1 |
H.K. Kim, H. Lee, J.H. Jang, S.K. Ro (2007) Development of Field-Measured Data-based Analysis Model of a Suspension Bridge, Journal of Korean Society of Civil Engineers, 27(6A), pp. 829-836.
|
2 |
S.W. Yoon, S.Y. Chin (2011) An RFID and BIM based Simulator for Construction Material Logistics and Progress Management, Journal of Korea Institute of Construction Engineering and Management, 12(5), pp. 46-54.
DOI
ScienceOn
|
3 |
K.T. Kim (2010) Development of a USN-Based Monitoring Scenario for Slope Failures, Journal of Korea Institute of Construction Engineering and Management, 11(6), pp. 122-130.
DOI
|
4 |
S.W. Moon, S.M. Hong (2007) Application of a RFID-Based Monitoring System for the Concrete Pour Process, Journal of Korea Institute of Construction Engineering and Management, 8(3), pp. 142-149.
|
5 |
S.W. Moon, H.J. Seong (2011) u-Disaster Prevention System based Real-Time Fire Monitoring in a Building Facility, Journal of Korea Institute of Construction Engineering and Management, 12(1), pp. 107-114
DOI
ScienceOn
|
6 |
S.Y. Chin, S.W. Yoon, C.H. Choi, C.Y. Cho (2008) RFID+4D CAD for Progress Management of Structural Steel Works in High-Rise Buildings, Journal of Computing in Civil Engineering, 22(2), pp. 74-89.
DOI
ScienceOn
|
7 |
H.S. Moon (2006) Frameworks of Advanced Model for Bridge Maintenance Information System by using Ubiquitous Information Technology, Dept. of Civil Engineering Gyeongsang National University, Master's Thesis.
|
8 |
L.S. Kang, H.S. Moon, and J.M. Kwak (2007) Procedure Development for Organizing Electronic Technical Manual of Construction Design Information and Applicability Analysis for Practical Project, Journal of The Korean Society for Railway, 10(2), pp. 102-111.
|