• Title/Summary/Keyword: Time-Cost Optimization

Search Result 713, Processing Time 0.027 seconds

A Study on Optimization Model of Time-Cost Trade-off Analysisusing Particle Swarm Optimization (Particle Swarm Optimization을 이용한 공기-비용 절충관계 최적화 모델에 관한 연구)

  • Park, U-Yeol;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.6
    • /
    • pp.91-98
    • /
    • 2008
  • It is time-consuming and difficulty to solve the time-cost trade-off problems, as there are trade-offs between time and cost to complete the activities in construction projects and this problems do not have unique solutions. Typically, heuristic methods, mathematical models and GA models has been used to solve this problems. As heuristic methods and mathematical models are have weakness in solving the time-cost trade-off problems, GA based model has been studied widely in recent. This paper suggests the time-cost trade-off optimization algorithm using particle swarm optimization. The traditional particle swarm optimization model is modified to generate optimal tradeoffs among construction time and cost efficiently. An application example is analyzed to illustrate the use of the suggested algorithm and demonstrate its capabilities in generating optimal tradeoffs among construction time and cost. Future applications of the model are suggested in the conclusion.

A multi-objective decision making model based on TLBO for the time - cost trade-off problems

  • Eirgash, Mohammad A.;Togan, Vedat;Dede, Tayfun
    • Structural Engineering and Mechanics
    • /
    • v.71 no.2
    • /
    • pp.139-151
    • /
    • 2019
  • In a project schedule, it is possible to reduce the time required to complete a project by allocating extra resources for critical activities. However, accelerating a project causes additional expense. This issue is addressed by finding optimal set of time-cost alternatives and is known as the time-cost trade-off problem in the literature. The aim of this study is to identify the optimal set of time-cost alternatives using a multiobjective teaching-learning-based optimization (TLBO) algorithm integrated with the non-dominated sorting concept and is applied to successfully optimize the projects ranging from a small to medium large projects. Numerical simulations indicate that the utilized model searches and identifies optimal / near optimal trade-offs between project time and cost in construction engineering and management. Therefore, it is concluded that the developed TLBO-based multiobjective approach offers satisfactorily solutions for time-cost trade-off optimization problems.

A Comprehensive Cash Management Model for Construction Projects Using Ant Colony Optimization

  • Mohamed Abdel-Raheem;Maged E. Georgy;Moheeb Ibrahim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.243-251
    • /
    • 2013
  • Cash management is a major concern for all contractors in the construction industry. It is arguable that cash is the most critical resource of all. A contractor needs to secure sufficient funds to navigate the project to the end, while keeping an eye on maximizing profits along the way. Past research attempted to address such topic via developing models to tackle the time-cost tradeoff problem, cash flow forecasting, and cash flow management. Yet, little was done to integrate the three aspects of cash management together. This paper, as such, presents a comprehensive model that integrates the time-cost tradeoff problem, cash flow management, and cash flow forecasting. First, the model determines the project optimal completion time by considering the different alternative construction methods available for executing project activities. Second, it investigates different funding alternatives and proposes a project-level cash management plan. Two funding alternatives are considered; they are borrowing and company own financing. The model was built as a combinatorial optimization model that utilizes ant colony search capabilities. The model also utilizes Microsoft Project software and spreadsheets to maintain an environment that incorporates activities, their durations, and other project data, in order to estimate project completion time and cost. Ant Colony Optimization algorithm was coded as a Macro program using VBA. Finally, an example project was used to test the developed model, where it acted reliably in maximizing the contractor's profit in the test project.

  • PDF

An Ant Colony Optimization Heuristic to solve the VRP with Time Window (차량 경로 스케줄링 문제 해결을 위한 개미 군집 최적화 휴리스틱)

  • Hong, Myung-Duk;Yu, Young-Hoon;Jo, Geun-Sik
    • The KIPS Transactions:PartB
    • /
    • v.17B no.5
    • /
    • pp.389-398
    • /
    • 2010
  • The Vehicle Routing and Scheduling Problem with Time Windows(VRSPTW) is to establish a delivery route of minimum cost satisfying the time constraints and capacity demands of many customers. The VRSPTW takes a long time to generate a solution because this is a NP-hard problem. To generate the nearest optimal solution within a reasonable time, we propose the heuristic by using an ACO(Ant Colony Optimization) with multi-cost functions. The multi-cost functions can generate a feasible initial-route by applying various weight values, such as distance, demand, angle and time window, to the cost factors when each ant evaluates the cost to move to the next customer node. Our experimental results show that our heuristic can generate the nearest optimal solution more efficiently than Solomon I1 heuristic or Hybrid heuristic applied by the opportunity time.

Optimization of theM/M/1 Queue with Impatient Customers

  • Lee, Eui-Yong;Lim, Kyung-Eun
    • International Journal of Reliability and Applications
    • /
    • v.3 no.4
    • /
    • pp.165-171
    • /
    • 2002
  • An optimization of the M/M/1 queue with impatient customers is studied. The impatient customer does not enter the system if his or her virtual waiting time exceeds the threshold K > 0. After assigning three costs to the system, a cost proportional to the virtual waiting time, a penalty to each impatient customer, and also a penalty to each unit of the idle period of the server, we show that there exists a threshold K which minimizes the long-run average cost per unit time.

  • PDF

Development of Query Transformation Method by Cost Optimization

  • Altayeva, Aigerim Bakatkaliyevna;Yoon, Youngmi;Cho, Young Im
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • v.16 no.1
    • /
    • pp.36-43
    • /
    • 2016
  • The transformation time among queries in the database management system (DBMS) is responsible for the execution time of users' queries, because a conventional DBMS does not consider the transformation cost when queries are transformed for execution. To reduce the transformation time (cost reduction) during execution, we propose an optimal query transformation method by exploring queries from a cost-based point of view. This cost-based point of view means considering the cost whenever queries are transformed for execution. Toward that end, we explore and compare set off heuristic, linear, and exhaustive cost-based transformations. Further, we describe practical methods of cost-based transformation integration and some query transformation problems. Our results show that, some cost-based transformations significantly improve query execution time. For instance, linear and heuristic transformed queries work 43% and 74% better than exhaustive queries.

Charging Control Strategy of Electric Vehicles Based on Particle Swarm Optimization

  • Boo, Chang-Jin
    • Journal of IKEEE
    • /
    • v.22 no.2
    • /
    • pp.455-459
    • /
    • 2018
  • In this paper, proposed a multi-channel charging control strategy for electric vehicle. This control strategy can adjust the charging power according to the calculated state-of-charge (SOC). Electric vehicle (EV) charging system using Particle Swarm Optimization (PSO) algorithm is proposed. A stochastic optimization algorithm technique such as PSO in the time-of-use (TOU) price used for the energy cost minimization. Simulation results show that the energy cost can be reduced using proposed method.

The Mass Production Weapon System Environmental Stress-Screening Test Design Method based on Cost-effective-Optimization (비용 효과도 최적화 기반 양산 무기체계 환경 부하 선별 시험 설계 방법)

  • Kim, Jangeun
    • Journal of Applied Reliability
    • /
    • v.18 no.3
    • /
    • pp.229-239
    • /
    • 2018
  • Purpose: There is a difficulty in Environmental Stress Screening (ESS) test design for weapon system's electrical/electronic components/products in small and medium-sized enterprises. To overcome this difficulty, I propose an easy ESS test design approach algorithm that is optimized with only one environment tolerance design information parameter (${\Delta}T$). Methods: To propose the mass production weapon system ESS test design for cost-effective optimization, I define an optimum cost-effective mathematical model ESS test algorithm model based on modified MIL-HDBK-344, MIL-HDBK-2164 and DTIC Technical Report 2477. Results: I clearly confirmed and obtained the quantitative data of ESS effectiveness and cost optimization along our ESS test design algorithm through the practical case. I will expect that proposed ESS test method is used for ESS process improvement activity and cost cutting of mass production weapon system manufacturing cost in small and medium-sized enterprises. Conclusion: In order to compare the effectiveness of the proposed algorithm, I compared the effectiveness of the existing ESS test and the proposed algorithm ESS test based on the existing weapon system circuit card assembly for signal processing. As a result of the comparison, it was confirmed that the test time was reduced from 573.0 minutes to 517.2minutes (9.74% less than existing test time).

Optimization Algorithm for Real-time Load Dispatch Problem Using Shut-off and Swap Method (발전정지와 교환방법을 적용한 실시간급전문제 최적화 알고리즘)

  • Lee, Sang-Un
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.17 no.4
    • /
    • pp.219-224
    • /
    • 2017
  • In facing the lack of a deterministic algorithm for economic load dispatch optimization problem, only non-deterministic heuristic algorithms have been suggested. Worse still, there is a near deficiency of research devoted to real-time load dispatch optimization algorithm. In this paper, therefore, I devise a shut-off and swap algorithm to solve real-time load dispatch optimization problem. With this algorithm in place, generators with maximum cost-per-unit generation power are to be shut off. The proposed shut-off criteria use only quadratic function in power generation cost function without valve effect nonlinear absolute function. When applied to the most prevalent economic load dispatch benchmark data, the proposed algorithm is proven to largely reduce the power cost of known algorithms.

Internet Shopping Optimization Problem With Delivery Constraints

  • Chung, Ji-Bok
    • Journal of Distribution Science
    • /
    • v.15 no.2
    • /
    • pp.15-20
    • /
    • 2017
  • Purpose - This paper aims to suggest a delivery constrained internet shopping optimization problem (DISOP) which must be solved for online recommendation system to provide a customized service considering cost and delivery conditions at the same time. Research design, data, and methodology - To solve a (DISOP), we propose a multi-objective formulation and a solution approach. By using a commercial optimization software (LINDO), a (DISOP) can be solved iteratively and a pareto optimal set can be calculated for real-sized problem. Results - We propose a new research problem which is different with internet shopping optimization problem since our problem considers not only the purchasing cost but also delivery conditions at the same time. Furthermore, we suggest a multi-objective mathematical formulation for our research problem and provide a solution approach to get a pareto optimal set by using numerical example. Conclusions - This paper proposes a multi-objective optimization problem to solve internet shopping optimization problem with delivery constraint and a solution approach to get a pareto optimal set. The results of research will contribute to develop a customized comparison and recommendation system to help more easy and smart online shopping service.