1 |
Plant Support Engineering, "Life Cycle Management Planning Sourcebooks: Medium-Voltage (MV) Cables and Accessories (Terminations and Splices)," EPRI, Palo Alto, November, 2006.
|
2 |
Gary Toman, "Aging Management Program Guidance for Medium Voltage Cable Systems for Nuclear Power Plants," Drafet-2, October 14, 2009.
|
3 |
Plant Support Engineering, "Aging Management Program Guidance for Medium-Voltage Cable Systems for Nuclear Power Plants," EPRI, Palo Alto, CA, 2010.
|
4 |
J. Carey, "Cable Aging Management Program for D.C. Cook Nuclear Plant Units 1 and 2," EPRI, Palo Alto, December, 1996.
|
5 |
Su-Kil Lee, et al. "Characteristics of high frequency partial discharge for artificially defected extra high voltage accessories," IEEE conference on Electrical Insulation and Dielectric Phenomena, pp. 682-685, 2000.
|
6 |
S. Aggarwal, "Condition Monitoring Program for Electric Cables Used in Nuclear Power Plants," NRC, 2010. 6. vol., 1996. 4.
|
7 |
Plant Support Engineering, "Failure Mechanism Assessment of Medium-voltage Ethylene Propylene Rubber Cable-Revision 1", EPRI, Palo Alto, CA: 2009.
|
8 |
Dr. Q. Su, "New Techniques for On-line Partical Discharge Measurements," IEEE Xplore, March 08, 2010.
|
9 |
Kwang-Jin Lim,"A Study on the Design of a Planar Loop Sensor for Partial Discharge Diagnosis of 22.9 kV XLPE Power Cables," JEET, Vol. 3, No. 4, pp. 559-565, 2008.
과학기술학회마을
DOI
ScienceOn
|
10 |
M. Mohana Rao, "Effect of Metallic Particles on E-field Enhancement in Extra High Voltage Gas-insulated Transmission Lines,"JEET, Vol. 5, No. 4, pp. 631-636, 2010.
과학기술학회마을
DOI
ScienceOn
|