• Title/Summary/Keyword: The Electric Substations

Search Result 109, Processing Time 0.03 seconds

A Study on the Loop Current Induced by Voltage Phase Difference Substations during Parallel Feeding under the Alternating Current AT Electric Power Feeding Method (교류 AT급전방식에서 병렬급전시 변전소간 전압위상차에 의한 루프전류에 관한 연구)

  • Park, Jae-Seok;Song, Joong-Ho
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1997-2004
    • /
    • 2011
  • The $2{\times}25kv$ AT electric power feeding method in the A.C. electric train adopts the one-phase power feeding method as the standard due to a voltage phase difference, and the distance between the two neighboring substations is 50km due to voltage drop. The one-phase power feeding method makes the system operation feasible, while making it unfavorable for power supply. Moreover, railroad involves large-capacity single-phase load, and if it is expected to continue to rise, it is necessary to research on measures to stabilize the supply of power to railroad cars with the existing facilities. In this study, a parallel power feeding method between neighboring substations is proposed to stabilize the supply of electric power to electric railroad cars under the 2*25kv AT power feeding method and the loop current induced by voltage phase difference between the two neighboring substations during parallel power feeding is investigated.

  • PDF

Regenerative energy analysis in DC 1500V electric traction substations (DC 1500V용 전철변전소의 회생전력량 분석)

  • Bae, Chang-Han;Jang, Dong-Uk;Kim, Young-Gi;Kim, Sung-Tae;Kim, Byung-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.836-845
    • /
    • 2007
  • In DC 1500V electric traction substations, diode rectifiers are commonly used to supply stable DC power with electric train sets. However, it operates in the first quadrant of the voltage-current plane and thus needs regenerative inverters which transfer the surplus regenerative power caused by regenerative braking of electric train sets into the grid. In order to select the proper capacity and installation position of regenerative inverter, it needs to investigate the consumed and regenerative energy of the electric traction substations in advance. This paper presents an analysis of regenerative energy in two substations operating in Seoul line 2 and Kwangju line 1. DC line voltage and feeder currents are measured for a day to calculate consumed and regenerative power for four feeders. We calculated an amount of regenerative energy consumed in other feeders and estimated the cost reduction in energy consumption due to the reuse of regenerative energy.

  • PDF

Seismic Reliability Evaluation of Electric Power Transmission Systems Considering the Multi-state of Substations (변전소의 다중상태를 고려한 송전시스템의 내진 신뢰성 평가)

  • 고현무;박영준;박원석;조호현
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2003.09a
    • /
    • pp.66-73
    • /
    • 2003
  • The technique for the seismic reliability evaluation of the electric power network is presented. In the previous study, the state of the substations was represented by the bi-state which is classified as failure or survival. However, the hi-state model can result in oversimplified analysis, because substations are worked by the parallel operating system. In this paper, Considering the characteristics of the parallel operating system, the damage of the substation is expressed by the multi-state for the more realistic seismic reliability evaluation. Using Monte-Carlo simulation method, the seismic reliability for Korean 345㎸ electric power network is evaluated. Analysis results show that reliability levels of the network by the multi-state analysis is higher than that by the hi-state analysis and the electric power network in southeastern area of the Korean Peninsular may be vulnerable to earthquakes.

  • PDF

An Effective Utilization of Regenerative Power According to the Output Voltage of Substations in the DC Electric Railways (직류전기철도 시스템에 있어서의 변전소 송출전압에 따른 회생전력유효이용)

  • Kim, Yang-Mo
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.39 no.2
    • /
    • pp.149-156
    • /
    • 1990
  • In DC electric railway systems, the feeding currrnt is not permitted to flow backward in almost all the substations and the pantograph voltages at the regenerating cars rise extremely by the voltage drop of the resistance of the feeder line. In order to prevent the overrise of the pantograph voltage in power regenerating cars, the squeezing circuits for the regenerative current are equipped and this leads to double losses, which are an extra worn-out of the brake-shoes and an ineffective use of regenerative power. In this study, the insertion of resistors in the feeder line system is proposed as a possible method for the effective utilization of the regenerative power in the electric railways. Also it is investigated how the output voltages of substations affect the effective use of regenertive capability. The investigation results show that the energy savings and the reduction of the worn-out of the brake-shoe can be achieved at the same time by the insertion of resistors in the feeder line system.

  • PDF

Determining the Capacity and Installation Positions of Regenerative Inverters at DC 1500V Electric Railway Substations (직류 1500V 전기철도용 변전소의 회생인버터 용량 및 설치위치 선정 방법)

  • Bae, Chang-Han;Han, Moon-Seub;Kim, Yong-Ki;Kwon, Sam-Young;Park, Hyun-June
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.55 no.9
    • /
    • pp.478-484
    • /
    • 2006
  • The paper presents methods of determining the capacity and installation positions of regenerative inverters installed in DC 1500V electric railway system. We suggested a method that approximates using parameters related to substations where regenerative inverters are installed, railway lines and operating motor cars, and another that calculates using regenerative power obtained from Train performance Simulation (TPS) and Power Flow Simulation (PFS). We carried out TPS and PFS for Seoul Subway Line $5{\sim}8$, calculating regenerative power and determining substations where regenerative inverters would be installed and the optimal capacity and number of inverters to be installed.

Measurement and Analysis of Regenerative Energy in DC 1500V Electric Traction Substation (직류 1500V 전철변전소의 회생전력량 측정 및 분석)

  • Bae, Chang-Han;Jang, Dong-Uk;Kim, Ju-Rak;Han, Moon-Seub;Kim, Yong-Ki
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.6
    • /
    • pp.717-722
    • /
    • 2007
  • Most of DC 1500V electric railway substations have adopted diode rectifiers to supply stable DC power. However, the diode rectifiers operate in the first quadrant of the voltage-current plane and thus need regenerative inverters which transfer the surplus regenerative power caused by regenerative braking of electric train sets into the grid. In order to select the proper capacity and installation position of regenerative inverter, it needs to investigate the consumed and regenerative energy of the electric traction substations in advance. This paper presents an analysis of regenerative energy in two substations operating in Seoul Seolleung and Kwangju Yangdong substations. DC line voltage and feeder currents are measured for a day to calculate consumed and regenerative power far four feeders. We calculated an amount of regenerative energy consumed in other feeders and estimated the cost reduction in energy consumption due to the reuse of regenerative energy

Measurement and Analysis of Electric Field near 345/154kV UHV Overhead Transmission Lines and Substations (345/154kV 초고압 송변전설비 주변에서의 전장의 측정과 분석)

  • Lee, J.G.;Ahn, C.H.;Lee, B.H.;Kil, G.S.;Park, D.H.
    • Proceedings of the KIEE Conference
    • /
    • 1996.07c
    • /
    • pp.1861-1863
    • /
    • 1996
  • In this paper, measurements and analyses of ELF electric fields in the vicinity of UHV overhead transmission lines and substations have been conducted. Planar-type sensors have been developed with special consideration of picking up lower frequency and spatial components without any distortion. So finally the electric field measuring system has the frequency bandwidth of 7[Hz] to 2.7[MHz] and the response sensitivity of 0.094[mV/V/m]. A brief description of design rules of the measuring system and measurement procedures is introduced. The actual survey near 154 and 345[kV] overhead transmission lines and power subststions was carried out and analyzed. It may be inferred from these results that the electric field intensity exeeds 7[kV/m] only in very few cases particularly at the substations so that the field measurements meet almost limits or guidelines that various authorized international institutes recommend.

  • PDF

The Application of Preventative and Diagnostic System for 765kV Substation (변전기기 예방진단 시스템의 적용 - 765kV 변전소 예방진단 시스템)

  • Hweon, D.J.;Choi, I.H.;Yoo, Y.P.;Jung, S.H.;Choi, Y.J.;Choi, D.H.;Kim, K.K.
    • Proceedings of the KIEE Conference
    • /
    • 2000.07c
    • /
    • pp.1885-1887
    • /
    • 2000
  • In this paper we introduce preventative and diagnostic systems developed to prevent substations from accidental fault of electric power transmitting apparatus. We propose monitoring and diagnostic system for ultra high voltage GIS and main transformer of 765kV substations as an example of preventative and diagnostic techniques being applied in Korea. We also present a guideline to construct and manage an expert system for this purpose. Finally, an engineering solution as a substation management support system is proposed.

  • PDF

A Study on the Emergency and Recovery AC/DC Combination Lamps in the Electric Substations (변전소의 AC/DC 겸용 비상 및 복구 등에 관한 연구)

  • Park, Joon-Yeol;An, Youn-Ki;Kim, Jong-Soo;Shin, Hye-Young
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.6
    • /
    • pp.27-34
    • /
    • 2010
  • This study is for the improvement in the equipment environment of the emergency and recovery lamps in electric substations. To solve problem about the weak illuminance of existing emergency lamps, the AC/DC combination lamps and switches are reviewed. And the improved illuminance standards that are divided each room's purpose are suggested. It is based on a nuclear power plant's Illuminance Standards and a safety lamp's Illuminance Standards of Illuminance Standards Korean Industrial Standards - KS A 3011 -, not just 5~10[%] in according with normal lamp's illuminance. Lastly, The experiments are conducted to prove the suggested contents on this study. Consequently, a battery capacity is not increased, but illuminance of emergency and recovery lamps can be increased.

Analysis of regenerative power substations, railway (도시철도 변전소 회생전력 분석에 관한 연구 - 서울도시철도 전력공급소 전력분석을 중심으로 -)

  • Lee, Jun-Sang;Park, Jong-Hun;Seo, Suk-Chul;Kim, Jin-Young;Kim, Gi-Chun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3117-3123
    • /
    • 2011
  • An Electric railway system has the characteristics. The train powered by substations generates regenerative power when it runs on railway of various slope. A regenerative braking is an ideal system on account of reducing mechanical braking as well as recycling the energy. In this study, Seoul Metropolitan Rapid Transit (substation) Precision analysis of the power of the electric car was carried out. Through this use of power substations, power supplies and trains through the regenerative power of the data analysis was performed utilizing research-based work.

  • PDF