In this study, the characteristics of various electricity and high resistivity ash collection were measured at superimposed nanosecond pulse energization. The pulse was generated through the hydrogen thyratron. Superimposed pulse was nanosecond duration pulse that had fast pulse rising time 100[ns], short pulse width 500∼850[ns] and pulse fall time 400∼750[ns]. The results of this study are summarized as followings; Frist, compared with the DC ESP(electrostatic precipitator), superimposed pulse ESP could induce higher peak voltage, and had the about 30[%] reduction of ESP collection area and 50∼80[%] reduction of power consumption. showing the same efficiency. Second, enhancement factor H had 1.9∼3.6 with the increase of migration velocity.
A pulse power supply using IGBTs and MPC (magnetic pulse compression) circuit was developed for a metal vapor laser. The life time of the pulse power supply is expected to be much longer than that of a vacuum tube or thyratron type pulse power supply. A series-connected IGBT array generated a long pulse of its pulse width 2 ${\mu}\textrm{s}$ md then it was compressed to less than 100 ns by a three stage MPC circuit. This pulse power supply was applied to a laser plasma tube of 10 mm inner diameter and 0.5 m discharge length. and successfully operated.
Power semicondcutor인 IGBT MOSFET, GTO, SI-Thyristor등은 높은 스위치 신뢰성과 life time, 그리고 fast repetition rate 등을 지니고 있기 때문에 medium/High voltage영역에서 스위치 사용이 대두되어 왔으나, Thyratron이나 Trigatron(Gap switch)와 비교하여 낮은 전압/전류를 스위칭하기 때문에 전통적으로 직렬연결을 통해 high voltage 영역의 스위치로 사용되어 왔다. 하지만, 직렬연결되어 있는 각각의 power semiconductor와 gate driving circuit의 on/off synchronization이 맞지 않기 때문에 부하의 급격한 변화에 따른 전압의 balance에 문제가 가장 심각하게 대두되어 왔다. 이러한 문제를 해결하기 위해서 gate driving circuit에서 제어를 해주는 방법과 power semiconductor에서 제어를 해주는 방법이 있으나 두 방식 모두 문제점이 있다. 본 논문에서는 기존의 zener clamping방식에서 벗어나 새로운 active clamping방식의 직렬연결을 제안했으며 시뮬레이션과 실험을 통해 나타난 이 결과들은 on/off transient 시 symmetry를 유지하는데 효과적이라는 것을 보여주고 있다.
Microwave heating system of KSTAR consists of ECH and LHCD. ECH and LHCD offer the reliability of operation in the beginning of plasma formation and non-inductive current drive for long time steady state operation with maintaining MHD stability, respectively. LHCD demands 5 GHz of frequency and consists of c-band waveguide, 4-port circuitor, dry dummy load, dual directional coupler, E-bend, arc detector. Our system is a lineup type pulse modulator that has 45 kV of output pulse voltage, 90 A of pulse current, 4 us of pulse width. 1:4 step-up pulse transformer, 7 stages of PFN and thyratron tube (E2V, CX1191D) are used in this modulator. The purpose of this paper is to show the modulator design and experimental result.
Industrial-scale pulse corona process to remove $SO_2$ and $NO_x$ simultaneously from combustion flue gas has been studied. The pilot plant built in the present study treats 2,000 $Nm^3$/hr of flue gas from a boiler. The geometry of the pulse corona reactor is similar to that of an electrostatic precipitator commonly used in industry, A thyratron switch and magnetic pulse compressors, which can generate up to 130 kV of peak pulse voltage and up to 30 kW of average pulse power, have been used to produce pulsed corona. The removal efficiencies of $S0_2$ and $NO_x$ with the present process are maximum of 95 % and 85 %, respectively. Electrical power consumption to produce the pulsed corona, which has been one of the major difficulties to apply this process to industry, has been evaluated in the present study. The results showed that the power consumption can be reduced significantly by simultaneous addition of hydrocarbon injection and heterogeneous phase reactions to the process.
Lee, B.J.;Park, S.S.;Kim, S.H.;Kwon, S.J.;Jang, S.D.;Joo, Y.
한국진공학회:학술대회논문집
/
한국진공학회 2012년도 제43회 하계 정기 학술대회 초록집
/
pp.261-261
/
2012
This paper presents the understandings carried out for the installation of the hydrogen reservoir of the multi-gap pseudospark switch under developing for the accelerator applications. As a cold cold cathode switch, the pseudospark switch could replace the thyratron switch which has hot cathode and being used well currently in the high power field such as laser and accelerator applications. Especially in the klystron modulator, the key component is a switch which mostly defines the jitter and the instability of the modulator system. To get the less jitter and the instability, we need to find proper range of the pressure for the gas discharge inside gas switch. This could be achieved by the understanding of the characteristic of the nonevaporable getter (NEG) which is used as a hydrogen reservoir for the switch. Therefore we verified the characteristics of the NEG (St 172, Saes) and its installation in the switch. Finally we controlled the getter to find best pressure point for the pseudospark switch.
The 2.0 GeV Pohang Light Source (PLS) is consisted of a full energy Linac and a storage ring. Four kicker magnets are installed in the storage ring tunnel to move the stored beam orbit in the storage ring closer to the injected beam from the beam transfer line. The injected beam then falls into the storage ring beam dynamic aperture. A kicker magnet modulator drives all four kicker magnets to maintain field balance and also synchronized kick of the beam. The kicker modulator can handle 2 GeV full energy beam. The kicker magnet modulator is installed in the storage ring tunnel and under stable operation. Specification of the kicker magnet modulator is ${\sim}6.0{\mu}s$ pulse-width, 200 ns flat-top width with ${\pm}0.2%$ regulation, ${\sim}24\;kA$ peak current, and 10 Hz repetition rate. Two thyratron switches (EEV CX-1536AX) are used in the system. In this article, design, and experimental results of the kicker magnet modulator are discussed.
The Korean Superconducting Tokamak Advanced Research (KSTAR) tokamak device is being constructed to perform long-pulse, high-beta, advanced tokamak fusion physics experiments. The long-pulse operation requires the non-inductive current drive system such as the Lower-Hybrid Current Drive (LHCD) system. The LHCD system drives the non-inductive plasma current by means of C-band RF with 2-MW CW power and 5-GHz frequency. For the LHCD test experiments, an RF test system is developed. It is composed of a 5-GHz, 1.5-MW pulsed magnetron and a compact pulse modulator with $4\;{\mu}s$ of pulse width. The pulse modulator provides the maximum output voltage of 45 kV and the maximum current of 90 A. It is composed of 7 stages of Pulse Forming Network (PFN), a thyratron tube (E2V, CX1191D), and a pulse transformer with 1:4 step-up ratio. In this paper, the detailed design and the performance test of the pulse modulator are presented.
This paper presents the understandings carried out for the installation of the hydrogen reservoir of the multi-gap pseudospark switch under developing for the accelerator applications. As a cold cold cathode switch, the pseudospark switch could replace the thyratron switch which has hot cathode and being used well currently in the high power field such as laser and accelerator applications. Especially in the klystron modulator, the key component is a switch which mostly defines the jitter and the instability of the modulator system. To get the less jitter and the instability, we need to find proper range of the pressure for the gas discharge inside gas switch. This could be achieved by the understanding of the characteristic of the nonevaporable getter (NEG) which is used as a hydrogen reservoir for the switch. Therefore we verified the characteristics of the NEG (St 172, Saes) and its installation in the switch. Finally we controlled the getter to find best pressure point for the pseudospark switch.
방사선 치료의 핵심 장비인 선형가속기의 10년간 관리 기록을 분석하여 효율적인 관리 지표로 활용하고자한다. 장비의 장애 요인을 다각적으로 분석하기위해 고장 원인을 치료기 부위별로 세분했고 각각이 미치는 영향을 세 단계로 구분하여 조사했다. 또한 장비 사용량이 고장에 미치는 영향을 분석하기 위해 년도별 치료 환자수와 고장건수, 중요 부속의 평균 수명 등을 분석했다. 10년간 전체 고장건수는 587건 이였으며 이중 조사헤드부의 고장이 20%를 자치해 가장 높게 나타났으며 고장이 미치는 영향에 의한 분석에서는 일시적 장애해 당하는 중간 정도의 고장이 41%를 차지해 가장 높게 나타났다. 장애 영향이 가장 큰 조사 불가능 상태의 고장은 가속부에서 49%로 가장 높게 나타났으며 고장과 관련된 지표는 사용연수 및 치료건수와 밀접한 관계를 나타냈다. 중요 부속의 평균 수명은 클라이스트론과 싸이라트론의 경우 치료건수가 증가함에 따라 교체 주기가 빨라져 각각 제조사 권고치의 42%, 83% 수준이였다. 안정적인 치료서비스 제공을 위해서는 사용 연수가 증가함에 따라 장비 관리의 필요성이 더욱 중요시 되어야하며 10년간 장비 관리기록을 통해 얻은 각종 지표가 향후 효율적 관리의 좋은 지침이 될 것으로 사료된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.