• 제목/요약/키워드: Tie Switches

검색결과 22건 처리시간 0.02초

배전계통 운영의 중요요소들을 고려한 상시연계점 선정 종합 최적화 알고리즘 (Synthetically Optimal Tie Switches Selection Algorithm Considering Important Elements in Distribution Power System)

  • 김준호;임희택;유남철;임일형;최면송;이승재;하복남
    • 전기학회논문지
    • /
    • 제58권11호
    • /
    • pp.2079-2088
    • /
    • 2009
  • The optimal operation in distribution system is to select tie switches considering important elements(Load balance, Loss minimization, Voltage drop, Restoration index..) in distribution system. Optimal Tie Switches Selection is very important in operation of distribution system because that is closely related with efficiency and reliability. In this paper, a new algorithm considering important elements is proposed to find optimal location of tie switches. In the case study, the proposed algorithm has been testified using real distribution network of KEPCO for verifying algorithm and complex network for applying future distribution network.

손실감소를 위한 배전계통 재구성에 관한 연구 (A Study on Distribution Network Reconfiguration for Loss Reduction)

  • 김세호;최병윤;조시형;손인배;문영현
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1996년도 하계학술대회 논문집 B
    • /
    • pp.686-688
    • /
    • 1996
  • Network reconfiguration is performed by opening/closing two types of switches, tie and sectionalizing switches. A whole feeder, or part of a feeder, may be served from another feeder by closing a tie switch linking the two while an appropriate sectionalizing switch must be opened to maintain radial structures. In loss reduction, the problem is to identify tie and sectionalizing switches that should be closed and opened, respectively, to achieve a maximum loss reduction. In this paper, it is introduced to propose the reconfiguration plan for loss reduction by using the Civanlar's loss reduction formular.

  • PDF

배전자동화 시스템에서 전력설비 부하균등화를 고려한 피더간 연계점 최적위치선정 (A Method for Optimal Location of Feeder Tie Switches for Improving Equal Load of Electric Power Equipment in Distribution Automation System)

  • 임일형;임성일;최면송;이승재;신창훈;하복남
    • 전기학회논문지
    • /
    • 제56권5호
    • /
    • pp.821-828
    • /
    • 2007
  • This paper proposes a new algorithm to find optimal location of open switches connecting feeders in distribuion system. In order to enhance power system reliability by minimizing outage area in case of fault, the load balance among the facilities such as transformers and feeders is considered to optimize. The combination of optimal position of normal open switches can be found by moving tie along the direct path connecting two feeders related to the open switch while the whole optimization problem is separated into many small problems. The proposed algorithm is shown by case study results that, it is simple and takes short calculation time to apply to the DAS (Distribution Automation System) in KEPCO (Korea Electric Power Cooperation).

배전운영 시스템에서 상시개방 연계 스위치 투입에 의한 루프 운전 중 구간전압 계산 방법 (Section Voltage Calculation while a Loop Operation by Tie-Switch Close in a Distribution Management System)

  • 서정수;임일형;박종호;신용학;최면송
    • 전기학회논문지
    • /
    • 제65권3호
    • /
    • pp.397-403
    • /
    • 2016
  • Generally, an electrical distribution configuration is a radial system with one-way current in a distribution management system (DMS). All feeders in a DMS have tie-switches to make radial system. Sometimes, DMS should change a tie-switch for operation. In that case, the tie-switch has to be closed first; then a switch is opened as another tie-switch in order to prevent blackout for customers. At the moment when the tie-switch is closed, distribution system is operated in a loop state, not radial. Before the loop operation, DMS operator has to check any expected events for stable distribution system operation; and the most important event is a mis-operation of a protection relay. In addition, DMS operator should check voltage profile violation but a calculation method of section voltages had not been used. Thus, this paper proposes a calculation method of section voltages at a loop operation in a DMS. The proposed calculation algorithm is verified by Matlap Simulink.

국내 배전계통의 6분할 3연계 최적분할 모델 구성방안 (Optimal Division Model Configuration Plan According to 6 Divisions 3 Ties in Korea Distribution System)

  • 이대동;손성환;하복남;현동석;김영달
    • 전기학회논문지P
    • /
    • 제59권4호
    • /
    • pp.428-433
    • /
    • 2010
  • According as economy grows, demand for power increases and satisfaction of customer about electricity quality is rising. There is in trend that investment expense by continuously increased supply of electric power equipment is on the increase continuously, but management efficiency improvement through curtailment of supply of electric power equipment investment expense through efficient operation is required rather than to increase investment. In this study, reconsidered about 6 divisions 3 ties that is distribution line basis configuration of Daejeon Geumsan area and analyzed division and tie present condition of truthful distribution System. Examined problem analyzing average division number, tie number and tie switch number, searched about most suitable division that consider load. Hereafter, I wish to take advantage of analysis result in most suitable division and tie of truthful distribution system for power failure section reduction and investment expense curtailment.

개선된 선로교환 기법을 이용한 방사상 전력계통의 최적 라우팅 알고리즘의 적용 (An Application of the Optimal Routing Algorithm for Radial Power System using Improved Branch Exchange Technique)

  • 김병섭;신중린;박종배
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제51권6호
    • /
    • pp.302-310
    • /
    • 2002
  • This paper presents an application of a improved branch exchange (IBE) algorithm with a tie branch power (TBP) flow equation to solve the Optimal Routing problem for operation of a radial Power system including power distribution system. The main objective of the Optimal Routing problem usually is to minimize the network real power loss and to improve the voltage profile in the network. The new BE algorithm adopts newly designed methods which are composed by decision method of maximum loss reduction and new index of loss exchange in loop network Thus, the proposed algorithm in this paper can search the optimal topological structures of distribution feeders by changing the open/closed states of the sectionalizing and tie switches. The proposed algorithm has been evaluated with the practical IEEE 32, 69 bus test systems and KEPCO 148 bus test system to show favorable performance gained.

다중 프로세서 시스템에서 문맥교환을 줄이기 위한 변형된 LLF 스케줄링 알고리즘 (A Modified Least-Laxity First Scheduling Algorithm for Reducing Context Switches on Multiprocessor Systems)

  • 오성흔;길아라;양승민
    • 한국정보과학회논문지:시스템및이론
    • /
    • 제30권2호
    • /
    • pp.68-77
    • /
    • 2003
  • 최소 여유시간 우선(Least-Laxity First, LLF) 스케줄링 알고리즘은 작은 여유시간을 가진 태스크가 높은 우선순위를 갖는 스케줄링 알고리즘으로써 단일 프로세서 시스템에서 최적이고 다중 프로세서 시스템에서 준최적으로 증명되었다. 그러나 이 스케줄링 알고리즘은 여유시간 충돌이 발생하였을 때 태스크 간에 빈번한 문맥교환이 발생하게 되는 문제점이 있어 실용적이지 못하다. 본 논문에서는 과도한 문맥교환을 일으키는 LLF의 문제점을 해결하기 위해 다중 프로세서 시스템을 위한 MLLF/MP(Modified Least-Laxity First on Multiprocessor) 스케줄링 알고리즘을 제안한다. MLLF/MP는 태스크의 여유시간 역전이 발생하더라도 마감시간을 놓치지 않는 범위에서 태스크를 연속적으로 수행시킴으로써 빈번한 문맥교환이 발생하는 것을 방지한다. MLLF/MP 또한 다중 프로세서 시스템에서 준최적임을 증명한다. 모의 실험 결과를 통하여 MLLF/MP는 LLF보다 적은 스케줄링 오버헤드를 가짐을 보인다.

상시개방점 양단전압 측정값을 이용한 배전선로 루프운전 가능 여부 판단 방법 (Loop Current Calculation based on Voltage Angle Difference at Tie Switch for Switching Plan Validation in Distribution System Operation)

  • 손주환;임성일
    • 조명전기설비학회논문지
    • /
    • 제29권7호
    • /
    • pp.14-21
    • /
    • 2015
  • Distribution systems are operated in radial structure, but temporal loop structure could be founded the live load transfer. Main purposes of reconfiguration of distribution network are load balancing, loss minimization and voltage drop maintaining. In the loop structure, huge loop current can be flowed between two substations in case of large voltage angle difference. Protection devices of distribution line can be triped by this huge loop current. So, precise calculation of loop current is very important for secure switching. This paper proposes a novel calculation method of loop current using the voltage angle differences measured at the tie switches. Feasibility of the propose method has been verified by various case studies based on Matlab simulation.

배전선로 상시연계점 측정 전압 위상차를 이용한 변전소 모선 위상각 추정 방법 (Substation Bus Voltage Angle Calculation Method Using Voltage Angle Difference Measured at the Tie Switch in the Distribution Line)

  • 손주환;임성일
    • 전기학회논문지
    • /
    • 제65권1호
    • /
    • pp.9-15
    • /
    • 2016
  • Distribution networks are operated in radial fashion during the normal state. Loop configuration is also required temporally in case of live load transfer among the adjacent feeders. Voltage angles of each substation buses are very important data in order to calculate power flow of the loop structured distribution feeders. This paper proposes substation bus voltage angle calculation method using voltage angle difference measured at the normally open tie switches. Simulation case studies using Matlab simulink have been performed to establish feasibility of proposed method.

배전계통 리클로우저 기반의 자율적 고장복구 방법론 (The Self-Fault Restoration Methodology based on the Recloser in the Distribution Systems)

  • 고윤석
    • 전기학회논문지
    • /
    • 제58권9호
    • /
    • pp.1681-1688
    • /
    • 2009
  • This paper proposes a new fault restoration method which adopts the recloser as top agent to release the problems of the data concentration and fault processing delay of the existing DAS(distribution Automation System) under the ubiquitous distribution system. In proposed method, top agent collects the data based on the multi-casting communication with the tie switches of the interconnection point, and then selects a closed switch(tie switch) to transfer the sound outage load to other feeders based on the heuristic search strategy step by step until the load transfer work is finished. Here, a new heuristic rule is developed which can guarantee the relational load balancing and line loss from the collected voltage data. Finally, the several faults are simulated for typical multi-section and multi-interconnection distribution system to prove the effectiveness of the proposed strategy, in particular, for each simulation cases, the load balancing index and line loss index of the obtained solution from the proposed method is compared with those of all of feasible solutions.