• Title/Summary/Keyword: Time-Based-Maintenance

Search Result 1,282, Processing Time 0.025 seconds

Study of Reliability Analysis Based Power Generation Facilities Maintenance System - Focused on Continuous Ship Unloader - (신뢰성 분석 기반 발전설비 점검계획 수립 시스템 연구- 석탄 하역기를 중심으로 -)

  • Hwang Seong Hwan;Kim Yu Rim;Kang Sung Woo
    • Journal of Korean Society for Quality Management
    • /
    • v.51 no.2
    • /
    • pp.315-327
    • /
    • 2023
  • Purpose: Recently, research has continued to predict the time of failure of the facility through measurement data obtained by attaching a sensor to the facility. However, depending on the facility, it may be difficult to attach a sensor. The purpose of this study is to propose a power generation maintenance plan system based on failure record data obtained from Continuous Ship Unloader, one of the facilities that is difficult to attach sensors. Methods: This study uses data collected from 2012 to 2022 from the 'CSU-1B' model among Continuous Ship Unloader operated by Korea Midland Power Co., LTD. By fitting fault record data to the Weibull distribution, appropriate maintenance cycles and ranges for each target facility subsystem are derived. In addition, maintenance group between subsystems is selected through Euclidean distance, a metric often used for time series data similarity. Through this, a system for establishing an maintenance plan for power generation facilities is proposed. Results: The results of this study are as follows. For the 17 subsystems of the Continuous Ship Unloader, proper maintenance cycles and ranges were determined, and a total of four maintenance groups were chosen. This resulted in the creation of an power generation maintenance plan system and the establishment of an maintenance plan. Conclusion: This study is a case study of power generation facilities. We proposed a maintenance plan system for Continuous Ship Unloader among power generation facilities.

Condition-Based Model for Preventive Maintenance of Armor Units of Rubble-Mound Breakwaters using Stochastic Process (추계학적 확률과정을 이용한 경사제 피복재의 예방적 유지관리를 위한 조건기반모형)

  • Lee, Cheol-Eung
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.28 no.4
    • /
    • pp.191-201
    • /
    • 2016
  • A stochastic process has been used to develop a condition-based model for preventive maintenance of armor units of rubble-mound breakwaters that can make a decision the optimal interval at which some repair actions should be performed under the perfect maintenance. The proposed cost model in this paper based on renewal reward process can take account of the interest rate, also consider the unplanned maintenance cost which has been treated like a constant in the previous studies to be a time-dependent random variable. A function for the unplanned maintenance cost has been mathematically proposed so that the cumulative damage, serviceability limit and importance of structure can be taken into account, by which a age-based maintenance can be extended to a condition-based maintenance straightforwardly. The coefficients involved in the function can also be properly estimated using a method expressed in this paper. Two stochastic processes, Wiener process and gamma process have been applied to armor stones of rubble-mound breakwaters. By evaluating the expected total cost rate as a function of time for various serviceability limits, interest rates and importances of structure, the optimal period of preventive maintenance can easily determined through the minimization of the expected total cost rate. For a fixed serviceability limit, it shows that the optimal period has been delayed while the interest rate increases, so that the expected total cost rate has become lower. In addition, the gamma process tends to estimate the optimal period more conservatively than the Wiener process. Finally, it is found that the more crucial the level of importance of structure becomes, the more often preventive maintenances should be carried out.

Optimization of Generator Maintenance Scheduling with Consideration on the Equivalent Operation Hours

  • Han, Sangheon;Kim, Hyoungtae;Lee, Sungwoo;Kim, Wook
    • Journal of Electrical Engineering and Technology
    • /
    • v.11 no.2
    • /
    • pp.338-346
    • /
    • 2016
  • In order for the optimal solution of generators’ annual maintenance scheduling to be applicable to the actual power system it is crucial to incorporate the constraints related to the equivalent operation hours (EOHs) in the optimization model. However, most of the existing researches on the optimal maintenance scheduling are based on the assumption that the maintenances are to be performed periodically regardless of the operation hours. It is mainly because the computation time to calculate EOHs increases exponentially as the number of generators becomes larger. In this paper an efficient algorithm based on demand grouping method is proposed to calculate the approximate EOHs in an acceptable computation time. The method to calculate the approximate EOHs is incorporated into the optimization model for the maintenance scheduling with consideration on the EOHs of generators. The proposed method is successfully applied to the actual Korean power system and shows significant improvement when compared to the result of the maintenance scheduling algorithm without consideration on EOHs.

Optimal Road Maintenance Section Selection Using Mixed Integer Programming (혼합정수계획법을 활용한 도로포장 보수구간 선정 최적화 연구)

  • Cho, Geonyoung;Lim, Heejong
    • International Journal of Highway Engineering
    • /
    • v.19 no.3
    • /
    • pp.65-70
    • /
    • 2017
  • PURPOSES : Pavement Management System contains the data that describe the condition of the road. Under limited budget, the data can be utilized for efficient plans. The objective of this research is to develop a mixed integer program model that maximizes remaining durable years (or Lane-Kilometer-Years) in road maintenance planning. METHODS : An optimization model based on a mixed integer program is developed. The model selects a cluster of sectors that are adjacent to each other according to the road condition. The model also considers constraints required by the Seoul Metropolitan Facilities Management Corporation. They select two lanes at most not to block the traffic and limit the number of sectors for one-time construction to finish the work in given time. We incorporate variable cost constraints. As the model selects more sectors, the unit cost of the construction becomes smaller. The optimal choice of the number of sectors is implemented using piecewise linear constraints. RESULTS : Data (SPI) collected from Pavement Management System managed by Seoul Metropolitan City are fed into the model. Based on the data and the model, the optimal maintenance plans are established. Some of the optimal plans cannot be generated directly in existing heuristic approach or by human intuition. CONCLUSIONS:The mathematical model using actual data generates the optimal maintenance plans.

A Study on the Maintenance Data Analysis of Vehicle Parts of Yongin Light Rail and Condition-Based Prediction Maintenance (용인경전철 차량부품 정비 데이터 분석 및 상태기반 예지 유지보수 방안 연구)

  • Lee, Kyeong Ho;Lee, Joong Yoon;Kim, Yeong Min
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.18 no.1
    • /
    • pp.1-13
    • /
    • 2022
  • The Yongin Light Rail train was manufactured by Bombardier Transportation in Canada in 2008 and is a privately invested railway line that has been operating in Yongin-si, Gyeonggi-do, since 2013. When the frequency of train failure increases due to aging, and there is a delay in the delivery period of imported parts used in the Bombardier manufactured trains, timely vehicle maintenance may not be performed due to lack of parts. To solve this problem, it is necessary to build a 'vehicle parts maintenance demand forecasting system' that analyzes the accurate and actual maintenance demand annual based on the condition of vehicle parts. The full scope of analysis in this paper analyzes failure data from various angles after opening of Yongin light rail vehicle to analyze failure patterns for each part and identify replacement cycles according to possible failures and consumption of parts. Based on this study, it is expected that Yongin Light Rail's maintenance system will change from the existing time-based replacement (TBM) concept to the condition-based maintenance (CBM) concept. It is expected that this study will improve the efficiency of the Yongin Light Rail maintenance system and increase vehicle availability. This paper is a fundamental for establishing of a system for predicting the replacement timing of vehicle parts for Yongin Light Rail. It reports the results of data analysis on some vehicle parts.

Optimal Maintenance Cycle for Aviation Oil Testing Equipment under the Consideration of Operational Environment (운용환경을 고려한 항공오일시험장비의 최적정비주기 설정)

  • Kim, In Seok;Jung, Won
    • Journal of Applied Reliability
    • /
    • v.16 no.3
    • /
    • pp.224-230
    • /
    • 2016
  • Purpose: Military maintenance involves corrective and preventive actions carried out to keep a system in or restore it to a predetermined condition. This research develops an optimal maintenance cycle for aviation oil testing equipment with acceptable reliability level and minimum maintenance cost. Methods: The optimal maintenance policy in this research aims to satisfy the desired reliability level at the lowest cost. We assume that the failure process of equipment follows the power law non-homogeneous Poisson process model and the maintenance system is a minimal repair policy. Estimation and other statistical procedures (trend test and goodness of fit test) are given for this model. Results: With time varying failure rate, we developed reliability-based maintenance cost optimization model. This model will reduce the ownership cost through adopting a proactive reliability focused maintenance system. Conclusion: Based on the analysis, it is recommended to increase the current maintenance cycle by three times which is 0.5 year to 1.5 years. Because of the system's built-in self-checking features, it is not expected to have any problems of preventative maintenance cycle.

Development Strategies and Feasibility Evaluation of Maintenance Operation System for Railway Bridge Based on Ubiquitous-BIM Technology (Ubiquitous-BIM 기술 기반의 철도교량 유지관리 운영체계 구축 전략 및 타당성 평가)

  • Moon, Hyoun-Seok;Kim, Hyeon-Seung;Kang, Leen-Seok
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.5
    • /
    • pp.459-466
    • /
    • 2012
  • Due to the issues such as omission of data, document based management, maintenance based on measurement data and wire-based network, it is difficult existing maintenance system for railway bridges to act to diverse characteristics of site and environmental changes in real time. With these reasons, there are many constraints in establishing active maintenance strategies for railway bridges. To solve these issues, this study suggests an integrated maintenance business model based on practical utilization and information management based on BIM technology to build a smart maintenance operation system based on ubiquitous computing for railway bridges. To secure its development and practical applications, a quantitative evaluation by questionnaire analysis was performed. Therefore, it is expected that the suggested model will be utilized as a framework model in order to build the smart maintenance operation system from collection of maintenance data to action for railway bridges.

Development of CMMS for the real-time CBMS (CMMS(Computerized Maintenance Management System)의 실 시간적인 CBMS(Condition Based Maintenance System) 연구)

  • 박주식;박재현;강경식;이광배
    • Journal of the Korea Safety Management & Science
    • /
    • v.2 no.4
    • /
    • pp.1-8
    • /
    • 2000
  • Equipment and machine of industrial plant are give effect to mechanical-stress of many working-stop or long time operating. Therefore, to be old and decrepit of every king of equipment. As long time operating equipment period into increase conservation and of repair equipment time is efficacious necessity of utility factor gradually that of productivity of diminution and complete equipment expense of increase. Conservation at special skill working and necessity is that will effectually and complete a period prevention management diagnosis can conservation point at issues at in advance.

  • PDF

Case Study for Development of Maintenance System for Equipment of LNG-FPSO Topside (LNG-FPSO Topside 장비를 위한 보전시스템 개발을 위한 사례 연구)

  • Lee, Soon-Sup;Kim, Jong-Wang
    • Journal of Ocean Engineering and Technology
    • /
    • v.28 no.6
    • /
    • pp.533-539
    • /
    • 2014
  • A maintenance system for an offshore plant uses an optimal maintenance method, process, and period based on operation information data and economic evaluation techniques. Maintenance is performed after one or more indicators show that equipment is going to fail or that equipment performance is deteriorating. A maintenance system is based on the use of real-time data to prioritize and optimize the LNG-FPSO topside equipment resources.

THE RIGHT TIME AND RIGHT BUDGET TO MAINTAIN THE COMPONENTS OF BRIDGE

  • H. Ping Tserng;Chin-Lung Chung
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.810-819
    • /
    • 2007
  • Usually the status of a bridge is determined by its structural capability and material strength. Consequently a lot of researchers have studied the failure, the fatigue, and the deterioration of the structure in terms of the structural function of a bridge. However, the overall performance of a bridge may be affected simply by the damage of one of its components. Therefore this study utilized a systematic classification and statistical analysis based on the existing bridge inspection data collected in Taiwan to reach the following goals: (1) assess the performance distribution and deterioration rate for bearing and expansion joint of bridge; (2) find out the right time to do the preventive and essential maintenance for the component of bridge with an empirical method, and to decide what time and which component of a bridge will receive preventive maintenance or regular maintenance.

  • PDF