• Title/Summary/Keyword: The Repair and Maintenance Expenses

Search Result 19, Processing Time 0.015 seconds

A Study on Standard Repair Periods, Repair Rates of School Facilities for Revitalizing of the School BTL Project (학교 BTL사업의 활성화를 위한 학교시설의 수선주기와 수선율 및 내용연수 산정에 관한 연구 -서울시내 초·중·고등학교를 중심으로-)

  • Ha, Ho-Sung
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.6 no.1
    • /
    • pp.60-84
    • /
    • 2007
  • This study purpose is seeing that the independent standard sufficiently reflecting the characteristics of the school facility as the basic material needed to calculate the maintenance and repair expenses is needed to make a more realistic and valid qualitative VFM analysis of the school BTL project. this study attempted to develop the standard for the repair cycle and rate and economic year of the school facility. The quantitative VFM analysis should be conducted based on the repair cycle and repair rate proper to the school facility, not the residential space, when calculating the maintenance and repair expenses of the operating expenses of the school facility. An attempt was made to calculate the repair cycle, repair rate and economic life of 114 component materials of the school facility judged to be able to explain the school field best. And it was confirmed that the repair and maintenance expenses more is needed to be set by about 35% than the existing maintenance and repair expenses.

  • PDF

A Study on the Maintenance System Improvement for Commercial Residential Buildings (주상복합건물의 유지관리 제도 개선방안)

  • Kim Seung-Jin;Baeck Kwang-Sub;Yeo Jong-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.191-196
    • /
    • 2005
  • Unpreparedness of the maintenance regulations is regarded as the main reason for the short life span of the multi-owned commercial residential buildings. This study suggests that the followings should be prepared for the effective maintenance and life prolongation of the multi-owned commercial residential buildings : 1) Standard maintenance regulations for those buildings should be set up, 2) Building maintenance works should be performed by the specialists, like licensed building manager, mechanical and electrical engineers, etc., 3) Long-range repair expenses should be laid by on the monthly base according to the long-range repair plan, 4) Regulations concerning the defect repair should be provided properly.

  • PDF

Comparison of Predicted Maintenance Costs and Actual Maintenance Cost of Military Facilities - Focused on BTL Project - (병영 시설물 수선유지비용 예산대비 실투입 비교에 관한 연구 - BTL사업 중심으로 -)

  • Lee, Don-Soo;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.5
    • /
    • pp.473-481
    • /
    • 2017
  • With the barracks modernization project, the Ministry of National Defense has been operating 60 projects of the 75 that have been announced. It was difficult to investigate and analyze the data in the past because data could not be obtained while it was much easier to do that since data can be obtained from private companies. With the aim of increasing the usability of the facilities, the objective of this study is to present a reasonable alternative for repair and maintenance costs by investigating and analyzing the budget and the actual expenses of repair and maintenance of military facilities for the past 3 to 5 years, and then identifying the problems with these. To accomplish this, a theoretical review of previous studies and legal grounds related to repair and maintenance costs was performed, and data on the estimates and the actual expenses data used in BTL projects carried out by private companies were analyzed. First, one of the problems was that there are some items omitted, including consumables, and these items should be included in order to secure their budget. Second, in terms of the items for divided payments, two improvements had been presented: a short-term payment plan for the operation period of 3 to 5 years and a long-term payment plan for an additional and complemented period other than the operation period. The repair and maintenance costs should be further studied at the point of time in a future when the actual data on the costs and operation period of military facilities can be secured. This study is expected to serve as empirical data that will form the basis for a reasonable calculation of the construction cost for military facilities.

무작위 초 보유 자원을 이용한 신뢰성 모델

  • Kim, Songkyoo
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.199-202
    • /
    • 2001
  • This article deals with stochastic reliability systems that include a repair facility and unreliable machines: the main facility of working and an auxiliary facility of "super-reserve" machines. The number of super-reserve machines are random number with a arbitrarily distribution and working machines break down exponentially. Defective machines line up for repair, whose durations are arbitrarily distributed. Refurbished machines return to the main facility. If the main facility is restored to its original quantity, the repair facility leaves on routine maintenance until all of super-reserve machines are exhausted. Then, the busy period is regenerated. The whole system also falls into the category of closed queues, with more options than those of basic models. The techniques include two-variate Markov and semi-regenerative processes, and a duality principle, to find the probability distribution of the number of intact machines. Explicit formulas obtained demonstrate a relatively effortless use of functionals of the main stochastic characteristics (such as expenses due to repair, maintenance, waiting, and rewards for higher reliability) and optimization of their objective function. Applications include computer networking, human resources, and manufacturing processes.

  • PDF

BASIC RESEARCH FOR BUILDING EDUCATIONAL FACILITY MAINTENANCE PROCESS - FOCUSING ON DAEJEON METROPOLITAN CITY -

  • Jung-Whan Oh;Chun-Kyong Lee ;Mi-Hye Lee ;Tae-Keun Park
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1203-1207
    • /
    • 2005
  • At this point of time that it is required to improve educational environment and the function of educational facilities as well as interests on educational facility business is increasing, it is actual situation that unsystematic maintenance of educational facility is not being able to cope with the change caused by introducing the 7th curriculum. Also, in spite of enormous career in maintenance work, the function is not properly performed because of unsystematic management. In case of educational facility manager, he parallels performing general administrative work and facilities maintenance work not as a maintenance expert but as a member of administration office. So there are difficulties in performing maintenance work, and systematic maintenance work cannot be expected because of lacking maintenance manual. Therefore, in this research, I would like to investigate and analyze the status of educational facilities and to elicit the point of issue as a basic research to save maintenance expenses and to make pleasant educational environment.

  • PDF

A Study on the Time Series Analysis of Defect Maintenance Cost in Apartment House according to the Actual Use Data (실적자료에 의한 공동주택 하자보수비용의 시계열적 분석)

  • Song, Dong-Hyun;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.177-178
    • /
    • 2011
  • Recently a great deal of people are taking legal action against the housing provider due to the defects of their Apartment house. And most of the housing companies are spending a huge amount of expenses and efforts to keep their brand value. This essay will carry out time series analysis the 20 housing district which are constructed by huge construction companies. This analysis itemised by metropolitan area(Seoul) and others to keep the degree of reliability, and converted future defect maintenance cost into current cost applied by discount rate to figure out suitability of defect maintenance cost. Even though, this essay is not able to represent standard of defect maintenance cost due to the insufficiency of record, while it will be assisted as a referance when long-term record of time series is estabilished.

  • PDF

A study on reliability analysis model of the repair and replacement cycle of a building which utilizes Monte Carlo Simulation (몬테카를로 시뮬레이션을 활용한 건축물 수선교체주기 신뢰성 분석 모델에 관한 연구)

  • Kim, Jong-Rok;Jung, Young-Han;Son, Jae-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.41-50
    • /
    • 2010
  • This study presented a model that can enable a reliability analysis for the repair and replacement cycle of a building by using background repair and replacement data and expert opinion as foundation data and applying Monte Carlo Simulation. The presented model offers the time of the repair and replacement of building elements for the period of a year, and supports the prediction of repair and replacement and expenses demand in advance while planning the maintenance of a building. In addition, the model will significantly reduce the risks to the building owner with regard to maintenance decisions. In addition, when a person in charge of the maintenance of large-scale building assets is having difficulties making decisions regarding the repair and replacement of existing building elements due to a lack of background data to support a long-term policy on the repair and replacement requirements, an engineering solution that can ensure the adequacy of this is provided. In summary, it can be largely divided into three study results. First, a method of estimating the repair and replacement cycle that can deal with the development of a construction system was developed. Second, a probabilistic methodology that can quantify the risk of the repair and replacement cycle was proposed. Third, the proposed model can be used as a means of supporting designer and constructor in making decisions for the life cycle plan of a building during a construction project.

The structural analysis of bogie for high speed freight car (고속화차용 용접대차의 구조강도해석)

  • 황원주;함영삼;권성태;허현무;전응식
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.217-221
    • /
    • 2001
  • Barber bogie and Y25 bogie is the main bogie of freight car which is used in the Korean railway. In case of Barber bogie and a mixed formation tile maximum speed limit of empty car is 70 km/h and that of loaded car is 90 km/t and also it runs a speed of 110 km/h in time of an exclusive formation of Y25 bogie. The car named as high speed freight car at present is Y25 bogie which modeled on the Y25 bogie or Europe developed in 1993, Y25 bogie has no problem about the running capacity up to the speed of 110 km/h, but it works as limiting factors to tile increasing cost of maintenance and repair expenses which caused by repair of bogie and the cost of materials. This study is going to describe the contents examined by analysis and tests, aimed at being used as an index of plan in the future through the strength test of high speed freight car which is used now.

  • PDF

A Study on The Korean Climatic Condition for The Military Environmental Testing Specification. (군 환경시험규격 현실화를 위한 한반도 자연환경 조건분석)

  • 이관훈;송병석;홍원식;강보철;염대원;이도희;김준원;금종주
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.4 no.2
    • /
    • pp.70-83
    • /
    • 2001
  • The required standards for environmental tests for communication and electronic equipment used currently in the army are not standards into which the Korean climate and use environment are taken into consideration. But the environmental testing standards of the U.S. army at the time of its establishment(MIL-STD-810) “A” version has been used without taking into consideration the Korean domestic situation and conditions by simply translating the US standards. Adherence to these standards may limit the ability to supply materials in case of emergency since the increase in the manufacturing costs according to excessively strict standards induces an increase in the acquisition cost of military equipment, unnecessarily high maintenance and repair expenses are consumed, and stocks of parts for the military use have to be retained at all times.

  • PDF

An Experimental Study on the Non-Exposure Composite Waterproofing Method used Adhesion Liquid and Sheet Integrate Waterproofing Material (점착형 도막.시트 일체형 방수재를 이용한 비노출용 복합 방수공법에 관한 실험적 연구)

  • Kim, Jin-Sung;Seon, Yun-Suk;Park, Jin-Sang;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.125-128
    • /
    • 2007
  • The problem of water leakage due to damaging waterproof in concrete structure, causes the impediment in a long term and shortened the life span of durability. There are a lot of techniques for repair and reinforcement to improve using environment. However, the improper construction which is unconsidered various environmental conditions, could effect to increase the maintenance expenses. Therefore, this study will be compared and estimated the adhesion liquid and sheet integrate waterproofing material, as analyzing the existing problem. For those result, we would like to arrange the alterative plan for the long durability and user needs of concrete structure.

  • PDF