• Title/Summary/Keyword: Time plan

Search Result 3,755, Processing Time 0.032 seconds

Analyzing the Influence of Policy Measures for Growth Management Plan (성장관리방안 정책수단의 영향력 분석)

  • Jeon, Byung-Chang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.3
    • /
    • pp.253-268
    • /
    • 2020
  • This study examined the effectiveness of policy measures in a growth management plan by analyzing empirically the influence of regulations and incentives in a non-urban growth management plan of Sejong City using the binomial logistic model. The parcel unit data related development location of Sejong City from 2012 to 2017 was used in the model. The analysis showed that time regulation in the growth management plan has a negative (-) impact on the spread of development, which means it is effective in slowing urban sprawl by lowering the profits of developers. The time regulation applied in Sejong City needs to be used actively in other cities in Korea to prevent urban sprawl. Nevertheless, floor ratio incentives had no influence in inducing development within the growth management area, which means a new incentive policy to meet the local characteristics is needed to strengthen the effectiveness of the growth management plan. This study is meaningful because it attempted an empirical analysis of the effects of the growth management plan at The National Territory Act, and this study could encourage further studies.

A Study on the Deterioration Patterns of Building Components in the Rental Apartment Housing (임대공동주택 구성재의 열화도 패턴에 관한 연구)

  • Lee Kang-Hee
    • Journal of the Korean housing association
    • /
    • v.17 no.4
    • /
    • pp.65-72
    • /
    • 2006
  • Most of buildings have been deteriorated with time-elapse by reflection of the building location, material, environmental circumstances and so on. The performance would go down and be demolished if anything could not be done after constructed. The maintenance should be required to preserve a decent living condition or improve a inferior condition by various plans and practices. The maintenance plan needs various data such as a repair scope, a repair time, a forecasted cost, a plan of management and so forth. Among the above required data for planning the maintenance, the deterioration characteristics of the building components would be first analyzed. The deterioration pattern would be a key role to affect and make a maintenance plan. In this paper, it aimed at classifying the deterioration patterns of building components. A deterioration pattern would be analyzed between the cumulative repair cost and time-elapse and modeled with these relations. A deterioration patterns are classified into 4 types-a accelerated type, a straight type, a temporary type and a slowly type. As a result of this research, a accelerated type includes window, window frame, general paintings, general water proofing in building components. A straight type includes the lacquer paintings, furnishings in building components and water supply pipe, boiler, sanitaries in mechanical facilities and lighting in electric facilities. Based on these research results, further study should be conducted to include any other components and an estimating model.

Knowledge Acquisition and Application for Scheduling Expert System of Highrise Buildings (HRB Expert 구축을 위한 지식의 획득과 활용)

  • Hong Young-Tak;Yu Jung-Ho;Lim Gyeong-Ho;Lee Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.2 s.24
    • /
    • pp.92-101
    • /
    • 2005
  • The duration of highrise building projects is more shorter than its increasing of the numbers of floors. The project is liable to overrun of the time in which the project must be complete. AS highrise buildings are increased, time management has been reorganized as critical success factor. To improve time management, time management softwares are introduced and the software's education is made lively in construction company. However a large amount of time management works still have been based on not the software but scheduler's experience. We often can find the time overrun risk of highrise building because of the shortage of scheduler's experience. To diminish the mistake of the scheduler who does not have much experience, we suggested HRB Expert which uses expert's knowledge to make the time plan of highrise building. We made an example of knowledge acquiring and knowledge usage which cased on reinforced concrete work of highrise building by literature review and interview with scheduling expert. The precision of time plan will be enhanced and time overrun will be prevented on condition that HRB Expert is constructed and used

Design and Implementation of Lesson Plan System for teacher-student based on XML (XML 기반 교수-학생 학습지도 시스템의 설계 및 구현)

  • Choi, Mun-Kyoung;Kim, Haeng-Kon
    • The KIPS Transactions:PartD
    • /
    • v.9D no.6
    • /
    • pp.1055-1062
    • /
    • 2002
  • Recently, the lesson plan document that is imported in the educational area is not provided to the educational information systematically, and the teachers are not easy to compose the lessen plan documentation. So, it needs additional time and effort to develope the lesson plan documents. Because of increasing the distributing network. web-based lesson plan system is required to all of the education area. Therefore, we need to compose the lesson plan that is possible to obtain the various teacher's requirement by providing creation, retrival, and reusability of document using the standard XML on web. In this paper, we developed the system for creating the common DTD (Document Type Definition), providing the standard XML document through the common DTD over the lesson plan analysis. In this system, it provides the editor to compose the lesson plan and supports the searching function to improvement of reusability on the existing lesson plan. We design the searching functions such as the structure base, facet and keyword. The composed lesson plans are interoperated with Database. Consequently, we can share the information on web by composing the lesson plan using the XML and save the time and cost by directly writing the lesson plan on web. We can also provide the improved learning environment.

Developing the Disaster Plan for Materials in Library (도서관 장서를 위한 재난대책 수립)

  • 방준필
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • v.8 no.1
    • /
    • pp.135-155
    • /
    • 1997
  • The purpose of this study Is to recommand all kinds of library in Korea to develop a disaster plan. The materials in the library are apt to get damaged at once by such disasters as fire or flood etc. It is fortunate that we Have not found any big disaster at libraries in Korean. considering many cases of big disaster which distroy materials at library in foreign countries. In spite of the posibility of disaster any time, that will make librry loss of function, there are no library that have a disaster plan in Korea. Disaster plan is a guidance by which materials are conserved at ordinary times, protected and recoverd in contingency. It consists by four elements: prevention, preparedness, reaction and recovery. As libraries function by biblogrophic data and user data in automation system, it is also recommended to prepare system protection in the disaster plan.

  • PDF

Optimization of Train Working Plan based on Multiobjective Bi-level Programming Model

  • Hai, Xiaowei;Zhao, Chanchan
    • Journal of Information Processing Systems
    • /
    • v.14 no.2
    • /
    • pp.487-498
    • /
    • 2018
  • The purpose of the high-speed railway construction is to better satisfy passenger travel demands. Accordingly, the design of the train working plan must also take a full account of the interests of passengers. Aiming at problems, such as the complex transport organization and different speed trains coexisting, combined with the existing research on the train working plan optimization model, the multiobjective bi-level programming model of the high-speed railway passenger train working plan was established. This model considers the interests of passengers as the center and also takes into account the interests of railway transport enterprises. Specifically, passenger travel cost and travel time minimizations are both considered as the objectives of upper-level programming, whereas railway enterprise profit maximization is regarded as the objective of the lower-level programming. The model solution algorithm based on genetic algorithm was proposed. Through an example analysis, the feasibility and rationality of the model and algorithm were proved.

Estimation of minimum food expenditure by computer program and its application in meal management (전산프로그램을 이용한 경제적식품구입비 산출 및 식생활관리에의 이용연구)

  • 최혜미
    • Journal of the Korean Home Economics Association
    • /
    • v.29 no.3
    • /
    • pp.35-45
    • /
    • 1991
  • This study was to calculate the minimum food expenditure by using OR linear program, and to determine the food plans for different income values based on the recommenced dietary allowances(RDA) for Koreans. VAX 11/780 system was used in this study. There were 6 family models-single man, single woman, married couple, couple with one child, couple with 2 children and couple with 2 children & grandmother. The market price quoted in this study was from July 1989 to June 1990 and the data file was made from RDA & food composition tables. After the minimum food expenditure was calculated from the computer, the low cost food plan was set. From the low cost food plan, we set the moderate cost food plan 25% above the low cost and the liberal food plan 50% above the low cost. One week menu was planned for different food plans. The low cost food plan could be used not only at the institutional levels and at home but also used at the national food policy making for scientific budget planning and for nutritionally well balanced diet. These food plans could control the use of time and efforts, too.

  • PDF

Activation Plan of Korean Speleology Society (한국동굴학회의 활성화 방안)

  • Yoon, Jung-Mo
    • Journal of the Speleological Society of Korea
    • /
    • no.84
    • /
    • pp.22-30
    • /
    • 2008
  • With activation plan of Speleological Society of Korean like home page of Speleological Society of Japan cave crane information, caving information, cave Q/A, cave publication, the relation site back the possibility of seeing information regarding the cave which is various in order to be, it reorganizes. The possibility of coming in contact in order to be, various branch information also the general rain specialist regarding the cave resources. Currently the possibility of seeing the various branch data for the application of the cave resources at any time it is, home page of Speleological Society of Korean the possibility of doing to lead in order to be, it proposes the plan. From one person it will be able to study the data regarding the cave of various field in order, all curricular materials regarding the cave resources the educational program which leads a home page about under developing it proposes the activation plan of the cave resources.

LEARNING FROM THE SOUTH KOREAN RISK MANAGEMENT PLAN FOR THE SHIPBUILDING INDUSTRY DURING THE DIFFICULT 2004-2005 YEARS

  • Seng-Kiong Ting;Mengqiong Wang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.990-994
    • /
    • 2009
  • With the world in financial recession, the general trend of global trade is declining. As a result, the world leading shipbuilding industries are confronted with an even more difficult task of mitigating various risks associated with the industries. How well the three shipbuilding industries, Japan, Korea and China, can adapt and manage the risks will be crucial. As the youngest of the top three, the Chinese industry faces greater risks. As it happens to share many factors with that of South Korea in 2004-2005, it is necessary to review and evaluate the risk management plan used by South Korea. This paper presents an evaluation of the risk management plan for shipbuilding industry in South Korea during 2004-2005, considering the financial and political environments at that time. This will help us to structure a plan of risk management for the future.

  • PDF

Economic Reliability Group Acceptance Sampling Based on Truncated Life Tests Using Pareto Distribution of the Second Kind

  • Aslam, Muhammad;Mughal, Abdur Razzaque;Hanif, Muhammad;Ahmad, Munir
    • Communications for Statistical Applications and Methods
    • /
    • v.17 no.5
    • /
    • pp.725-731
    • /
    • 2010
  • Economic Reliability test plans(ERTP) are proposed considering that the life time of the submitted items follow the Pareto distribution of the second kind. For various specified acceptance number, sample size and producer's risk, a minimum test termination time is obtained. A comparison of proposed plan has been made with the existing plan developed by Aslam et al. (2010). The results are explained by tables and example.