. When undertaking such projects in an international setting, it can be complicated by foreign exchange (FOREX) fluctuation risk. This affects the construction business performance in various ways, namely its progress due to delays, which in turn create further problems, specifically cost overruns as a result of price increase in raw materials, disputes, arbitration, litigation and even, total abandonment. Thus, the effective management of FOREX fluctuations is crucial. Previous studies have focused on the need for contract safeguards, adequate insurance, careful planning and management, as well as foreign exchange futures hedging to address some of the risks triggered by FOREX fluctuations. An analysis of FOREX fluctuations in the international construction industry revealed that more often it was focused on project-specific issues. Currently, there is a relative lack of awareness on Organizational Capabilities (OC), the abilities that owned by the organization, which is essential in managing the impact of FOREX fluctuations. Where research has focused on OC, these are viewed in isolation. Therefore, this study attempts to close the gap by proposing a framework on managing the impact of FOREX fluctuations in the international construction industry, employing the OC perspective.

  • PDF

An Analysis on Expanding Construction Insurance and Estimating Necessary Budget (건설공사보험 확대 당위성 및 예산소요 분석 연구)

  • Kim, Myeongsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.94-102
    • /
    • 2014
  • This study analyzes necessity of expanding construction insurance and estimates required budget. Construction insurance is obliged by National Contract Law and Local Contract Law to protect projet owners and contractors from any unexpected construction risk such as financial losses in construction process. Currently the contracts of design-build and alternate-bid projects as well as PQ project, which are greater than 20 billion won, require the contractors to provide construction insurances in Korea. Insurance premiums are borne by the public project owner. Those contractors whose contract volume is less than 20 billion won burden all risks of projects at their cost. This causes equity problem. Because small-and-medium contractors are discriminated against large contractors since insurance-obliged projects are performed by large contractors and insurance premiums are borne by the public project owner. On the other hands, in all engineering projects, regardless of volume, insurance premiums are borne by the project owner. Therefore current regulation has to be improved, by expanding to all public projects. The average ratio of unobliged projects is 46%, in recent 3 years, prime cost of insurance companies is estimated 0.2%. Moreover considering risks of each construction type, prime cost of unobliged works is estimated as 0.13%. Hence additional necessary budget is estimated to be 2.09 billion won if total volume of public work is 3.5 trillion won. And 2.39 billion won is derived if total volume of public projects is 4 trillion won.