• 제목/요약/키워드: Test field

검색결과 9,479건 처리시간 0.042초

수압파쇄 현장시험을 통한 국내 지반의 초기응력 분포양상 해석 (Analysis of In-Situ Stress Regime from Hydraulic Fracturing Field Measurements in Korea)

  • 최성웅
    • 산업기술연구
    • /
    • 제28권B호
    • /
    • pp.111-116
    • /
    • 2008
  • Since the hydraulic fracturing field testing method was introduced first to Korean geotechnical engineers in 1994, there have been lots of progresses in a hardware system as well as an interpretation tool. The hydrofracturing system of first generation was the pipe-line type, and it has been developed to a wire-line system at their second generation. The current up-to-date system is more compact and is able to be operated by all-in-one system. With a progress in a hardware system, the software for analyzing in-situ stress regime has also been progressed. The shut-in pressure, which is the most ambiguous parameter to be obtained from hydrofracturing pressure curves, can now be acquired automatically from the various methods. While the hardware and software for hydrofracturing tests are being developed during the last decade, the author could accumulate the field test results which can cover the almost whole area of South Korea. Currently these field data are used widely in a feasibility study or a preliminary design step for tunnel construction in Korea. Regarding the difficulties in a site selection and a test performance for the in-situ stress measurement at an off-shore area, the in-situ stress regime obtained from the field experiences in the land area can be used indirectly for the design of a sub-sea tunnel. From the hydrofracturing stress measurements, the trend of magnitude and direction of in-situ stress field was shown identically with the geological information in Korea.

  • PDF

자기장을 이용한 매설배관의 위치탐지에 관한 연구 (A Study on the Detecting Method for Underground Pipes Using Magnetic Field)

  • 배봉국;양연순;송춘호;석창성
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2001년도 추계학술대회논문집A
    • /
    • pp.32-37
    • /
    • 2001
  • As increasing underground facilities, more effective management is needed nowadays. It is important to get an accurate information of underground facilities to manage that, so some methods of detecting location - electromagnetic induction method, ground penetration radar method, sonic method - are used to obtain the information of underground facilities. In this study, a magnetic method to detect underground facilities was developed. In the magnetic method, underground facilities are detected by a detector and the magnetic marker which is a permanent magnet and used to marking the location by attaching underground facilities. A proper characteristic of the magnetic marker was optimized by maxwell 20 magnetic field analysis tool, a test field was constructed with the magnetic marker, PVC pipe, and steel pipe under ground 1.5m, and the detector was made by modifying a common ferromagnetic detector. Magnetic strengths of the magnetic marker were measured by the detector at each location in the test field, and analyzed by magnetic field analysis tool in the same condition. In the result, the underground pipes were detectable within the deviation ${\pm}20cm$ at PVC pipe and ${\pm}10cm$ at steel pipe respectively. The steel pipe was more detectable by ferromagnetism. The developed magnetic method can be applied to maintain and manage underground facilities.

  • PDF

Experimental and numerical study on generation and mitigation of vortex-induced vibration of open-cross-section composite beam

  • Zhou, Zhiyong;Zhan, Qingliang;Ge, Yaojun
    • Wind and Structures
    • /
    • 제23권1호
    • /
    • pp.45-57
    • /
    • 2016
  • Open-cross-section composite beam (OCB) tends to suffer vortex-induced vibration (VIV) due to its bluff aerodynamic shape. A cable-stayed bridge equipped with typical OCB is taken as an example in this paper to conduct sectional model wind tunnel test. Vortex-induced vibration is observed and maximum vibration amplitudes are obtained. CFD approach is employed to calculate the flow field around original cross sections in service stage and construction stage, as well as sections added with three different countermeasures: splitters, slabs and wind fairings. Results show that flow separate on the upstream edge and cause vortex shedding on original section. Splitters can only smooth the flow field on the upper surface, while slabs cannot smooth flow field on the upper or lower surface too much. Thus, splitters or slabs cannot serve as valid aerodynamic means. Wind tunnel test results show that VIV can only be mitigated when wind fairings are mounted, by which the flow field above and below the bridge deck are accelerated simultaneously.

제체재료로서 국내 하상토의 현장다짐특성 (Field Compaction Characteristics of Domestic Bed Sediment as Levee Fill Material)

  • 김진만;김경민;최봉혁;이대영
    • 한국지반공학회논문집
    • /
    • 제24권10호
    • /
    • pp.113-120
    • /
    • 2008
  • 하천제방 축조를 위한 많은 양질의 성토재료는 시공헌장에서 쉽게 구하기 어려우며, 하천제방의 경제성 및 안정성에 있어서 가장 중요한 요인이라 할 수 있다. 따라서 경제적이고 안정적인 하천제방을 축조하기 위해서는 하상재료를 이용한 제방축조기술의 연구가 필수적이며 이를 위해서는 하상재료에 대하여 현장시험을 통한 설계 및 시공방법, 공학적 특성 분석이 요구되어진다. 본 연구에서는 대구 현풍천의 하상토(SP)를 대상으로 원재료 및 양질토인 화강풍화토(SW)와의 혼합에 따른 현장 다짐에 따른 공학적 특성을 평가하고 현장 혼합방법을 제시하였다.

독립형 풍력기반 Smart Microgrid 시스템의 현장 실증 시험을 위한 도서지역 전력 및 경제성 시뮬레이션 (Power and Economic Simulation of Island for the Field Demonstration Test of Smart Microgrid System Based on Stand-alone Wind power)

  • 강상균;이은규;이장호
    • 신재생에너지
    • /
    • 제10권3호
    • /
    • pp.22-30
    • /
    • 2014
  • The isolated self-generating electricity with diesel engine generator has been used in islands far away from main land. It costs high because of increasing oil price, and unsafe to have supplying oil and its related components by ship due to unexpectable marine conditions. Therefore there is the need for the hybrid system of renewable energy like wind or solar energy systems with oil engine generator, which can reduce oil use and extend oil supplying period. In this study, the feasibility of such hybrid system with smart micro grid on the eight islands of Jeon-nam province is surveyed to find good place for the demonstration test of the hybrid system. In each island, 3 wind turbine systems of 10 kW and photovoltaic of 20 kW are tested with already installed diesel engine. The performance and costs of the hybrid system in each island are compared in the given conditions of solar and wind energy potential. As a result of the study, Jung-ma island is recommended for the optimum place to make real field demonstration test of isolated hybrid generating and smart grid systems.

자체 제작한 시험장에서의 GPR의 매설물 검출능력에 관한 측정 (Detectability Measurement of GPR for Buried Target in Self-Designed Test Field)

  • 손수정;신병철
    • 비파괴검사학회지
    • /
    • 제20권4호
    • /
    • pp.322-328
    • /
    • 2000
  • 730MHz의 고정 주파수를 방사하는 3소자 안테나 방식의 GPR을 이용하여 자체 제작한 시험장 속에 매설된 다양한 시험편의 검출능력을 조사하였다. 여러 가지 상황에 대한 검출능력을 알아보기 위하여 매설물의 재질, 크기, 매설 깊이에 차이를 두어 실험을 수행하였다. 레이다파의 전파속도를 조절하여, B-scan상의 쌍곡선 패턴의 위치를 실제 매설한 깊이에 정확하게 위치하게 함으로써, 실험결과로부터 얻은 soil(dry)에서의 레이다파의 전파속도가 기존 data와 유사함을 확인하였다.

  • PDF

초고압 지중케이블 장기신뢰성 실증시험장 구축 (Test-Field Construction for Long-term Reliability of EHV Underground Transmission Cable)

  • 김진;강지원;장태인;양병모;박준우;박흥석;윤형희
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.383_384
    • /
    • 2009
  • After the 1970s, the importance of underground transmission systems increased and the construction rate of underground transmission lines also showed increasing trends each year, especially in metropolitan areas. Accordingly the social ripple effects are very large and wide when the fault occurs in underground power system, and the amount of time and money spent to restore the system also increases. So we must ensure stable operation and long-term reliability of the facilities. In Korea's case, long-term reliability tests for EHV power cables and accessories progressed poorly because equipment was not compatible for long-term reliability tests. Therefore we planned to construct a long-term reliability test field for EHV underground cables in order to ensure international quality reliability and optimal power cable operation techniques. The Gochang Underground Cable Test Field is under construction, funded by the Korean government, the govenment's union investment department, KEPCO, KERI and three private cable corporations. This project began in March, 2005 and will be completed by February, 2010. It is designed to promote joint research by incorporating several types of test equipment, construction of operating facilities, and being an internationally certified authority.

  • PDF

아크쉴드가 없는 진공인터럽터의 유한요소해석 및 뇌임펄스 성능 (Simulation and Light Impulse Test Results of Shieldless Vacuum Interrupter)

  • 윤재훈;김성일;김병욱;문기림;임기조
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2010년도 하계학술대회 논문집
    • /
    • pp.45-45
    • /
    • 2010
  • This paper discusses the simulation and LI(light impulse) test of the shieldless vacuum interrupter concept. The shields of vacuum interrupter play an important role in absorbing the metal vapor. But shield distort the electric field distribution of inner vacuum interrupter. Therefore, the insulation efficiency will improve. if shield of vacuum interrupter inside does not exist. As a result, FEM simulation show that improve distribution of electrical field and equi-potential line. But LI test result dissimilar to FEM simulation result. Shieldless vacuum interrupter model lower BIL(breakdown impulse light) than vacuum interrupter have installed shield. Because conditioning process occurred metal vapor. This paper compared that FEM analysis and LI test of installed shield model and shieldless model.

  • PDF

저온 환경에서의 조기강도 발현을 위한 콘크리트 포장 배합 연구 (A Study on Mix Design of Concrete Pavement on Early Strength Development in Cool Weather Condition)

  • 류성우;김진환;홍승호;박제진
    • 한국도로학회논문집
    • /
    • 제19권3호
    • /
    • pp.1-10
    • /
    • 2017
  • PURPOSES : This paper focuses on strength development according to the mix design with cement type and mineral admixture from laboratory and field tests in cool weather. METHODS : Two methods evaluated the mix design of concrete pavement in cool weather. Firstly, laboratory tests including slump, air contents, setting time, strength, maturity, and freezing-thawing test were conducted. Three alternatives were selected based on the tests. Secondly, a field test was conducted and the optimum mix design in cool weather was suggested. RESULTS : It is an evident from the laboratory test that a mix with type III cement showed better performance than the one with type I cement. There was a delay in strength development of a mix with mineral admixture compared to mix design without any mineral admixture. In the field test, type III cement+flyash 20% mix design proved the best performance. CONCLUSIONS : For concrete pavement in cool weather, mix design using type III cement could overcome the strength delay due to mineral admixture. Moreover, it is possible to make sure of durability of pavement. Therefore, strength and durability problems due to cool weather would decrease.

수정 Ramberg-Osgood 모델을 이용한 널말뚝의 관입속도 예측 (Prediction of Penetration Rate of Sheet Pile Using Modified Ramberg-Osgood Model)

  • 이승현;김병일;김주철;김정환
    • 한국지반공학회논문집
    • /
    • 제26권1호
    • /
    • pp.55-62
    • /
    • 2010
  • 진동타입기에 의해 시공되는 강널말뚝의 관입속도를 예측하고자 수정 Ramberg-Osgood 모델을 적용하여 진동타입기의 주기운동에 따른 지반의 동적 저항력을 모사하고자 하였다. 수정 Ramberg-Osgood 모델을 규정짓는 다양한 인자는 현장시험을 통해 구한 동적 지반저항력곡선의 양상을 반영하여 결정하였는데 이때 매개변수로는 표준관입시험값(N값)을 이용하였다. 관입속도는 해석결과가 현장시험결과에 비해 작게 계산되었으며 관입깊이에 따른 관입 소요시간은 해석결과가 현장시험결과에 비해 크게 계산되어 해석결과가 현장시험결과에 비해 보수적인 값을 보여주었다.