• Title/Summary/Keyword: Top-Down Construction

Search Result 147, Processing Time 0.029 seconds

A Study on Bearing Capacity of Cast-In-Place Pre-Founded Columns in Top Down Construction Sites (Top Down 공사현장에 적용되는 현장타설 선기초기둥의 지지력에 관한 연구)

  • Byun, Yoseph;Jung, Kyoungsik;Kim, Jongho;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.12
    • /
    • pp.55-61
    • /
    • 2011
  • Recently, a concept of the downtown area was progressively extended by improvement of rapid transportation system and development of the most advanced telecommunication industries. And underground has become bigger in addition deeper, Excavation methods which construct a structure were changed according to construction environments. Top Down methods which are continuous with architectural plan differ from existing excavation methods innovatively, pre-founded column is an important factor for construction methods, duration, expenses. Therefore, this study considers application by investigative methods according to comparison, analysis on loading test result of on site inspection and estimated results of bearing capacity for structure pre-founded column. As a result, almost designing eclipse appeared prior value which didn't arrive result of load test. Also, evaluate permanent load for the compressive stress acting on head of cast-in-place after basic structure was installed. Then, applying stress generally is reduced by confining effect with foundation.

A Study On Void Check for Top-Down Column Joint by Field Experiment (현장실험을 통한 역타설 이음부의 공극특성 분석)

  • Lee, Young-Do;Jung, Sang-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.1 s.15
    • /
    • pp.105-109
    • /
    • 2005
  • Classified with concrete as placing ways - direct ways, sheath way - and placing directing flange direction, web direction - is analyzed section and strength of hardened concrete. The results of this study is belows the more fluid of concrete, the more useful to top-down method. To minimize the voids of the reverse placement joints, It is more effect to use the sheath method than direct method in concrete placement. If the joint face is a plane, it is impossible to extract the air bubbles which caused voids, so we should consider about this, and decide to select which type of joints.

An Elemental Study for construction elevation of a Underground Columns in Top-Down construction Method (TOP-DOWN공법에 의한 지하기둥의 시공성 향상을 위한 기초적 연구)

  • 임형일;박희곤;백민수;조상영;이영도;정상진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.1059-1064
    • /
    • 2001
  • This study is about accurate steel column position method in the Top down method's delicate part. When the concrete is placing, it is required that complementary measures to the transformation due to concrete pressure, column buckling, the trouble due to bar net inserting and so on. To solve the problem of exist method, the concrete is placed at the bottom of excavated hole in advance. then, the steel column is inserted into the excavated hole. With a new method try, the problem due to placing pressure and others is could be prevented. In this study, the concrete is examined with test-slump, slump flow, and compressive strength to do quantitative analysis of concrete. The factors of the experiment is plasticizer, retarder addition rate, fly ash substitution rate to cement. Considering of the new method try, the retarder added concrete properties-fluidity, viscosity, strength-is investigated as time lapsing.

  • PDF

Compression Tests on Opened Slab (개방형 슬래브의 압축 성능 실험)

  • Choi, Lin;Goh, Soo-Jin;Yom, Kyong-Soo;Jeon, Keum-Seok;Rhim, Hong-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.29-31
    • /
    • 2007
  • Building construction in downtown is ever increasing with a strong demand. Top-Down Method is one of suitable construction method for its advantage in minimizing disturbance to neighborhood. Along with these reasons construction site has developed lots of new methods and materials for Time-Cost Trade-off and improving constructability. Opened Slab is one of these method which resist the horizontal force by slab and it has many merit about construction time and unity. We analyze the compression tests on opened slab for the application.

  • PDF

Non supporting form system for down ward construction and non supporting down ward construction method using the same (상.하 분리형 지지방식의 무지주 역타설 거푸집 공법용 거푸집 지지체 및 이를 이용한 역타설 거푸집 공법)

  • Yom, Kyong-Soo;Jeon, Keum-Seok;Goh, Soo-Jin;Rhim, Hong-Chul;Lee, Je-Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.25-28
    • /
    • 2006
  • The contiguous construction in downtown area requires an appropriate substructure construction method since it results in the insufficient working spaces and frequent public resentment by noise and vibration. In particular, Top-down method usually is applied for downtown construction, and followed by several difficulties in casting the slab concrete for substructure. In this study, we focus on the improvement workability for substructure construction.

  • PDF

A Top-down based Control Tree Construction Mechanism for Reliable Multicast Transport Protocols (신뢰적인 멀티캐스트 전송 프로토콜을 위한 Top-Down 기반의 제어 트리 구축 방안)

  • Kim, Eun-Sook;Koh, Seok-Joo;Kang, Shin-Gak;Choe, Jong-Won
    • Journal of KIISE:Information Networking
    • /
    • v.28 no.4
    • /
    • pp.611-620
    • /
    • 2001
  • To meet the requirements of reliable service for various applications, a Reliable Multicast Transport Protocol should be implemented over IP Multicast where currently best-effort service is provided. Among the current researches, hierarchical tree-based mechanism has been proposed and actively studied. This mechanism is known to provide high scalability as well as reliability, but needs an additional tree configuring mechanism for building an efficient logical tree in transport layer. Bottom-up approach has been used for creating such a tree. This method has benefits from parallel tree construction for receivers, while it has some drawbacks such that it does not guarantee a loop-free tree and brings heavy message overhead during tree creation process. Therefore, this paper proposes a top-down based mechanism for constructing a control tree, which can guarantee loop-freeness by step-wise mannered tree building. From experimental simulations, it shows that the proposed mechanism has less message overhead. It is recommended that the bottom-up and the proposed top-down will be selectively used in real networks, according to the requirements of the concerned multicast applications.

  • PDF

A study on the simulation of flooding in Top-down construction site considering extreme rainfall (극한강우를 고려한 Top-down 현장 침수모의에 관한 연구)

  • Im, JangHyuk;Cho, HyeRin
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.30-30
    • /
    • 2022
  • 최근 기후변화로 인한 국지성 호우 빈도 및 강수량이 급증하는 등 극한강우 발생 가능성이 높아지고 있는 실정이다. 공공 기반의 유역 및 지자체별 침수 대응은 지속적으로 이루어지고 있으나, 건설 현장 대응은 이에 비해 미흡한 실정이다. 특히, 건설 현장의 경우, 예측할 수 없는 홍수 유출에 대해서도 기존 설계시 반영된 홍수 유출량과 기상청 정보에만 의존하고 있어 극한강우 발생시 취약성을 나타낼 수 있다. 특히, Top-down 현장은 개구부, 표면 작업을 위한 포장 등에 의해 지하부로 유입되는 강우량이 많고, 지하 굴착공사시 단차 및 지하수 발생으로 극한강우시 침수에 의한 수재해 발생 확률이 높다. 이를 대비하기 위해 XP-SWMM 모형을 이용하여 지상부와 지하부의 강우-유출량을 산정하고 지하부 침수를 모의하였다. 실제 Top-down 현장조사를 통해 침수 관련 인자와 XP-SWMM을 연계하여 침수모의 기법에 적용하였다. 관련 주요인자는 강우량, 현장 지상부 면적, 지상부 배수로, 지하 유입부, 지하 배수펌프 등으로 현장 조사결과 나타났다. 강우자료의 경우, 극한강우를 고려하기 위해 현장 지역의 최대 강우량, 태풍 루사와 기상청 강우의 증가 시나리오를 고려하여 모의에 적용하였다. 본 연구에서는 극한강우에 대한 Top-down 침수 모의를 수행할 수 있는 상용 모델링과 이와연관된 인자를 도출하여 침수 모의 기법을 최적화 하였다. 이러한 침수 모의를 통해 Top-Down 현장 침수심 등을 예측할 수 있다. 향후 이를 통해 지하공간이 있는 건설현장의 강우-유출 현상및 침수 모의가 가능하고, 실시간 현장별 침수 예측 모델 개발로 현장별 대피경로 및 대응방안을 제시하여 인적 피해를 최소화할 수 있을 것으로 기대할 수 있다.

  • PDF

Computer Simulation for Working Condition of Undergroundwork Using TOP DOWN Technique (TOP DOWN 지하공사의 작업환경체크 컴퓨터시물레이션에 관한 기초적 연구)

  • 고성석;손기상;심경수
    • Journal of the Korean Society of Safety
    • /
    • v.10 no.3
    • /
    • pp.96-105
    • /
    • 1995
  • The better industry develops, the more spaces need but in the limited area. Most building become larger and more complicated if the more spaces need in the constant area. And this leads to do underground work in long period generally six(6) months for 6 basement stories due to the selection of TOP DOWN technique. Working environment in this underground area can be problems and should not be overlooked, because air quality in underground spaces become quickly worse. Recently, department name to control construction safety has been changed to ENVIRONMENT & SAFETY TEAM from SAFETY TEAM. This means that it is very important to control against environmental condition at site so much. Overall construction work as well as underground work should conform to the requirement of working environment, particularly against inhabitants around the construction area. Strut protection, one of earth protection method, in case to 40m long strut may become weaker due to thermal stress or its longitudinally compressive strain and the another one, earth anchor protection may not be applied to the site In case of encroaching on vertical underground borderline because of regulation to prohibit it. It is necessary that TOP DOWN technique should be introduced in order to solve the external and internal problem of the site such as difficulty level of the work, potential danger with excavating depth, and shortening workperiod. It is needed that improving way of working condition should be shown and simplified computer simulation program should be also provided for checking pollution level & ventilation, excluding of lighting problem here. Results measured with conformance to the Regulation for Working Environment Measurement, enforced by Ministry of Labor have been applied to the computer program developed here. Sample air taken at unit workplace which was considered as exposing condition of pollutant at breathing point and within a range of behavior of the workers, Identified exposing group in underground work, using Moded Flow Life Finally, three types of ventilation system, type I with blower & ventilator, type II natural supply with mechanical ventilation system, and type I mechanical ventilation with Drivent Fan Unit System are selected for this study.

  • PDF