• Title/Summary/Keyword: Tensioning Method

Search Result 107, Processing Time 0.02 seconds

Behaviour of Space Truss Erected by Post-tensioning (포스트텐션에 의해 시공된 공간 트러스의 거동)

  • 김진우
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2000.10a
    • /
    • pp.204-209
    • /
    • 2000
  • This paper suggests that post-tensioned and dome-shaped space truss formed by post-tersionong is easy to fabricate in construction process. In particular, a laboratory model is used to show how a flat space truss system can be transformed into a dome-shaped space truss by means of post-tensioning. There are some diserpancy in vertical displacement of the dxperiment and theoretical analysis for space truss. Nonlinear analysis is used to predict the final shape shape of the space truss, the experiments tndicates that this construction method can offer economy over traditional methods. In addition, the analysis indicates that when all the sxisting mechanisms are controlled, the nonlinear finite element method is more reliable way to predict the shape of the dome-shaped space truss than the linear analysis.

  • PDF

Behaviour Characteristic of Grid Dome Shaped Space Structures by Post-tensioning (포스트텐션에 의한 격자 돔형 공간 구조의 거동 특성)

  • 김진우
    • Journal of Ocean Engineering and Technology
    • /
    • v.16 no.1
    • /
    • pp.41-45
    • /
    • 2002
  • This paper is concerned with the erection and ultimate load test of dome shaped space structures by post-tensioning. It is a fast and economical method for constructing such a dome by post-tensioning of the cable in bottom chords. This structure consists of uniform pyramids in a flat layouts on the ground, and then the structure is shaped and erected into its final curved space structure. Ultimate load test was performed for dome shaped space structures. The feasibility of the proposed erection method and the reliability of the established geometric model were confirmed with numerical analysis and experimental investigation on a small scale steel model. As a results we can find the most reasonable modeling technique for the prediction of shape formation in practices and we can know the characteristic of the behaviour in ultimate load test for practical design purposes.

Shaping Formation and Behaviour Characteristic for SCST Structure by Cable-tensioning (Cable-tensioning에 의한 SCST 구조의 형상 형성과 거동 특성)

  • Kim, Jin-Woo;Kwon, Min-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6A
    • /
    • pp.819-825
    • /
    • 2008
  • This paper describes the shaping formation and the erection of SCST structure by cable-tensioning. It could be a fast and economical method for constructing the space structure consisted with uniform pyramids by cable-tensioning of the cable in bottom chords. In the initial layout, the top chords and web members are left at their true length, the bottom chords are given gaps in proportion to the desired final shape. The feasibility of the proposed shaping method and the reliability of the established geometric model were confirmed with nonlinear finite element analysis and an experimental investigation on small scale and full size test models. As a result, the behaviour characteristic of MERO joint is very significant in shaping analysis of space structure. This study suggests the most reasonable modeling technique for the prediction of shaping in practices. And it is shown the characteristic of the behavior in shaping test for practical design purposes.

Evaluation of Cable Tension Forces Using Vibration Method for a Cable-stayed Bridge under Construction (진동법을 이용한 사장교의 시공 중 장력 평가)

  • Cho, Soojin;Yun, Chung-Bang;Sim, Sung-Han
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.2
    • /
    • pp.38-44
    • /
    • 2014
  • When a cable-stayed bridge is under construction, the cable tension that changes according to the construction phase is the index indicating the proper construction management. In this study, the vibration method using the least-square estimation has been implemented to monitor changing tensions of two multi-strand cables of a cable-stayed bridge under construction. The test bridge is Hwamyung Bridge in Korea with a prestressed concrete box girder. The field tests are executed during the second tensioning stage just after the installation of the key segment. The tensions of two cables are measured before and after the tensioning and 5 days later (i.e., after finishing the tensioning of all cables). The accuracy of the estimated tensions by the vibration method has been improved by employing proper effective lengths of the cables. The measured tensions are compared with the result of the lift-off tests and design tensions. The vibration method shows very good performance in monitoring the changing tensions according to the construction phase with minimal error.

Pretension process control based on cable force observation values for prestressed space grid structures

  • Zhou, Zhen;Meng, Shao-Ping;Wu, Jing
    • Structural Engineering and Mechanics
    • /
    • v.34 no.6
    • /
    • pp.739-753
    • /
    • 2010
  • Pointing to the design requirement of prestressed space grid structure being the target cable force, the pretension scheme decision analysis method is studied when there's great difference between structural actual state and the analytical model. Based on recursive formulation of cable forces, the simulative recursive system for pretension process is established from the systematic viewpoint, including four kinds of parameters, i.e., system initial value (structural initial state), system input value (tensioning control force scheme), system state parameters (influence matrix of cable forces), system output value (pretension accomplishment). The system controllability depends on the system state parameters. Based on cable force observation values, the influence matrix for system state parameters can be calculated, making the system controllable. Next, the pretension scheme decision method based on cable force observation values can be formed on the basis of iterative calculation for recursive system. In this way, the tensioning control force scheme that can meet the design requirement when next cyclic supplemental tension finished is obtained. Engineering example analysis results show that the proposed method in this paper can reduce a lot of cyclic tensioning work and meanwhile the design requirement can be met.

A Study on the Distortion Control Characteristics of the STS 304 Multi-pass Butt Weldment by Tensioning Method (인장하중법에 따른 STS 304 다층 맞대기 용접부의 변형 제어 특성에 관한 연구)

  • Kim, Ha-Geun;Lee, Dong-Ju;Shin, Sang-Beom
    • Journal of Welding and Joining
    • /
    • v.28 no.3
    • /
    • pp.73-78
    • /
    • 2010
  • The purpose of this study is to develop the control technology of the welding distortion caused by Auto NG-GTA(Narrow Gap-GTA) welding process at the STS 304 multi-pass butt weldment. Heat input model for Auto NG-GTA welding process was established and verified by measuring temperature change and molten pool shape at the bead-on-plate weldment. With the heat input model developed, the effect of tension load on the welding distortion at the STS 304 multi-pass butt weldment was evaluated using the thermo-elasto-plastic FE analysis. In accordance with FEA results, the angular distortion and transverse shrinkage sharply decreased with an increase in tension load. This result indicated that tensioning method was an effective countermeasure against the welding distortion of the STS 304 multi-pass butt weldment.

A Study on the Distortion Control Characteristics of the STS 304 Multi-pass Butt Weldment by the Tensioning Method (인장하중법에 따른 STS 304 다층 맞대기 용접부의 변형 제어 특성에 관한 연구)

  • Kim, Ha-Keun;Lee, Dong-Ju;Shin, Sang-Beom
    • Proceedings of the KWS Conference
    • /
    • 2009.11a
    • /
    • pp.101-101
    • /
    • 2009
  • The purpose of this study is to develop the control technology of the welding distortion caused by Auto NG-GTA welding process at the STS 304 multi-pass butt weldment. For it, heat input model for Auto NG-GTA welding process was established and verified by measuring temperature change and molten pool shape at the bead-on-plate weldment. With heat input model developed, the effect of the tension load on the amount of welding distortion at the STS 304 multi-pass butt weldment was evaluated using the thermo-elasto-plastic FE analysis. In accordance with FEA results, the angular distortion and transverse shrinkage sharply decreased with an increase in tension load. This result indicates that tensioning method was verified as a countermeasure against the welding distortion of STS 304 multi-pass butt weldment.

  • PDF

Strengthening Design by External Pre-tensioning and Post-tensioning Methods for Steel-concrete Composite Girders using Rating Factor (내하율을 이용한 강합성보의 외부 프리텐션과 포스트텐션 보강 설계)

  • Choi, Dong-Ho;Yoo, Dong-Min;Jeong, Gu-Sang;Park, Kyung-Boo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.11 no.5
    • /
    • pp.123-134
    • /
    • 2007
  • A method to determine the initial force of external tendon is proposed to improve the load carrying capacity in existing steel-concrete composite bridges. This method is applied to tensioning external tendons prior to and after concrete replacement for strengthening composite girders. A procedure to determine the number of tendon and initial tendon force is described with the proposed rating factor, which considers the increment of tendon force due to live loads. The method is applied to the improvement of rating factor in an existing composite bridge and its validity is confirmed.

Design and Construction of Flat Slab using Unbonded Post-tension System (비부착 포스트텐션 플랫 슬래브의 설계와 시공)

  • Chung, Kwang-Ryang;Park, Jung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.91-96
    • /
    • 2011
  • The flat slab is well-known as a structural system to reduce the story height, so it is broadly used for recent building. However, the normal RC flat slab is not appropriate for the long span, and the quantity of reinforcement bar and concrete is raised. Recently, the post-tensioning system has been introduced and used widely as an alternative method. Nevertheless, in Korea, it is not used broadly due to lack of the understanding and field experience. Especially, the post-tensioning system is hesitated to use due to uncertainty of construction ability and economics. This paper will introduce applicability to site and economics of unbonded post-tensioning system through construction examples.

  • PDF

A study on Strengthening and Rehabilitation of Concrete girder bridge using Multi-Stepwise Thermal Prestressing Method (온도프리스트레싱 공법을 이용한 콘크리트교량의 보수보강에 관한 연구)

  • Kim, Sang-Hyo;Ahn, Jin-Hee;Kim, Jun-Hwan;Lee, Sang-Yong
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.05a
    • /
    • pp.238-241
    • /
    • 2006
  • The needs for strengthening and rehabilitation of the concrete bridges are a growing concern in many countries and has been emphasized in various researches and papers. Traditional external post-tensioning method using either steel bars or tendons is commonly used as a strengthening method. However, the method has some disadvantages such as stress concentration at the anchorages. Multi-stepwise thermal prestressing method is a newly proposed method for strengthening and rehabilitation of concrete girder bridges. Founded on a simple concept of thermal expansion and contraction of steel, the method is a hybrid method of external post-tensioning and steel plate bonding, combining the merits of two methods. In this paper, basic concepts on strengthening and rehabilitation of concrete girder are presented and an illustrative experiment is introduced.

  • PDF