• Title/Summary/Keyword: Time Budget

Search Result 788, Processing Time 0.029 seconds

Link Budget Analysis of Communication System for Reliable WBAN (신뢰성있는 WBAN을 위한 통신 시스템의 링크 버짓 분석)

  • Roh, Jae-sung
    • Journal of Advanced Navigation Technology
    • /
    • v.23 no.6
    • /
    • pp.584-588
    • /
    • 2019
  • Wireless body area network (WBAN) is a networking technology that enables early detection of abnormal health conditions, real-time medical monitoring, and telemedicine support systems. The internet of things (IoT) for healthcare, which has become an issue recently, is one of the most promising areas for improving the quality of human life. It must meet the high QoS requirements of the medical communication system like any other communication system. Therefore, the bit error rate (BER) threshold was chosen to accommodate the QoS requirements of the WBAN communication system. In this paper, we calculated BER performance of WBAN channel using IR-UWB PPM modulation and analyzed link budget and system margin of WBAN according to various system parameters.

Multiobjective R&D Investment Planning under Uncertainty (불확실한 상황하에서의 다복적 R & D 투자계획수립에 관한 연구-최적화 기법과 계층화 분석과정의 통합접 접근방안을 중심으로-)

  • 이영찬;민재형
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.20 no.2
    • /
    • pp.39-60
    • /
    • 1995
  • In this paper, an integration of stochastic dynamic programming (SDP), integer goal programming (IGP) and analytic hierarchy process (AHP) is proposed to handle multiobjective-multicriteria sequential decision making problems under uncertainty inherent in R & D investment planning. SDP has its capability to handle problems which are sequential and stochastic. In the SDP model, the probabilities of the funding levels in any time period are generated using a subjective model which employs functional relationships among interrelated parameters, scenarios of future budget availability and subjective inputs elicited from a group of decision makers. The SDP model primarily yields an optimal investment planning policy considering the possibility that actual funding received may be less than anticipated one and thus the projects being selected under the anticipated budget would be interrupted. IGP is used to handle the multiobjective issues such as tradoff between economic benefit and technology accumulation level. Other managerial concerns related to the determination of the optimal project portifolio within each stage of the SDP model. including project selection, project scheduling and annual budget allocation are also determined by the IGP. AHP is proposed for generating scenario-based transformation probabilities under budgetary uncertainty and for quantifying the environmental risk to be considered.

  • PDF

A Method of Progress Management of Projects Based on Schedule for Small and Medium Enterprises (중소기업을 위한 일정 기반의 프로젝트 진도 관리 방안)

  • Oh, Joseph;Kim, Bo-Hyun;Baek, Jae-Yong;Jung, So-Young;Choi, Young-Jae
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.276-282
    • /
    • 2012
  • Earned value management(EVM) based progress management was designed to systematically manage large or huge projects with budget based criteria. For this reason, existed methods of EVM based progress management have a practical difficulty to apply to small and medium enterprises(SMEs) not possessing enough human resource, time, and cost. In other words, SMEs have performed simultaneously many small-sized projects emphasizing more project delivery than project budget. This study focuses on the area of project management applying to many small-sized projects simultaneously conducted by SMEs. Thus, the method proposed in this study is to manage only the progress of projects after removing cost factor in order to reduce man powers required for allocating the budget of projects to their all activities in detail in the stage of project planning. This study reveals that SMEs are able to manage progress of many projects easily and intuitively using the proposed method.

An Approximation Approach for Solving a Continuous Review Inventory System Considering Service Cost (서비스 비용을 고려한 연속적 재고관리시스템 해결을 위한 근사법)

  • Lee, Dongju;Lee, Chang-Yong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.2
    • /
    • pp.40-46
    • /
    • 2015
  • The modular assembly system can make it possible for the variety of products to be assembled in a short lead time. In this system, necessary components are assembled to optional components tailor to customers' orders. Budget for inventory investments composed of inventory and purchasing costs are practically limited and the purchasing cost is often paid when an order is arrived. Service cost is assumed to be proportional to service level and it is included in budget constraint. We develop a heuristic procedure to find a good solution for a continuous review inventory system of the modular assembly system with a budget constraint. A regression analysis using a quadratic function based on the exponential function is applied to the cumulative density function of a normal distribution. With the regression result, an efficient heuristics is proposed by using an approximation for some complex functions that are composed of exponential functions only. A simple problem is introduced to illustrate the proposed heuristics.

Domestic Government Debt and Economic Growth in Indonesia: An empirical analysis

  • Bukit, Alexander Romarino;Anggraeni, Lukytawati
    • The Journal of Economics, Marketing and Management
    • /
    • v.5 no.1
    • /
    • pp.27-37
    • /
    • 2017
  • Domestic government debt securities is one of the steps which is taken by the government of Indonesia as a major source of financial budget, covering for the budget deficit, debt payments and interest debt. The purposes of this research are to know the development of budget deficits, government debt and impact of domestic government debt securities against economic growth in Indonesia. Method of analysis used Ordinary Least Squares (OLS) analyzing the impact of the domestic debt against economic growth in Indonesia. This research uses time series data from 1997 to 2014. Total government debt and domestic government debt securities in Indonesia increased during the last five years. The average of domestic government securities was above 50 percent of the total government debt. Estimated results showed domestic government debt securities has a positive and significant effect to economic growth. Official development assistance (ODA) has a negative effect to economic growth. Other variables such as the gross fixed capital formation and receipt of remittance have positive and significant effect, total imports and government expenditure have negative and significant effect against economic growth.

A Determination of the Optimal Replace Time of Equipment in the FMS Design (FMS의 최적구성에 따른 설비교체 시점의 결정)

  • 이동춘;신현재
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.14 no.24
    • /
    • pp.163-168
    • /
    • 1991
  • In the FMS design, the important points are the selection of parts and the determination of configuration. The common approach method which solve the selection of parts are the determination of configuration has improved that the two points are simultaneously. This study finds the best method which parts combination and configuration are satisfied at the same time. And the optimal replace time of equipment under limited budget on the view Point of engineering. economy.

  • PDF

A Study on the Effectiveness of Inter-temporal Reallocation of Fiscal Expenditure in Korea (재정지출의 시점 간 재원배분 조정에 따른 경기조절 효과성에 관한 연구)

  • Kim, SeongTae;Hur, Seok-Kyun
    • KDI Journal of Economic Policy
    • /
    • v.35 no.2
    • /
    • pp.71-105
    • /
    • 2013
  • Now that fiscal soundness is increasingly important influenced by the euro area fiscal crisis, early budget execution has been under the spotlight as a tool for economy control, other than typical expansionary method, such as supplementary budget. Basically, early budget execution is a fiscal policy instrument that reponses to economic fluctuations through modifying the inter-temporal allocation of fiscal expenditure within budget, without affecting fiscal soundness. This study empirically examines how effective the intert-temporal reallocation of fiscal expenditure is in economy control. Using Korea's Consolidated Fiscal data, the size of inter-temporal reallocation of fiscal expenditure is defined as changes of fiscal expenditure for one year excluding seasonal factors and used to explain real economic growth rate, a dependent variable. The result shows that the macroeconomic effect of the inter-temporal reallocation turns out meaningful in general, though some policy time lag exists. Meanwhile, a simulation using macroeconomic model finds that overall effect on economic growth is not large because increase in fiscal expenditure allocation at a certain point of time is canceled by the opposite direction within the same fiscal year. However, the inter-temporal reallocation is found to reduce volatility of key macroeconomic variables so as to contribute to partially stabilizing macroeconomy. In particular, such effect of economic stabilization seems to be highly apparent at the time of financial crisis, but not very noticeable in normal economic cycle.

  • PDF

Sample Size Determination for O/D Estimation under Budget Constraint (예산제약하에서 O/D 추정을 위한 최소표본율 결정)

  • Sin, Hui-Cheol;Lee, Hyang-Suk
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.3 s.89
    • /
    • pp.7-15
    • /
    • 2006
  • A large sample can Provide more information about the Population. As the sample size Increases, analysts will be more confident about the survey results. On the other hand, the costs for survey will increase in time and manpower. Therefore, determination of the sample size is a trade-off between the required accuracy and the cost. In addition, permitted error and significance level should be considered. Sample size determination in surveys for O/D estimation is also connected with confidence of survey result. However, the past methods were usually too simple to consider confidence. Therefore, a new method for O/D surveys was Proposed and it was accurate enough, but it has too large sample size when we have current budget constraint. In this research, several minimum sample size determination methods for origin-destination survey under budget constraint were proposed. Each method decreased sample size, but has its own advantages. Selection of the sample size will depend on the study Purpose and budget constraint.

Comparison of Daily Soil Water Contents between Energy BalanceWater Budget Approach and TDR (에너지와 물수지 연계방법과 TDR로부터 얻어진 매일 토양 함수량의 비교)

  • 임창수
    • Water for future
    • /
    • v.29 no.4
    • /
    • pp.119-129
    • /
    • 1996
  • The daily soil water contents were obtained from the time domain reflectometry (TDR) method and energy balance-water budget approach with eddy correlation at the two small semiarid watersheds of Lucky Hills and Kendall during the summer rainy period. There was a comparison of daily soil water content measured and estimated from these two different approaches. The comparison is valuable to evaluate the accuracy of current soil water content measuring system using TDR and energy balance-water budget approach using eddy correlation method at small watersheed scale. The degree of similarity between the regressions of these two methods of measuring soil water content was explained by determining the correlations between these methods. Simple linear regression analyses showed that soil water content measured from TDR method was responsible for 58% and 63% of the variations estimated from energy balance-water budget approach with eddy correlation at Lucky Hills and Kendall, respectively. The scatter plots and the regression analyses revealed that two different approaches for soil water content measurement at small watershed scale have no significant difference.

  • PDF

Dissolved Nutrient Balance and Net Ecosystem Metabolism Using a Simple Box Model in Gamak Bay, Korea (Box Model을 이용한 가막만의 물질체류시간과 Net Ecosystem Metabolism)

  • Eom, Ki-Hyuk;Lee, Won-Chan;Park, Sung-Eun;Hong, Sok-Jin;Kim, Hyung-Chul;Cho, Yoon-Sik
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.14 no.4
    • /
    • pp.257-263
    • /
    • 2011
  • The budgets of fresh water, salt and nutrients were estimated in order to clarify the characteristics of material cycle in the Gamak Bay in 2006 with Simple Box budget Model. Outflow volume of freshwater into system was approximately $-174.2{\sim}72.5{\times}10^3m^3/day$. Inflow masses of DIP and DIN were approximately 397.0~1158 mole/day and 1750~8328 mole/day, respectively. The Source or sink of DIP was under the control of the variation of fresh water budget in the system. the mass balance and NEM was largely determined by flushing time of material.