• Title/Summary/Keyword: Tool management

Search Result 4,253, Processing Time 0.032 seconds

Development of a Training System for Lathe Operation Using a Simulator with Relationship between Speed of Tool Feed and Cutting Sound/Shape of Chips

  • Kawashimo, Takashi;Doyo, Daisuke;Yamaguchi, Tatsuya;Nakajima, Ryosuke;Matsumoto, Toshiyuki
    • Industrial Engineering and Management Systems
    • /
    • v.14 no.2
    • /
    • pp.175-182
    • /
    • 2015
  • The recent manufacturing industry in Japan has found it difficult to transfer skills from trained workers to inexperienced workers because the former ages and then retires. This is a particular problem for lathe process, as this operation requires explicit and tacit knowledge, and defining the skills clearly in a manual is difficult. This study aims to develop a training system for lathe operation by using a simulator; this includes formulas that help define the relationship between the speed of tool feed and cutting sound/shape of chips which were proposed in the preceding study. The developed training system is verified the effectiveness.

Design and Implementation of Premium Sales Tool in Mobile Customer Relationship Management (MobileCRM에서 Premium Sales Tool의 설계)

  • Choe, Yun-Young;Park, Soo-Jung;Park, Seok-Cheon;Kim, Yong-Hee
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.04a
    • /
    • pp.975-977
    • /
    • 2012
  • Premium Seles Tool은 상품의 기능이나 특징, 가격, 디자인 등을 이미지나 동영상을 이용하여 알기 쉽게 설명하는 시스템으로 제품 카탈로그와 같은 성격을 지닌다. 그러나 종이 카탈로그와 전자카탈로그는 공간적 제약과 업데이트의 한계로 사용에 불편함이 따른다. 본 논문에서 설계한 MobileCRM PST는 사진이나 동영상을 애니메이션과 유저 인터액션을 통해 제품의 품질을 높일 수 있으며, 모바일의 특성인 이동성이 확보된다. 또한 새로운 컨텐츠 업데이트 시 서버와 모바일에서 컨텐츠를 관리함으로써 사용자는 최신 컨텐츠를 간편하게 받아 볼 수 있다.

Y Block Diagram as a New Process Notation in a GPS Manufacture

  • Lee, Jung-Gyu;Jeong, Seung Ryul
    • Journal of Internet Computing and Services
    • /
    • v.20 no.1
    • /
    • pp.125-133
    • /
    • 2019
  • Company A should maintain myriad conversion tools for the purpose of making a geometric compilation of navigation maps. Company A is already using complex compilation tools, which are tailored to geographical areas and various GPS models. However, due to frequent requirement and personnel changes, there is an endless challenge for perfect tool configuration and multiple map consolidation. To solve this problem, Company A launched a process automation project using Graphviz, which is an open source workflow graph visualization software. Before implementation, they had to document their current map compilation processes and then match it with the applicable conversion tool. For effective representation of process controls, a new graphical process notation is designed, i.e. Y Block diagram. The authors will compare Y Block diagram with other process notations and explain why Y Block diagram is more useful for tool based business processes such as digital map generation processes.

Evaluating the Performance of the Emergency Medical Services Index

  • Eun, Sang Jun;Lee, Jin-Seok;Kim, Yoon;Jung, Koo Young;Park, Sue Kyung;Lee, Jin Yong
    • Health Policy and Management
    • /
    • v.23 no.2
    • /
    • pp.176-187
    • /
    • 2013
  • Background: In 2006 Emergency Medical Services Index (EMSI), which summarizes the performance of regional emergency medical services system, was developed. This study assesses the performance of the EMSI to help determine whether EMSI can be used as evaluation tool. Methods: To build a composite score of the EMSI from predefined 24 indicators, 3 normalized values were calculated for each indicator, the normalized values of each indicator were weighted using 4 weighting methods, and the weighted values were aggregated into the final composite score using 2 aggregation schemes. The performance of EMSI was evaluated using 3 criteria: discrimination, construct validity, and sensitivity. Discrimination was the proportion of regions that did not include the overall median rank in the 5th to 95th percentiles rank interval, which was calculated from Monte Carlo simulation. Construct validity was a correlation among the alternative EMSIs. Sensitivity of EMSIs was evaluated by total shift of quartile membership and changes of 5th to 95th percentile intervals. Results: The total discrimination performance of the EMSI was 50.0%. Correlation coefficients between EMSIs using standardized values and those using rescaled values ranged from 0.621 to 0.997. Variation of the quartile membership of regions ranged from 0.0% to 75.0%. The total change in the 5th to 95th percentile intervals ranged from -19 to +17 places. Conclusion: The results suggested that the EMSI could be used as a tool for evaluating quality of regional EMS system and for identifying the areas for quality improvement.

The software configuration management system for image processing algorithm development (영상처리 알고리즘 개발을 위한 소프트웨어형상관리시스템)

  • Lee Jeong-Heon;Chae Ok-Sam
    • The KIPS Transactions:PartB
    • /
    • v.12B no.1 s.97
    • /
    • pp.1-8
    • /
    • 2005
  • The importance of software is getting high in development of the digital device (digital camcoder, digital camera, mp3 player, ....). And because the sire of software becomes larger and complicated, the necessity of software configuration management (to solves a software crisis) is increased. The general software configuration management system shows lack of the property and features of software development environment for image processing algorithm due to its wide range to be covered. Image processing algorithm development environment has properties like repetitive analysis and simulation using visual programming environment where, beside support of elementary development functions. component(or library) can be combined and tested interactively. Moreover, the method to look fast and effectively for component having similar function is required. In this paper, we present the system which supports the software configuration management method for a simulation tool and the property in the visual programming environment. And we relate our system to real simulation tool so as to check its ability as the software configuration management system for image processing algorithm development environment.

Development of Earned Value Management System by Using Visualization Index and WBS Map (시각화 지표 및 좌표식 정보분류체계에 의한 공정.공사비 통합관리시스템 개발)

  • Lee, Woo-Sik;Kang, Leen-Seok;Park, Seo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.26-35
    • /
    • 2009
  • Work breakdown structure (WBS) can be used as an information center in earned value management system (EVMS) for the construction project. Because EVMS results, such as schedule variance and cost variance, are analyzed for the selected WBS code, the role of WBS code is important in EVMS. This study suggests a methodology for organizing WBS map with a quadrant. It can represent the project organization collectively by work level in a coordinate system. And the study developed an EVMS tool based on the WBS map and this tool can visualize various attribute indexes of EVMS by color symbols. Those methodologies can be used for improving practical application of EVMS.

New Approach for Sustainable Technology: Strategic Niche Management (지속가능한 기술을 향한 새로운 접근: 전략적 니치관리(Strategic Niche Management))

  • Park, Dong-Oh;Song, Wi-Chin
    • Journal of Science and Technology Studies
    • /
    • v.8 no.2
    • /
    • pp.57-81
    • /
    • 2008
  • This paper reviewed outline of Strategic Niche Management(SNM) and its usefulness and limits as policy tool. SNM is based on Multi Level Perspective(MLP) that traces technological innovation and makes transition of lock-in socio-technical system. This approach is one of systematical then traditional one, market failure approach. SNM had get a attention not only as a analytical frame of technological development, but also tool of radical innovation, although its limits of theoretical and empirical immaturity. SNM could provide a new perspective to analysis and action within urgent needs of alternative innovation policy for aging society, news energy policy for sustainable and disaster policy in danger society.

  • PDF

A Study on Project Resource & Information Management with Internet Application(PRIMA system) (디지털 정보화를 통한 현장 자원 및 정보관리 기술에 관한 연구(PRIMA 시스템))

  • Kim Oe-Gon;Lee Dong-Ryul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.88-97
    • /
    • 2001
  • The Internet, the main issue of a new millennium, is being researched vitally for the progress of the construction industry, and the construction industry is considered to be led into a high-value added state-of-arts technology industry through CALS. Even if many construction companies gradually widen the use of the Internet for various purposes such as an electronic bidding system and an e-commerce system, the companies are still demanded to use the Internet more broadly and practically. Hence, the need for a tool for fast decision making and an effective construction management has risen. The PRIMA system has been developed specifically focused on meeting with those recent changes of the construction industry. This system is composed of three parts. Those are Just In Time(JIT) management, integrated application of man power${\cdot}$safety${\cdot}$work management and decision making process based on real-time information in the Internet. The usefulness of the PRIMA system has already been proved in a super-scale construction project. As the Internet environment get improved the use of the tool will be spread out gradually for many construction projects, regardless their size and location.

  • PDF

The Development of Schedule Risk Management Tools at the Preconstruction Phase in Building Construction - Focused on the Steel Work - (건축공사 착공 전 단계의 공정리스크 관리도구 개발 - 철골공사 중심으로 -)

  • Suh Sang-Wook;Yoon You-Sang;Kim Sun-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.177-185
    • /
    • 2005
  • The purpose of this study is to develop a supporting tool for efficient management, at preconstruction phase, of the schedule risk that is able to generate at construction phase. The main contents of this study to develop a practical tool are as follows. First steel work was selected as a relevant trade and a risk breakdown structure focused on the process of steel work having large effect on total construction process was made. Secondly, the work flow considering schedule risk factor was made and schedule risks that must be managed preferentially through analyzing the grade of importance for risk was selected. Finally, based on above two procedure, the management form for schedule risk was developed It is necessary to accumulate abundant data for schedule risk for other construction process and to develop a manual and a schedule risk management system.

Development of Management System for a Drainage Basin using Spatial Information (공간정보를 이용한 유역 관리시스템 개발)

  • Shin, Sha-Chul;Kim, Seong-Joon;Chae, Hyo-Sok;Kwon, Gi-Ryang;Lee, Yun-Ah
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.5 no.3
    • /
    • pp.33-44
    • /
    • 2002
  • The water resources information system of a watershed should be set up to understand the water management problems with reflecting basin characteristics for the effective water use. This study is to develop a watershed management system to be operated in water resources and water quality management. In order to promote effective utilization of this system, the various kinds of information data are collected, and this system could be utilized as a valuable tool for maximum uses of them. The information system developed in this study is constructed with GUI(graphic user interface) system using Arc-View and Visual Basic at the circumstances based on the PC. The integrated GIS and Remote Sensing based system is directed to the need for more detailed information on watershed management. The ability to present system clearly provides an indispensable tool for a river basin development and water management plan.

  • PDF