• 제목/요약/키워드: The building law

검색결과 625건 처리시간 0.024초

시공단계의 사고손실 비용 기반 건설안전 위험성 평가 방안 (Construction Safety Risk Assessment Method Based on Accident Loss Cost in the Construction Phase)

  • 이재현;정재욱;정재민
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.407-408
    • /
    • 2023
  • This article proposes a method to assess construction safety risk during the construction phase based on accident loss costs. Risk assessments for hazardous construction work are required by law, but they lack quantitative criteria. To address this, a survey estimated loss costs due to fatalities in the construction industry, finding labor loss cost and delay reimbursement cost to be the largest factors. The proposed method uses algorithm to calculate expected accidents and risk levels based on project characteristics, work methods, personnel, and environment data. This method is expected to enhance the reliability and usability of risk assessments during the construction phase of construction projects.

  • PDF

Project Financing의 책임준공에 대한 법률 분석 및 해외 사례 분석 (Legal Analysis and Overseas Case Analysis of Project Financing's Responsibility )

  • 최지은;김원창;이태규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.171-172
    • /
    • 2023
  • As a result of analyzing related laws and cases regarding the problems of PF requiring construction companies to guarantee liability for the entire scope of construction, including firefighting facility construction, the law requires repayment ability, and the capital ratio of PF in Korea is 10%. , Since the equity capital ratio of PF in the United States is 30%, it is judged that it is necessary to reduce the dependence of construction companies.

  • PDF

볼트조립식 CFT 내진보강공법에 관한 실험적 연구 (Experimental Study on the Bolt Assembly type CFT Seismic Reinforcement Construction Method)

  • 강수진;이동운;윤정배;김용기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.6-7
    • /
    • 2020
  • The government of South Korea enacted Earthquake Recovery Plan Act in 2008. In order to meet the requirement of this law, the important buildings, such as schools, public offices and so on, are in the process of seismic retrofit. This paper introduces the experimental data about a non-retrofitted concrete column and retrofitted column with a bolt assembly type CFT(concrete-filled steel tube).

  • PDF

도장공사 하자판정기준 개선 및 방화문 교체 주기 설정에 관한 법령 개정안 제안 연구 (A Study on the Proposal of Amendment of Laws and Regulations on the Improvement of Defect Determination Criteria for Painting Work and the Establishment of Replacement Cycle for Fire door)

  • 김수연;권영진;김윤성;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.95-96
    • /
    • 2022
  • Based on the analysis of defects occurring before and after painting work, this study intends to derive a reasonable improvement in judgment criteria and propose an amendment to the relevant law through the establishment of a clear fire door replacement cycle in terms of fire safety.

  • PDF

뉴스초점 - 산재예방 5개년(2010~2014) 계획 (Industrial accident prevention 5years plan)

  • 박무일
    • 기술사
    • /
    • 제43권4호
    • /
    • pp.33-38
    • /
    • 2010
  • The propulsive strategy of the 3rd five-year plan can be summarized into three parts; firstly, it is to divert from the technical approach, such as law reform, and to focus more on the culture in order to transform the perspectives of the employers and the employees. Secondly, it is to provide distinct policies for the areas prone to industrial accidents. Thirdly, the central government needs to seek decentralization and become a promoter of the strategy by abandoning its former restrictions, providing data about the strategy and building infrastructure.

  • PDF

공동주택 하자담보책임 기산일 변화에 따른 하자보증제도의 문제점 및 개선방안 (Problem of Guarantee System against Defect by Change Starting point of Defects Liability on the Management of Apartment Houses and Improvement)

  • 정용기;이태형;김옥규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.278-279
    • /
    • 2017
  • Result from Amendment of Apartment Houses Decree Customer Service, Recently, the starting point of Defects Liability changed "Criteria of Completion date" to "Delivery date to Divided property". Through the Law amended, There are some inconsistency between "Claim for repairing defects" and "Period of security deposit for repairing defects claim". If someone bought a house after Completion date, Purchasing period of "Claim to security deposit for repairing defects" lapsed without renewal. This research is to identify problems and solutions for improving the system.

  • PDF

Conceptualizing Accessible Tourism with Smart Technologies

  • Lin, Katsy Jiaxin;Ye, Huiyue;Law, Rob
    • Journal of Smart Tourism
    • /
    • 제2권2호
    • /
    • pp.5-14
    • /
    • 2022
  • In recent years, UNWTO and academics have called for the development of responsible, sustainable, and universally accessible tourism to promote equal human rights and social inclusion. Prior studies have also revealed the potential and value of smart technologies in reducing, if not removing, barriers to people with access requirements during travel and in their everyday lives. However, a guiding framework of how smart technologies assist in building an accessible destination is still absent, thereby hindering the progress of building accessible tourism. This paper aims to fill this knowledge gap. A conceptual model of smart accessible destination (SAD) was proposed drawing from the intersection of accessible tourism and smart tourism. With the guidance of this conceptual model, tourism destinations and stakeholders can recognize and utilize the synergies of accessible and smart tourism to enhance the social inclusion, competitiveness, and sustainability of a destination.

프레스 작업의 위험분석 몇 작업안전관리 체계연구 (- Building The Safety Management System of The Press Machine -)

  • 김병석
    • 대한안전경영과학회지
    • /
    • 제6권3호
    • /
    • pp.27-40
    • /
    • 2004
  • There are much dangerous machine in worksite. These make the rate of accidents increase. Specially, among them, the Press work has the highest rate of accidents. Therefore, it has been managed by Industrial safety-health law. It is very important to make a special study of work using the dangerous machine. In press work, it is also important to develop safety system program to improve productivity and work safely, In this reaserch, the safety management system is built for the work improvement of the Press. This paper showed method about dangerous machine.

건조설비 작업개선을 위한 안전관리 시스템 구축 (- Building The Safety Management System of The Dryness Equipment -)

  • 김병석
    • 대한안전경영과학회지
    • /
    • 제6권3호
    • /
    • pp.15-26
    • /
    • 2004
  • There is much dangerous machine in worksite. These make the rate of accidents increase. Specially, among them, dryness equipment work has the highest rate of accidents. Therefore, it has been managed by safety-health law. It is very important to make a special study of work using the dangerous machine. In press work, it is also important to develop safety system program to improve productivity and work safely In this reaserch. the safety mangement system is built for the work improvement of the Press. I will try new development method about dangerous machine.

초고층 건축물 건설공사 시 화재안전계획 수립에 관한 연구 (A Study on the Fire Safety Plan for High-Rise Building Construction)

  • 함은구;정명진;이명구
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2012년 추계학술대회
    • /
    • pp.59-66
    • /
    • 2012
  • Recently buildings are constructed in larger and higher scales and becoming more complex. Every country in the world is competing to build high-rise buildings. Korea also has and is constructing high-rise buildings, like the 123story Jamsil Lotte Super Tower. However from small to large scale buildings and on construction sites there still are fire safety accidents that occur continuously. Therefore to improve fire safety plan, examining the actual fire safety management and understanding fire risk analysis Using Fire Modeling through Computer Simulation. Fire safety management plan related fire safety cases were collected an dan analyzed for the study. Also hazard analysis of High rise Buildings under fire compared with existing fire law sand regulations.

  • PDF