• Title/Summary/Keyword: The Priority

Search Result 6,495, Processing Time 0.036 seconds

A Study of Comparison with the Operating Priority Rules of RMGC on Semi-Automated Container Terminal (반자동화 컨테이너터미널의 RMGC 운영방식 비교 분석)

  • Kim, Chan-Ho;Ha, Tae-Young;Yang, Hong-Suk
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.35 no.2
    • /
    • pp.1-17
    • /
    • 2010
  • This paper aims to compare four operating priority rules of RMGC (Rail Mounted Gantry Crane) used in semi-automated container terminal. The four priority rules employed in this paper are FCFS (First-come-first-served), LCFS (Last-come-first-served), TOS (Turn-over-served) and NFS (Nearest-first-served). And to compare the four operating priority rules, this paper analyzed productivity of RMGC and CC (Container Crane), waiting time of YT (Yard Truck) and RT (Road Truck) in container yard, and turnaround time of RT in container terminal of each priority rule by using stevedoring simulation. As a result, NFS was evaluated as the best rule to improve the overall productivity of container terminal in terms of all criteria.

Priority MAC based on Multi-parameters for IEEE 802.15.7 VLC in Non-saturation Environments

  • Huynh, Vu Van;Le, Le Nam-Tuan;Jang, Yeong-Min
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.37 no.3C
    • /
    • pp.224-232
    • /
    • 2012
  • Priority MAC is an important issue in every communication system when we consider differentiated service applications. In this paper, we propose a mechanism to support priority MAC based on multi-parameters for IEEE 802.15.7 visible light communication (VLC). By using three parameters such as number of backoff times (NB), backoff exponent (BE) and contention window (CW), we provide priority for multi-level differentiated service applications. We consider beacon-enabled VLC personal area network (VPAN) mode with slotted version for random access algorithm in this paper. Based on a discrete-time Markov chain, we analyze the performance of proposed mechanism under non-saturation environments. By building a Markov chain model for multi-parameters, this paper presents the throughput and transmission delay time for VLC system. Numerical results show that we can apply three parameters to control the priority for VLC MAC protocol.

Exploiting cognitive wireless nodes for priority-based data communication in terrestrial sensor networks

  • Bayrakdar, Muhammed Enes
    • ETRI Journal
    • /
    • v.42 no.1
    • /
    • pp.36-45
    • /
    • 2020
  • A priority-based data communication approach, developed by employing cognitive radio capacity for sensor nodes in a wireless terrestrial sensor network (TSN), has been proposed. Data sensed by a sensor node-an unlicensed user-were prioritized, taking sensed data importance into account. For data of equal priority, a first come first serve algorithm was used. Non-preemptive priority scheduling was adopted, in order not to interrupt any ongoing transmissions. Licensed users used a nonpersistent, slotted, carrier sense multiple access (CSMA) technique, while unlicensed sensor nodes used a nonpersistent CSMA technique for lossless data transmission, in an energy-restricted, TSN environment. Depending on the analytical model, the proposed wireless TSN environment was simulated using Riverbed software, and to analyze sensor network performance, delay, energy, and throughput parameters were examined. Evaluating the proposed approach showed that the average delay for sensed, high priority data was significantly reduced, indicating that maximum throughput had been achieved using wireless sensor nodes with cognitive radio capacity.

A Double-Ended Priority Queue with O(1) Insertion Amortized Time (상수 삽입 전이 시간을 가지는 양단 우선순위 큐)

  • Jung, Hae-Jae
    • The KIPS Transactions:PartA
    • /
    • v.16A no.3
    • /
    • pp.217-222
    • /
    • 2009
  • Priority queues can be used in applications such as scheduling, sorting, retrival based on a priority like gene searching, shortest paths computation. This paper proposes a data structure using array representation for double-ended priority queue in which insertion and deletion takes O(1) amortized time and O(logn) time, respectively. To the author's knowledge, all the published array-based data structures for double ended priority queue support O(logn) time insertion and deletion operations.

The Decision of Order Priority of HUD Contents for Public Transit (대중교통 HUD 콘텐츠 우선순위 결정에 관한 연구)

  • Park, Bumjin;Kang, Weoneui;Kim, Taehyeong
    • International Journal of Highway Engineering
    • /
    • v.15 no.1
    • /
    • pp.135-141
    • /
    • 2013
  • PURPOSES: In this study, as part of an effort to develop HUD for public transit, it is proposed that the decision of order priority of contents which will be disposed to bus drivers through HUD for public transit using AHP(Analytic Hierarchy Process) technique. METHODS: In AHP analysis method brainstorming, factor analysis, hierarchical structuring, and weighting analysis were performed by applying a classical analysis method. RESULTS: By the result of analysis it is shown that unlike car drivers, bus drivers prefer information related to bus intervals, bus stop, and door open and close to information related to vehicle running. Also, bus stop information and bus interval information were ranked as first and second place in order priority of HUD contents for public transit by experts. CONCLUSIONS: This method of selecting order priority of HUD contents for public transit can provide a basic foundation for selecting order priority of traffic information contents as well as other HUD contents.

Performance Analysis of ATM Switch Using Priority Control by Cell Transfer Ratio (셀 전송비율에 의한 우선순위 제어방식을 사용한 ATM 스위치의 성능 분석)

  • 박원기;김영선;최형진
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.32A no.12
    • /
    • pp.9-24
    • /
    • 1995
  • In this paper, we proposed and analysed two kinds of priority control mechanism to archive the cell loss rate requirement and the delay requirement of each class. The service classes of our concern are the high time priority class(class 1) and the high loss priority class(class 2). Two kinds of priority control mechanism is divided by the method of storing the arriving class 2 cell in buffer on case of buffer full. The first one is the method which discarding the arriving class 2 cell, the second one is the mothod which storing the arriving class 2 cell on behalf of pushing out the class 1 cell in buffer. In the proposed priority schemes, one cell of the class 1 is transmitted whenever the maximum K cells of the class 2 is transmitted on case of transmitting the class 1 cell and the class 2 cell sequentially. In this paper, we analysed the cell loss rate and the mean cell delay for each class of the proposed priority scheme by using the Markov chain. The analytical results show that the characteristic of the mean cell delay becomes better for the class 1 cell and that of the cell loss rate becomes better for the class 2 cell by selecting properly the cell transfer ratio according to the condition of input traffic.

  • PDF

Development of the Priority Decision System for Redevelopment of Agricultural Reservoir (농업용저수지 재개발 우선순위 산정시스템 개발)

  • Kim, Hae-Do;Kim, Sun-Joo;Kim, Phil-Shik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.53 no.2
    • /
    • pp.45-52
    • /
    • 2011
  • This study is to develop a Priority Decision System for Redevelopment (PDSR) which is able to decide the priority for redevelopment of agricultural reservoirs. The major scopes of this research are to make the related GIS data like hydrologic unit map and other thematic maps to determine the suggested priority index (PI), and to develop the PDSR handling the GIS data and calculating weighing factors for the PI. In order to make the weighing factor decision module, the AHP technique was adopted. The result of the weighing factor calculation was showed PC (Possibility Criteria) and RC (Restriction Criteria) were 76% and 24% respectively. Which means that most of the specialist selected PC category prior to RC because of whom to mostly of major technique. So, in order to make more objective result, the selection of specialists is important like environmental activists or local residents and so on. The product from this research can provide more scientific support to decide the priority decision.

A Study on Criteria for investment Priority of Railway Project (철도건설 투자우선순위에 관한 연구)

  • Park, Il-Ha;Park, Yong-Gul;Kim, Si-Gon
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.112-116
    • /
    • 2008
  • Determining the investment priority of the railway project is essential to keep its object of railway investment. [National railway construction plan] provide 4 major evaluation indicators and their weighting range in determining the investment priority of railway construction. Which are investment efficiency, inter-regional balance of development, network effects, government supporting policy. However this present criteria has inconsistency in determining economical feasibility of the railway transportation when applying the same evaluation indicator, investment efficiency, with the road transportation. The railway transportation is superior to road transportation in terms of transportation capacity and distance, while offering less carbon emissions. In spite of the prominent position of the railway transportation, it can be failed to obtain its proper investment priority when being determined under economical feasibility based. Therefore, this study analyzed the inconsistency under present evaluation criteria and proposed new evaluation method for the investment priority of the railway construction using AHP(analytic hierarchy process), while differentiate from the road construction. This method is optimized for only determining the priority of the railway construction itself under object of railway investment respectively.

  • PDF

Analysis of Relative Importance and Priority of Civil Servant's Education Training Policy: Using Analytic Hierarchy Process (AHP) Method (공무원교육훈련정책의 상대적 중요도와 우선순위 분석: 계층의사결정방법(AHP)을 활용하여)

  • Park, Jong-Deuk
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.4
    • /
    • pp.263-272
    • /
    • 2012
  • In an attempt to analyze the policy priority on civil servant's education training policy as human resource management in this study, a positive analysis with the experts using AHP method was conducted. Summarizing the outcome of the study; First, in terms of relative priority of the evaluation elements by sector, the education training operation system, among education training program, education training evaluation, and education infrastructure, was analyzed as the most important element. Second, as a result of analyzing the priority of detail sectors of civil servant's education training, Action learning education program was proved to be the top priority project education training program aspect and education training operation system was also evaluated as the top priority project in education training agency budget expansion aspect, education training and personnel administration link was evaluated as the top priority project education training evaluation, and trainer secure was proved to be the top priority education infrastructure. Such outcome of the project is expected to make commitment for evaluating the civil servant's education training policy.

Making Decision of the Maintenance Priority of Power Distribution System using Time Varying Failure Rate and Interruption Cost

  • Chu, Cheol-Min;Kim, Jae-Chul;Yun, Sang-Yun
    • Journal of Electrical Engineering and Technology
    • /
    • v.4 no.1
    • /
    • pp.43-48
    • /
    • 2009
  • The purpose of the this paper is to make decision of the maintenance priority of power distribution system using Time-Varying Failure Rate(TVFR) with interruption cost. This paper emphasizes the practical use of the reliability indices and interruption cost. To make a decision of maintenance priority on power distribution system equipment, the quantification of the reliability level should be represented as a cost. In this paper, the TVFR of power distribution system equipment applied in this paper utilizes analytic method to use the historical data of KEPCO. From this result, the sensitivity analysis on TVFR of equipment was done for the priority, which represents that high priority of the equipment has more effect on system reliability, such as SAIDI or SAIFI, than other equipment. By this priority, the investment plan is established. In this result, customer interruption cost(CIC) could be extracted, and CIC is used as weighting factor to consider a importance of customer. After that, the result calculated the proposal method in this paper is compared with other priority method, such as lifetime, failure rate or only sensitivity.