• Title/Summary/Keyword: The basic plan of long term electricity supply & demand

Search Result 26, Processing Time 0.019 seconds

Generation Expansion Planning Model Supporting Diverse Environmental Policies for Reduction of Greenhouse Gases

  • Lee, Jeong-In;Lee, Il-Woo;Kim, Bal-Ho
    • ETRI Journal
    • /
    • v.37 no.2
    • /
    • pp.295-305
    • /
    • 2015
  • The purpose of this paper is to a develop model for generation expansion planning that can support diverse environmental policies for the reduction of greenhouse gases (GHGs) of South Korea. South Korea is required to reduce its GHG emissions by 30% from the BAU level by 2020. The Wien Automatic System Planning Package currently used in South Korea has limitations in terms of the application of renewable energy policies and GHG targets; this paper proposes the use of an equipment planning model named generation and transmission expansion program, which has been developed to resolve such limitations. For verification of the model, a case study on the 6th Basic Plan of Long-Term Electricity Supply and Demand has been conducted. The results show that for the year 2020 South Korea's annual GHG emissions will be 36.6% more than the GHG Target Management System (GHG TMS) target set for the same year (30%). To achieve the GHG TMS target, the costs involved amount to about 72 trillion KRW (70 billion USD). Consequently, the South Korean government needs to review the performability of this target.

ADVANCED SFR DESIGN CONCEPTS AND R&D ACTIVITIES

  • Hahn, Do-Hee;Chang, Jin-Wook;Kim, Young-In;Kim, Yeong-Il;Lee, Chan-Bock;Kim, Seong-O;Lee, Jae-Han;Ha, Kwi-Seok;Kim, Byung-Ho;Lee, Yong-Bum
    • Nuclear Engineering and Technology
    • /
    • v.41 no.4
    • /
    • pp.427-446
    • /
    • 2009
  • In order to meet the increasing demand for electricity, Korea has to rely on nuclear energy due to its poor natural resources. In order for nuclear energy to be expanded in its utilization, issues with uranium supply and waste management issues have to be addressed. Fast reactor system is one of the most promising options for electricity generation with its efficient utilization of uranium resources and reduction of radioactive waste, thus contributing to sustainable development. The Korea Atomic Energy Research Institute (KAERI) has been performing R&Ds on Sodium-cooled Fast Reactors (SFRs) under the national nuclear R&D program. Based on the experiences gained from the development of KALIMER conceptual designs of a pool-type U-TRU-10%Zr metal fuel loaded reactor, KAERI is currently developing Advanced SFR design concepts that can better meet the Generation IV technology goals. This also includes developing, Advanced SFR technologies necessary for its commercialization and basic key technologies, aiming at the conceptual design of an Advanced SFR by 2011. KAERI is making R&D efforts to develop advanced design concepts including a passive decay heat removal system and a supercritical $CO_2$ Brayton cycle energy conversion system, as well as developing design methodologies, computational tools, and sodium technology. The long-term Advanced SFR development plan will be carried out toward the construction of an Advanced SFR demonstration plant by 2028.

A Study on Expanding the Recycling of Coal Ash for Minimizing Environmental Impact Imposed by the Establishment of Thermal Power Plant Ash Ponds (화력발전소 회처리장 조성에 따른 환경영향 최소화를 위한 석탄회 재활용 확대방안에 관한 연구)

  • Suh, Dong-Hwan;Maeng, Jun-Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.24 no.5
    • /
    • pp.472-486
    • /
    • 2015
  • More than 8M tons of coal ashes are generated from coal-fired thermal power plants every year in Korea. Excluding the recycled portion (Current recycling rate: approximately 70%), all of the generated coal ashes end up in coastal landfills. Currently, the difficulties faced in establishing new ash treatment fields are attributed to the concerns raised over the environmental impacts caused by the landfills at individual plant facilities. Given the number of coal-fired thermal power plants to be built in the future (reflected in the 7th Basic Plan for Long-term Electricity Supply and Demand), building new ash treatment fields or seeking a new treatment plan seems unavoidable. Based upon a review of coal ash and its management, this study concluded that the most effective and fundamental strategy to minimize the environmental impacts resulting from coal ash landfills is to avoid constructing new coal-fired powerplants and furthermore, suggests that the practice of beneficial use and recycling the produced coal wastes should be encouraged.

Estimating the Compliance Cost of the Power and Energy Sector in Korea during the First Phase of the Emissions Trading Scheme (발전·에너지업종의 배출권거래제 제1차 계획기간 배출권 구입비용 추정과 전력시장 반응)

  • Lee, Sanglim;Lee, Jiwoong;Lee, Yoon
    • Environmental and Resource Economics Review
    • /
    • v.25 no.3
    • /
    • pp.377-401
    • /
    • 2016
  • This study analyzes how much cost the power generation and energy sector in South Korea have to bear due to the introduction of emissions trading scheme during 2016 - 2017. To this end, the data on the seventh basic plan for long-term electricity supply and demand is applied to the electricity market simulation model called M-Core, and then the model forecasts carbon dioxide emissions to compare with the free emission allowances in the first national emissions permit allocation plan. The main results are as follows. Carbon dioxide emissions are estimated to be less in 2016 but more than the free emission allowances in 2017. When the price of the allowances is changed from \10,000/ton to \20,000/ton, the cost of purchasing the allowances is ranged from \70 billion to \140 billion. Under the assumption that CO2 cost is incorporated into the variable cost, a reversal of merit order between coal and LNG generation takes place when the price of the allowances exceeds \80,000/ton.

A Study on the Integration Costs in Korean Electric System in Accordance with Increasing Solar and Wind Power Generation (태양광·풍력 발전 증가에 따른 한국의 전력시스템 내 통합비용에 관한 연구)

  • Kim, Doo Chun;Kim, Kwang Jin;Park, Jung Gu
    • Journal of Energy Engineering
    • /
    • v.28 no.3
    • /
    • pp.42-54
    • /
    • 2019
  • The solar and wind power is spreading as a means to $CO_2$ reduction, but it has the characteristics of the volatility depending on the weather changes. This article aims to estimate the additional integration costs in Korea electric system in response to such volatility of increasing solar and wind power generation, using Korea electric power trading analyzer(KEPTA). The analysis utilizes the statistics of "8th Basic Plan for Long-term Electricity Supply and Demand" and "Renewable Energy Plan 3020". As the results, integration costs will be estimated 13.94Won/kWh~32.55Won/kWh, consisting of 8.94Won/kWh as back-up costs, 1.03Won/kWh~4.45Won/kWh as balancing costs, and 3.97Won/kWh~19.16Won/kWh as grid-costs. These results suggest that when the integration costs are secured, Korea electric system will be expected in the stable situation. This article leaves the further studies with taking the technological development of solar and wind power generation, the introduction of energy storage system, and wholesale price of electricity into consideration.

On the Social Acceptance of Site Selection for a LNG Power Plant (LNG발전소 입지선정에 관한 주민 수용성 제고연구)

  • Park, Dongkyu;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.18 no.3
    • /
    • pp.41-51
    • /
    • 2022
  • Recently, LNG power plants are increasing drastically and the desire of an improvement in the quality of life is growing. The delay of power plant construction can hinder the stability of power supply and increase the cost. So this study was conducted to help power plant construction progressing from now on by studying on the social acceptance of a LNG power plant. On this study I limited the scope of the study to the stage of Site Selection which is the most conflict stage and can interrupt the project. To conduct this study I researched the recently constructed power plants which have been delayed, in particular Eumseong Natural Power Plant and Daegu LNG Power Plant which are under bitter conflicts with local residents and have difficulty in construction progressing. So I found out that it is very important to collect the opinions of the residents in the stage of Site Selection and it is necessary to change ACT ON ASSISTANCE TO ELECTRIC POWER PLANTS- NEIGHBORING AREAS. Lastly it is very important to adapt the state-of-the-art facilities to increase the social acceptance of a LNG power plant.

  • PDF