Analysis of the Influence of Post-Combustion $CO_2$ Capture on the Performance of Fossil Power Plants (후처리를 이용한 $CO_2$ 포집이 화력 발전설비 성능에 미치는 영향 해석)

  • Tak, Sang-Hyun;Kim, Tong-Seop;Chang, Young-Soo;Lee, Dae-Young;Kim, Min-Sung
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.22 no.8
    • /
    • pp.545-552
    • /
    • 2010
  • Research and development efforts to reduce $CO_2$ emission are in progress to cope with global warming. $CO_2$ emission from fossil fuel fired power plants is a major greenhouse gas source and the post-combustion $CO_2$ capture is considered as a short or medium term option to reduce $CO_2$ emissions. In this study, the application of the post-combustion $CO_2$ capture system, which is based on chemical absorption and stripping processes, to typical fossil fuel fired power plants was investigated. A coal fired plant and a natural gas fired combined cycle plant were selected. Performance of the MEA-based $CO_2$ capture system combined with power plants was analyzed and overall plant performance including the energy consumption of the $CO_2$ capture process was investigated.

Prediction of Maintenance Period of Equipment Through Risk Assessment of Thermal Power Plants (화력발전설비 위험도 평가를 통한 기기별 정비주기 예측)

  • Song, Gee Wook;Kim, Bum Shin;Choi, Woo Song;Park, Myung Soo
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.37 no.10
    • /
    • pp.1291-1296
    • /
    • 2013
  • Risk-based inspection (RBI) is a well-known method that is used to optimize inspection activities based on risk analysis in order to identify the high-risk components of major facilities such as power plants. RBI, when implemented and maintained properly, improves plant reliability and safety while reducing unplanned outages and repair costs. Risk is given by the product of the probability of failure (POF) and the consequence of failure (COF). A semi-quantitative method is generally used for risk assessment. Semi-quantitative risk assessment complements the low accuracy of qualitative risk assessment and the high expense and long calculation time of quantitative risk assessment. The first step of RBI is to identify important failure modes and causes in the equipment. Once these are defined, the POF and COF can be assessed for each failure. During POF and COF assessment, an effective inspection method and range can be easily found. In this paper, the calculation of the POF is improved for accurate risk assessment. A modified semi-quantitative risk assessment was carried out for boiler facilities of thermal power plants, and the next maintenance schedules for the equipment were decided.

Severe Accident Analysis for Wolsung Nuclear Power Plants

  • Kwon, Jong-Jooh;Kim, Myung-Ki;Park, Byoung-Chul;Kim, Inn-Seock;Hong, Sung-Yull
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1997.05a
    • /
    • pp.464-470
    • /
    • 1997
  • Severe accident analysis has been performed for the Wolsung nuclear power plants in Korea to investigate severe accident phenomena of CANDU-600 reactors as a part of Level II PSA study. The accident sequence analyzed in this paper is loss of active heat sinks(LOAH) which is caused by loss of off-site power, diesel generators, and DC power. ISAAC (Integrated Severe Accident Analysis Code)computer code developed by KAERI (Korea Atomic Energy Research Institute) was used in this analysis. This paper describes the important thermal-hydraulics and source term behaviors in the primary system and inside containment, and the failure mechanism of calandria vessel and containment. In addition, some insights for accident management program(AMP) are also given.

  • PDF

Warm Start Up Time Reduction Through the Increase of Boiler Water Circulating Pump Inlet Water Temperature Rate of the Thermal Power Plant (관수온도 상승률 증가에 의한 발전용 보일러의 온간기동시간 단축에 관한 연구)

  • Kang, Hee-Seong;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.10 no.1
    • /
    • pp.47-53
    • /
    • 2014
  • The national capacity of electricity of Korea was 81,737 MW and the peak demand was renewed by the record of 71,230 MW in 2012 which has been increasing since the first lighting ceremony had taken place in the Royal Palace(Kyung-Bok Goong) in 1887. Aa the counteract on the rapid increasing of the demand, Korean government is constructing and operating the high capacity nuclear and thermal power plants, however, the operating reserve on weekdays is small while those of weekends are more than 40% of capacity, so they are providing the pumped-storage power plants with the surplus electricity during weekends and operating the power plants which cost higher production price and located in the capital area with WSS (Weekly Start and Stop) mode including the Seoul Thermal Power Plant. Since the Seoul Thermal Power Plant is spending huge amount of expenses for more than 30 times of the WSS annually due to the high production cost even though it is in Seoul, the core of the demand, I chose the power plant unit #5 which was on the grid in 1969 for the case to confirm reducing 23% of the warm start-up time by applying the "Start-up time management program", and that reducing 35% of the water temperature increasing time by accelerate the increasing rate of the inlet temperature of the water circulating pump.

  • PDF

Economic Evaluation of Coupling APR1400 with a Desalination Plant in Saudi Arabia

  • Abdoelatef, M. Gomaa;Field, Robert M.;Lee, YongKwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.12 no.1
    • /
    • pp.73-87
    • /
    • 2016
  • Combining power generation and water production by desalination is economically advantageous. Most desalination projects use fossil fuels as an energy source, and thus contribute to increased levels of greenhouse gases. Environmental concerns have spurred researchers to find new sources of energy for desalination plants. The coupling of nuclear power production with desalination is one of the best options to achieve growth with lower environmental impact. In this paper, we will per-form a sensitivity study of coupling nuclear power to various combinations of desalination technology: {1} thermal (MSF [Multi-Stage Flashing], MED [Multi-Effect Distillation], and MED-TVC [Multi-Effect Distillation with Thermal Vapour Compression]); {2} membrane RO [Reverse Osmosis]; and {3} hybrid (MSF-RO [Multi-Stage Flashing & Reverse Osmosis] and MED-RO [Multi-Effect Distillation & Reverse Osmosis]). The Korean designed reactor plant, the APR1400 will be modeled as the energy production facility. The economical evaluation will then be executed using the computer program DEEP (Desalination Economic Evaluation Program) as developed by the IAEA. The program has capabilities to model several types of nuclear and fossil power plants, nuclear and fossil heat sources, and thermal distillation and membrane desalination technologies. The output of DEEP includes levelized water and power costs, breakdowns of cost components, energy consumption, and net saleable power for any selected option. In this study, we will examine the APR1400 coupled with a desalination power plant in the Kingdom of Saudi Arabia (KSA) as a prototypical example. The KSA currently has approximately 20% of the installed worldwide capacity for seawater desalination. Utilities such as power and water are constructed and run by the government. Per state practice, economic evaluation for these utilities do not consider or apply interest or carrying cost. Therefore, in this paper the evaluation results will be based on two scenarios. The first one assumes the water utility is under direct government control and in this case the interest and discount rate will be set to zero. The second scenario will assume that the water utility is controlled by a private enterprise and in this case we will consider different values of interest and discount rates (4%, 8%, & 12%).

Calculation of CO2 Emission and Generator Output of Thermal Power Plant (화력발전소의 발전출력과 $CO_2$ 대기배출량 계산)

  • Lim, Jeong-Kyun;Lee, Sang-Joong
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2007.05a
    • /
    • pp.417-420
    • /
    • 2007
  • This paper proposes a method to calculate the amount of the CO2 emission w.r.t. generator MW output using the input-output coefficients of the thermal power plants. A calculation of CO2 emission for an LNG fired combined cycle power plant is demonstrated.

  • PDF

국내 무연탄 발전소 혼소율 변화에 따른 탈황 특성 연구

  • Kim, Jeong-Yu;Park, Dae-Yeong;Lee, Jae-Heon;Mun, Seung-Jae
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2008.03b
    • /
    • pp.84-87
    • /
    • 2008
  • The sulfur oxides is one of important materials to come about air pollution at thermal plant consuming fossil fuel. The several flue gas desulfurization equipments are installed and operated to decrease sulfur oxides. The flue gas desulfurization of our thermal plant is designed for optimizing flue gas desulfurization technical development and research by Korea Electric Power Research Institute. We operate this desulfurization equipment. Now, our country imports nearly 97 percentage of the energy source and competes with the world for the energy because of the rise of raw materials cost. The fuel cost decrease of power plants is the most important factor of the operation. The fuel used in the experiment is the domestic anthracite from Kangwon Taeback and the bituminous coal from Russia,Taldinsky Mine. This Study is experimental investigations of desulfurization characteristics for domestic anthracite power plant by increasing bituminous coal. We surveyed possible parameters and conducted the performance about desulfurization equipment in Y.D thermal power plant.

  • PDF

Calculation of Maximum Allowabel Temperature Difference for Life Design of Valve Casings for Steam Turbines of Fossil Power Plants (화력발전용 증기터빈 밸브 케이싱의 수명 설계를 위한 최대허용온도차 계산)

  • Ha, Joon-Wook;Kim, Tae-Woan;Lee, Boo-Youn
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.16 no.8
    • /
    • pp.46-52
    • /
    • 1999
  • Large valves for steam turbines of fossil power plants are exposed to a severe mechanical and thermal loading resulting from steam with high pressure and high temperature. Valve casings are designed to withstand such a loading. During the operation of a plant, temperatures at inner and outer surface of the casings are measured and steam flow is controlled so that the measured difference is lower than the maximum allowable value determined in the design stage. In this paper, a method is presented to calculate the maximum allowable temperature difference at the inner and outer surface of valve casings for steam turbines of fossil power plants. The finite element method is used to analyze distribution of temperature and stresses of a casing under the operating condition. Low cycle fatigue and creep rupture are taken into consideration to determine the maximum allowable temperature difference. The method can be usefully applied in the design stage of the large valves for the steam turbines, contributing to safe and reliable operation of the fossil power plants.

  • PDF

Diagnosis of Medium Voltage Cables for Nuclear Power Plant

  • Ha, Che-Wung;Lee, Do Hwan
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.4
    • /
    • pp.1369-1374
    • /
    • 2014
  • Most accidents of medium-voltage cables installed in nuclear power plants result from the initial defect of internal insulators or the initial failure due to poor construction. However, as the service years of plants increase, the possibility of cable accidents is also rapidly increases. This is primarily caused by electric, mechanical, thermal, and radiation stresses. Recently, much attention is paid to the study of cable diagnoses. To date, partial discharge and Tan${\delta}$ measurements are known as reliable methods to diagnose the aging of medium-voltage cables. High frequency partial discharge measurement techniques have been widely used to diagnose cables in transmission and distribution systems. However, the on-line high frequency partial discharge technique has not been used in the nuclear power plants because of the plant shutdown risk, degraded measurement sensitivity, and application problems. In this paper, the partial discharge measurement with a portable device was tried to evaluate the integrity of the 4.16kV and 13.8kV cable lines. The test results show that the high detection sensitivity can be achieved by the high frequency partial discharge technique. The present technique is highly attractive to diagnose medium voltage cables in nuclear power plants.

eXtended Statistical Combination of Uncertainties (XSCU) Method for Digital Nuclear Power Plants

  • In, Wang-Kee;Hwang, Dae-Hyun;Kim, Joon-Sung;Auh, Geun-Sun
    • Nuclear Engineering and Technology
    • /
    • v.30 no.6
    • /
    • pp.617-627
    • /
    • 1998
  • A technically more direct Statistical Combination of Uncertainties (SCU) method, extended SCU (XSCU), was developed to statistically combine the uncertainties associated with the DNBR alarm setpoint and the DNBR trip setpoint of digital nuclear power plants. The Modified SCU (MSCU) method is currently used as the USNRC approved design method to perform the same function. In this study, the MSCU and XSCU methods were compared in terms of the total uncertainties, and the thermal margins to the DNBR alarm and trip setpoints. The MSCU method resulted in small total uncertainties due to large negative biases which are unphysical. The XSCU method gives virtually unbiased total uncertainties which are physically meaningful in order to represent the actual magnitude of the total uncertainties associated with the DNBR alarm and trip setpoints. But the thermal margins to the DNBR alarm and trip setpoints by the MSCU method agree with those by the XSCU method within allowable statistical Variations.