• Title/Summary/Keyword: Total Operation Time

Search Result 1,152, Processing Time 0.031 seconds

The test bed for teleoperated space robot (우주로봇 원격제어 테스트 베드)

  • 김동구;박종오
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1997.10a
    • /
    • pp.760-763
    • /
    • 1997
  • Using telesensor programming method, we control the space robot which has two 2-DOF manipulators. To make this control system, we devide total works by elemental operation. And we make a simulation system that can simulate sensors and robot. In the simulation system, we make a sensor data and robot paths by "Teaching by showing" method. And using these data, we control the real space robot. This off-line method can solve long time delay problem in teleoperation.operation.

  • PDF

Continuous Review (Q, r) Inventory Model with Stochastic Lead Time (확률적 조달기간을 갖는 연속조사 (Q,r) 재고모형)

  • Lee Chang-Hui;Min Gye-Ryo
    • Journal of the military operations research society of Korea
    • /
    • v.18 no.2
    • /
    • pp.181-191
    • /
    • 1992
  • In this paper in order to prevent break of operation of equipments resulted from the delay of parts supply, the continuous review(Q, r) inventory model with probabilistic lead time is developed. If the lead tire is random varivable, the cycle also is stochastic. Then it is not easy to obtain the total cost equation of this inventory model. Therefore it is assumed that one cycle is the interval of reorder points. When the lead time is assumed to have exponential probability distribution, the lot-size and reorder point which minimize total cost are obtained. And as the lead time increases, the order quantity and the total cost are greater, but the reorder point increases by a certain point of time and then decreases.

  • PDF

A Development Of An Outage Scheduling Program (휴전일정검토 프로그램 개발)

  • Lee, Woon-Hee;Zoo, Haeng-Roe
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.30-32
    • /
    • 2006
  • New building, reinforcement, maintenance and test of power equipments are always necessary in a power system. Our power system is getting old and the total power capacity is also getting large, so power equipment outages are getting often. Power euipment outages make less margine for a stable condition of a power system operation. Therefore, through overviews and countermeasures against the outage should be made in order to be in a stable operational conditions during the outage. We have too many outages over 300 per month in our power system. So, we can't have enough time to study our power system and to make countermeasures without a helping program. This program is designed to give various and appropriate informations necessary for an outage scheduling. By applying this program, we can raise the job efficiency high and spare the time spent. So we can afford to do through system studies and make good countermeasures. I think this program can contribute greately to power system stable operation.

  • PDF

A Study on Minimization of Train Delays and Train Operation Interruptions by RF Transmission System. (RF 통신시스템을 이용한 열차 운행중단 및 열차 지연의 최소화에 관한 연구)

  • Lee, We-Jae;Kook, Kwaung-Ho
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1466-1472
    • /
    • 2008
  • To minimize the train operation interruptions and train exchanges, the RF transmission system is proposed. The current control room of the Seoul Metro has information of the train movement through the Total Traffic Control System, but it does not have information of the train itself, rail status, and other facilities' status. When some trouble occurs during train operation, the train crews should report the control room about the trouble and fix it. If the control room has exact information of the trouble, the expert in the control room can help the crews to fix the trouble swiftly and exactly. Since the crews are busy taking care of the trouble, they often miss to report the control room on time. The proposed RF transmission system relays the information of the train to the control room automatically in real time, and makes it possible to provide the passengers good service by reducing the train operation interruptions and train exchanges.

  • PDF

Characteristics of Nitrogen and Phosphorus Removal According to the Variation of Operating Cycles in (AO)2 SBBR ((AO)2 SBBR에서 운전주기에 따른 질소와 인 제거 특성 비교)

  • Park, Young-Seek;Kim, Dong-Seog
    • Journal of Environmental Science International
    • /
    • v.16 no.1
    • /
    • pp.45-53
    • /
    • 2007
  • This study was carried out to investigate the variation of organic, nitrogen and phosphorus in $(AO)_2$ SBBR process according to the variation of operating cycle at the high TOC concentration. The operation time in anoxic (anaerobic) time to oxic time was 1:1. Three lab-scale SBBRS were fed with synthetic wastewater based on glucose as carbon source, The variation of total TOC removal was similar each other irrespective of operation time, however, the TOC concentrations in SBBRs showed a little difference according to the operating condition. In SBBR, complete nitrification was not occurred at all reactors, however, R3 showed a higher nitrification than R2. And in SBBR, the variation of operating time more affected at phosphorus removal than nitrogen removal. R2 which had the shortest time at the 1st aeration time showed the lowest phosphorus release and uptake efficacy.

Clinical Analysis of Surgery for Aortic Disease (대동맥 질환 수술의 임상적 고찰)

  • 안정태
    • Journal of Chest Surgery
    • /
    • v.28 no.10
    • /
    • pp.906-911
    • /
    • 1995
  • From January 1991 to January 1995, 11 patients with aortic diseases underwent various surgical repairs. The age at operation ranged from 26 years to 63 years[ mean=50.9 years . The disease entities included 8 aortic dissections[ type I in 4, type II in 2 and type III in 2 cases , 2 Marfan`s syndrome with annuloaortic ectasia and 1 desecending thoracic aortic aneurysm The operative procedures we tried were 3 Bentall`s operation, 5 graft replacement of ascending aorta, and 3 graft interposition in descending thoracic aorta.Overall hospital mortality rate is 36.3%[4/11 . And causes of death are pump weaning failure in 2 cases and multiorgan failure in 2 cases. It was that 2 sternal dehiscence & mediastinitis, 1 acute renal failure, 2 hypoxic brain damages and 2 postoperative psychosis were complicated. Recently we tried surgical repair of aortic dissection five out of 6 cases using total circulatory arrest with deep hypothermia at 14$^{\circ}C$. Total circulatory arrest time ranged from 18 to 26 minutes[ mean 22.2 minutes , and mean aortic cross-clamping time was 48.2 minutes. One of 5 patient died on the 7th postoperative day due to multiorgan failure. Mortality of patients with TCA was 20%[1/5 , and it of remainders was 50%[3/6 . Our result for surgical repair using total circulatory arrest with deep hypothermia is satisfactory on the basis of our clinical data.

  • PDF

Allocation Model of Container Yard for A TC Optimal Operation in Automated Container Terminal

  • Kim, Hwan-Seong;Nguyen, DuyAnh
    • Journal of Navigation and Port Research
    • /
    • v.32 no.9
    • /
    • pp.737-742
    • /
    • 2008
  • In this paper, we deal with an allocation model of vertical type container yard for minimizing the total ATC (Automated Transfer Crane) working time and the equivalence of ATC working load in each block on automated container terminal. Firstly, a layout of automated container terminal yard is shown The characteristic of equipment which work in the terminal and its basic assumption are given Next, an allocation model which concerns with minimizing the total working time and the equivalence of working load is proposed for effectiveness of ATC working in automated container terminal. Also, a weight values on critical function are suggested to adjust the critical values by evaluating the obtained allocation plan. For ATC allocation algorithm, we suggest a simple repeat algorithm for on-line terminal operation.

Study on Multi-scale Unit Commitment Optimization in the Wind-Coal Intensive Power System

  • Ye, Xi;Qiao, Ying;Lu, Zongxiang;Min, Yong;Wang, Ningbo
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.6
    • /
    • pp.1596-1604
    • /
    • 2013
  • Coordinating operation between large-scale wind power and thermal units in multiple time scale is an important problem to keep power balance, especially for the power grids mainly made up of large coal-fired units. The paper proposes a novel operation mode of multi-scale unit commitment (abbr. UC) that includes mid-term UC and day-ahead UC, which can take full advantage of insufficient flexibility and improve wind power accommodation. First, we introduce the concepts of multi-scale UC and then illustrate the benefits of introducing mid-term UC to the wind-coal intensive grid. The paper then formulates the mid-term UC model, proposes operation performance indices and validates the optimal operation mode by simulation cases. Compared with day-ahead UC only, the multi-scale UC mode could reduce the total generation cost and improve the wind power net benefit by decreasing the coal-fired units' on/off operation. The simulation results also show that the maximum total generation benefit should be pursued rather than the wind power utilization rate in wind-coal intensive system.

A Heuristic Algorithm of Berth Assignment Planning in a Container Terminal (발견적 알고리즘에 의한 컨테이너 터미널의 선석배정에 관한 연구)

  • Lee, H.G.;Lee, C.Y.
    • Journal of Korean Port Research
    • /
    • v.9 no.2
    • /
    • pp.1-8
    • /
    • 1995
  • Generally, berth assignment problem has conflicting factors according to the interested parties. In the view of shipping company, it is desirable that berth assignment is made according to the order of arrival. But in the view of port operator, it is better to be assigned regardless the order of arrival to promote the efficiency of berth operation. Thus, it is necessary to establish berth assignment planning which reflects both of interests in a practical situation. This paper aims to develop a reasonable berth assignment algorithm in a container terminal by considering the prescribed factors, and suggests three types of models minimizing the objective functions such as total port staying time, total mooring time and total maximum mooring time by using MPS concept. These models are formulated by 0-1 integer programming and min-max type function, but as the number of variables increases, an optimal solution cannot be achieved easily within a desired computational time. Thus, to tackle this problem this paper proposes a heuristic algorithm, and also the heuristic algorithm proposed in this paper is verified through the several examples.

  • PDF

On the Optimal time for Renewal of Facilities (설비교체의 최적시기 결정에 관하여)

  • Choi, Eun-Chae
    • Journal of the military operations research society of Korea
    • /
    • v.3 no.1
    • /
    • pp.109-114
    • /
    • 1977
  • There are some factors which cause the profits from the production to be decreased or increased. They are, for example, the rise in efficiency of production facilities resulting from the development of the scientific technique, the changes of purchase price of those, and the drop in efficiency of those owing to there long-term operation. In this connection, an manager can get the highest profit by deciding the proper time of new facilities replacement for those in operation or in being planned, which leads to good management planning of his manufactaring business for a given period or a long time. Main purpose of this is the study of how we decide the optimal time or facilities replacement in order to maximize the total profits for a given period by considering them as continous function as to the time in the case where a machineng is set. The results are following: 1. The definition of profit function is in duced in consideration of the breakdowns caused from continous operation of the machinery. 2. The necessary conditions are obtained for the optimal time of replacement and find out the methods of its solution. 3. Comparing between the 'Short cut' method and method in this paper, we obtained that our method is more realistic.

  • PDF