DOI QR코드

DOI QR Code

Development Strategies and Feasibility Evaluation of Maintenance Operation System for Railway Bridge Based on Ubiquitous-BIM Technology

Ubiquitous-BIM 기술 기반의 철도교량 유지관리 운영체계 구축 전략 및 타당성 평가

  • Moon, Hyoun-Seok (Department of Civil Engineering, Gyeongsang National University) ;
  • Kim, Hyeon-Seung (Department of Civil Engineering, Gyeongsang National University) ;
  • Kang, Leen-Seok (Department of Civil Engineering, Engineering Research Institute, Gyeongsang National University)
  • Received : 2011.10.27
  • Accepted : 2012.08.18
  • Published : 2012.10.30

Abstract

Due to the issues such as omission of data, document based management, maintenance based on measurement data and wire-based network, it is difficult existing maintenance system for railway bridges to act to diverse characteristics of site and environmental changes in real time. With these reasons, there are many constraints in establishing active maintenance strategies for railway bridges. To solve these issues, this study suggests an integrated maintenance business model based on practical utilization and information management based on BIM technology to build a smart maintenance operation system based on ubiquitous computing for railway bridges. To secure its development and practical applications, a quantitative evaluation by questionnaire analysis was performed. Therefore, it is expected that the suggested model will be utilized as a framework model in order to build the smart maintenance operation system from collection of maintenance data to action for railway bridges.

기존의 철도교량 유지관리체계는 주로 정보누락, 문서위주 관리 및 유선기반의 정보수집 등으로 인하여 다양한 현장의 환경변화에 실시간 대응이 곤란하여 능동적인 철도교량 유지관리 전략 수립에 제약을 갖고 있다. 본 연구에서는 유비쿼터스 기반의 철도교량 유지관리 정보운용체계 구축을 위한 실무 활용모형과 건설 생애주기의 통합 정보관리체계인 BIM (Building Information Modeling) 개념을 적용하여 유지관리 통합 운용모형을 제안하고 있다. 이의 개발 및 실무적 적용의 타당성 확보를 위해 설문분석에 의한 정량적 평가를 수행하였다. 최근 철도교량의 지능형 유지관리 운영체계가 확대될 것을 고려하면, 본 연구의 제안사항은 운영체계 구축을 위한 통합 프레임워크로 활용될 수 있을 것이다.

Keywords

References

  1. H.K. Kim, H. Lee, J.H. Jang, S.K. Ro (2007) Development of Field-Measured Data-based Analysis Model of a Suspension Bridge, Journal of Korean Society of Civil Engineers, 27(6A), pp. 829-836.
  2. S.W. Yoon, S.Y. Chin (2011) An RFID and BIM based Simulator for Construction Material Logistics and Progress Management, Journal of Korea Institute of Construction Engineering and Management, 12(5), pp. 46-54. https://doi.org/10.6106/KJCEM.2011.12.5.46
  3. K.T. Kim (2010) Development of a USN-Based Monitoring Scenario for Slope Failures, Journal of Korea Institute of Construction Engineering and Management, 11(6), pp. 122-130. https://doi.org/10.6106/KJCEM.2010.11.6.122
  4. S.W. Moon, S.M. Hong (2007) Application of a RFID-Based Monitoring System for the Concrete Pour Process, Journal of Korea Institute of Construction Engineering and Management, 8(3), pp. 142-149.
  5. S.W. Moon, H.J. Seong (2011) u-Disaster Prevention System based Real-Time Fire Monitoring in a Building Facility, Journal of Korea Institute of Construction Engineering and Management, 12(1), pp. 107-114 https://doi.org/10.6106/KJCEM.2011.12.1.107
  6. S.Y. Chin, S.W. Yoon, C.H. Choi, C.Y. Cho (2008) RFID+4D CAD for Progress Management of Structural Steel Works in High-Rise Buildings, Journal of Computing in Civil Engineering, 22(2), pp. 74-89. https://doi.org/10.1061/(ASCE)0887-3801(2008)22:2(74)
  7. H.S. Moon (2006) Frameworks of Advanced Model for Bridge Maintenance Information System by using Ubiquitous Information Technology, Dept. of Civil Engineering Gyeongsang National University, Master's Thesis.
  8. L.S. Kang, H.S. Moon, and J.M. Kwak (2007) Procedure Development for Organizing Electronic Technical Manual of Construction Design Information and Applicability Analysis for Practical Project, Journal of The Korean Society for Railway, 10(2), pp. 102-111.