• Title/Summary/Keyword: Test Equipment

Search Result 3,389, Processing Time 0.031 seconds

Correction Method of High-precision Signal for Aircraft Automatic Test Equipment Using Least Squares Method (최소자승법을 이용한 비행체 자동점검장비의 고정밀 신호 보정 방안)

  • Lee, Seong-woo;Kim, Dong-hyouk;Kim, Seong-woo;Seo, Min-gi;Lee, Cheol-hoon
    • Journal of Advanced Navigation Technology
    • /
    • v.22 no.2
    • /
    • pp.64-69
    • /
    • 2018
  • Automatic test equipment for field maintenance of aircraft mounted equipment is effective for integrated design when operating a small number of aircraft for special purposes. The integrated automatic test equipment identifies commonly used interfaces and is used for branching or generating routes for each unit under test specific inspection. High-precision signals such as RTD, TC, and analog voltage can cause measurement errors due to conduction resistance during signal branching and connection when generating branches and paths. The measurement error caused by the resistance of the wire leads to a lot of restrictions in designing the equipment to be inspected. In this paper, we propose a method of calibrating highly accurate signals of an integrated automatic inspection equipment that minimizes measurement errors of analog voltage and high - precision signals.

Evaluation of Flexural Strength of 3D Printing Resin According to Post-Curing Equipment and Time (후경화기와 경화시간에 따른 3D 프린팅 레진의 굴곡강도 평가)

  • Hae-Bom Kim;Jae-Won Choi
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.4_2
    • /
    • pp.629-637
    • /
    • 2023
  • This study aimed to evaluate the effect of post-curing equipment and time on the flexural strength of 3D printing resins produced by a liquid crystal display(LCD) printer. The three 3D printing resins(DENTCA Denture Teeth, DT; C&B 5.0 hybrid, CH; C&B Permanent A2, CP) were divided into four groups according to post-curing time(10 min and 30 min) and equipment with or without vacuum treatment. For the three-point flexural strength test and biaxial strength test were prepared by method according to ISO 10477, ISO 6872, respectively. Flexural strength was measured with universal testing machine. Comparison between post-curing time of each post-curing equipment was analyzed by independent sample t-test and Mann-Whitney U test(α=.05), and comparison between groups according to each 3D printing resin was performed by Kruskal-Wallis test and post-hoc by Bonferroni-Dunn test(α=.05). The flexural strength of the resin post-curing under vacuum was higher than that of the resin post-curing in air. In the comparison according to the post-curing time, in the case of the post-curing equipment without vacuum, the 30 minute curing time showed significantly higher flexural strength than the 10 minute curing time, except for the biaxial flexural strength of CH(P<.05). In the post-curing equipment with vacuum, the three-point flexural strength of all 3D printing resins(DT, CH, and CP) showed a higher value at 30 minute curing time than at 10 minute curing time.

A Study on the Reliability Assesment of Solar Photovoltaic and Thermal Collector System (태양광열 시스템의 신뢰성 평가에 관한 연구)

  • Park, Tae-Kook;Bae, Seung-Hoon;Kim, Sang-Kyo;Kim, Seon-Min;Kim, Dae-Hwan;Eom, Hak-Yong;Lee, Keun-Hui
    • New & Renewable Energy
    • /
    • v.16 no.4
    • /
    • pp.49-64
    • /
    • 2020
  • Photovoltaic and Thermal collector (PV/T) systems are renewable energy devices that can produce electricity and heat energy simultaneously using solar panels and heat exchangers. Since PV/T systems are exposed to the outdoors, their reliability is affected by various environmental factors. This paper presents a reliability test for a PV/T system and evaluates the test results. The reliability assessment entails performance, environment, safety, and life tests. The factor that had the greatest influence on the life of the system was the hydraulic pressure applied to the heat exchanger. A test was conducted by repeatedly applying pressure to the PV/T system, and a reliability analysis was conducted based on the test results. As a result, the shape parameter (β) value of 5.6658 and the B10life 308,577 cycles at the lower 95% confidence interval were obtained.

Development of Test-Equipment for AUVs' Navigation Performance Pre-verification (자율무인잠수정의 항법성능 사전 검증을 위한 시험치구 개발)

  • Hansol Lee;Gwonsoo Lee;Ho Sung Kim;Kihwan Choi;Jinwoo Choo;Hyungjoo Kang
    • The Journal of Korea Robotics Society
    • /
    • v.18 no.4
    • /
    • pp.472-480
    • /
    • 2023
  • This paper describes the development of a test-equipment for the pre-verification of navigation performance in cluster-based AUVs (Autonomous Underwater Vehicle). In the development of an AUV, conducting hardware and software development sequentially is not efficient due to the limited research and development period. Therefore, in order to reduce the overall development time and achieve successful development results, it is essential to pre-validate the navigation system and navigation algorithms. Accordingly, this paper explains the test-equipment for pre-verification of navigation performance, and ultimately confirms the stability of the navigation system and the performance of the navigation algorithms through the analysis of five types of navigation sensor data stored during real-sea experiments. The results demonstrate that through the development and verification of the test-equipment, it is possible to shorten the overall development period and improvement of product quality in the process of developing multiple AUVs.

Development and Simulation Verification of Operation System for Mobile ESS Test Equipment (ESS 이동형 시험장비용 운영시스템의 개발과 모의검증)

  • Shin, Je-Seok;Han, Hyun-Gyu;Kim, Jin-Tae;Lee, Seung-Min;Park, Chan-Wook;Lim, Geon-Pyo
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.67 no.3
    • /
    • pp.168-174
    • /
    • 2018
  • The performance test for 376MW ESS for frequency regulation currently operating in 13 substations is conducted based on the test procedure in the first and second steps. In the first step, components of ESS is moved to the certification authority where the test equipment is located in order to be proceeded with the test. In the second step, the performance test is conducted manually for the ESS equipments installed on site using the movable measurement equipment, and thus it can only be performed on some limited test items and requires a lot of time and manpower. Therefore, mobile test equipment for ESS(MOTES) is being developed that can perform automatically more test items for ESS in the field using the MOTES, and reduce manpower and time. To do this, an algorithm and a prototype of the operating system(MOS) are also being developed that can control MOTES automatically. In this paper, a development of the MOS prototype is introduced and then a simulation is performed to verify the prototype and its algorithm before the field demonstration.

Kinematics Analysis of a 5-Axis Ultrasonic Inspection Equipment (5축 초음파 검사장비의 기구학 해석)

  • Han, Myung-Chul;Sung, Chang-Min
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.32 no.1
    • /
    • pp.89-96
    • /
    • 2015
  • In this paper, it is studied that kinematic analysis of a 5-axis ultrasonic inspection equipment. The equipment is comprised of three straight axes and two rotary axes. With features of ultrasonic, the transmitter and receiver of the equipment are vertical to a test surface, operating at regular intervals. To perform this well, the motions of every link should be found on the based of kinematic analysis of the equipment. We chose starting point for testing and defined relations among all links through transformation of coordinates. For double curvature-shaped test object, we generated test paths. To follow these, we found motions of all links using inverse kinematics. By using Matlab/Simulink, simulator was developed, so that we could find out desired trajectories of main axes for a scan.

A Study on the Design and Verification-Validation of the Supportive Equipment for Shipyard Test of Naval Combat System (함정 전투체계 함상시험을 위한 지원장비 설계 및 검증 연구)

  • Jung, Youngran;Kim, Cheolho;Han, Woonggie;Kim, Jaeick;Kim, Hyunsil
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.17 no.3
    • /
    • pp.318-326
    • /
    • 2014
  • The Shipyard Test of Naval Combat System depends on external factors, such as weather conditions and availability of its sensor-weapon, due to the need of on-board sensor-weapon during the test. This paper suggests the Supportive Equipment using virtual simulator for Shipward Test, in case of the unavailability of the on-board sensor-weapon or the test support force(aircraft, surface ship etc.), to pre-check the functions of the combat system as well as to prepare the Shipyard Test. To mock the real sensor-weapon functions as similar as possible, the Supportive Equipment for Shipyard Test was verified by the Verification and Validation process, which is usually performed while developing models in the Modeling & Simulation field.

Characteristic Analysis and Implementation of 30kW Portable Test Equipment for Performance Evaluation in Energy Storage System (30kW급 ESS용 이동형 성능평가 시험장치의 구현 및 특성분석)

  • Park, Jea-Bum;Kim, Mi-Sung;Rho, Dae-Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.6
    • /
    • pp.715-723
    • /
    • 2018
  • The energy storage system consists of batteries, power conditioning system and energy management system. If ESS is installed and operated in the field, SAT(Site Acceptance Test) of ESS is being essentially required for the safety and performance of ESS. Furthermore, in order to more accurately and reliably validate the performance of the ESS in advanced countries, it has been required to perform not only performance testing by H/W equipments but also performance verification by S/W tool. Therefore, this paper proposes the modeling of portable test equipment in order to evaluate the performance and reliability of ESS by using the PSCAD/EMTDC S/W. And also, the prototype of 30[kW] scaled portable test equipments is implemented based on the S/W modeling. From the results of various simulations and testings such as power quality, LVRT and anti-islanding tests, it is confirmed that 30[kW] scaled portable test equipment is useful for SAT of ESS, because the simulation results of PSCAD/EMTDC are identical to them of 30[kW] test equipment at the same test conditions.

Interface Test Method for Communications and Broadcasting Satellite Payload (통신방송위성 탑재체 정합시험 방법에 관한연구)

  • 김신홍;김인준;최완식;이성팔
    • Proceedings of the IEEK Conference
    • /
    • 2002.06a
    • /
    • pp.291-294
    • /
    • 2002
  • This paper proposed interface test method for performance verification of communication and broadcasting satellite between communication and broadcasting satellite payload and EGSE(Electrical Ground Support Equipment). We need ground support equipment for test them to performance verification and conform interface function of payload. This paper define tile telemetry transfer method for control payload using GSE(Ground Support Equipment) and receive telemetry data collected from GSE through bus simulator

  • PDF

A Study on Maximum Speed Test for On-board Signalling Equipment in HEMU-400x (차세대고속열차 차상신호장치 최고속도 시험방안에 관한 연구)

  • Shin, Duc-Ko;Lee, Jae-Ho;Lee, Kang-Mi;Kim, Yong-Kyu;Park, Choon-Soo
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.5
    • /
    • pp.670-677
    • /
    • 2009
  • This paper is a study of testing on-board signalling equipment in advanced high speed rail at the maximum speed of 400km/h. The on-board signalling equipment in advanced high speed rail provides operating information to the driver when operating at ATC, ATS, and ATP sections, and maintains safety from driver oversight, signalling equipment malfunction, natural disasters and so on. Since the testing train performance of advanced high speed rail at 400km/h must include the function test of on-board signalling equipment, this thesis focuses on the function test of on-board signalling equipment and analyze the necessity of the test at the maximum speed. Finally, it is suggested to change some infrastructure and to use specific test methods to test the train performance at the maximum speed in high speed line ATC section.