• Title/Summary/Keyword: Temporary waterway

Search Result 4, Processing Time 0.021 seconds

Safe Navigation Plan for Dredging Operations to build Sunken Tunnel for Access Road between Busan-Geoje (부산-거제간 연결도로 침매터널공사의 준설작업에 따른 안전통항방안)

  • Kim, Jung-Hoon;Gug, Seung-Gi
    • Journal of Navigation and Port Research
    • /
    • v.30 no.10 s.116
    • /
    • pp.825-831
    • /
    • 2006
  • This research does by purpose that present safe navigation plan for ships during doing dredging construction with dredger crossing waterway of Gadeok Dredging operations need to build sunken tunnel that cross the bottom of the sea under waterway of Gadeok for access road construction between Busan- Geoje. Accordingly, dredger must cross and dredge waterway of Gadeok fatally. There is possibility of marine accident of collision for latent danger situation of ships to navigate waterway of Gadeok relatively. Therefore, safe navigation plan of ship is groped in reply and its countermeasure is presented. Firstly, navigating traffic in daytime was forecasted less than 20% of its maximum capacity through estimating the traffic volume and traffic congestion The proposal was presented to execute dredging operations in three-step and to establish temporary waterway after reviewing waterway design principles. The role of VTS center was emphasized in the new Busan Port, lastly.

The Study on the Practical Problems of FOB and CIF terms under L/C transaction - with Special Emphasis on Incoterms® 2010 - (신용장 거래에 있어서 FOB, CIF조건의 적용상 문제점에 관한 연구 - Incoterms® 2010을 중심으로 -)

  • Lee, Dae-Woo;Yang, Ui-dong
    • Journal of Arbitration Studies
    • /
    • v.21 no.3
    • /
    • pp.189-211
    • /
    • 2011
  • This article aims at analysing the practical problems of FOB and CIF terms relating to Incoterms$^{(R)}$2010 in case of L/C transactions and presenting the defending measures against them. According to Incoterms$^{(R)}$2010, FOB and CIF terms are to be used only for sea or inland waterway transport and require the seller deliver the goods on board the vessel nominated by the buyer at named port of shipment. So if FOB and CIF terms will be used in sea transport under L/C transaction, the seller should ship the goods on the nominated vessel and present the shipping document indicating "on board vessel" to the issuing bank but the parties agree to present the received bill of lading according to special condition on L/C which is" received bill of lading are acceptable". In practical transaction, FOB and CIF terms are usually used in aircraft cargo, container cargo or multimodal transport. these facts are a violation of Incoterms. Incoterms$^{(R)}$2010 which regulated that FOB and CIF terms may not be appropriate where goods are handed over the carrier before they are on board the vessel for example goods in container. These transactions are a temporary expedient and breach of Incoterms in the international trade which must be corrected as soon as possible.

  • PDF

A Study on the Diffusion of Silla Roof-End Tile (신라기와의 지방확산에 대한 검토)

  • Yang, Jong-Hyun
    • Korean Journal of Heritage: History & Science
    • /
    • v.45 no.3
    • /
    • pp.100-113
    • /
    • 2012
  • In the midst of recent active excavation, lots of Silla(新羅) roof-end tiles are unearthed in Yeongnam area(嶺南地域). These are confirmed the same tile frame as the Silla tiles excavated in Gyeongju(慶州). It is represented by the Silla tiles excavated in Ingaksa Temple(麟角寺) excavation research. Roof-end tile with arabesque design(唐草文平瓦當) etc. including roof-end tile with lotus design(蓮花文圓瓦當) are judged to be the tile frame produced by the same frame of roof-end tile that was excavated in Gyeongju, Wolseong(月城) and Hwangyongsa Temple(皇龍寺址). There are three kinds of cases concerning the transportation of tile manufacture ; the roof-end tile manufactured in Gyeongju directly moved to each region, only tile frame moved to site to be manufactured there, and tile manufacturer moved to site to manufacture there. This article considers the case of the roof-end tile manufactured in Gyeongju that was directly moved to each region. In case of the Silla tiles excavated in region especially Ingaksa Temple, the aspects of tiles in accordance with different era show the repeated coexistence, expansion and maintenance. This situation is significant as a clue to understand the supply from Gyeongju not as temporary, but as continuous. On the other hand, if the Gyeongju tiles flowed directly into each region, and if the road was built of gravels and the means of transportation was cart, the damage from movement must never be prevented. On the contrary, transportation through waterway might be advantageous due to the reduction of labor and damage rate and the easiness of loading. Accordingly, it tells us why the ruins where roof-end tiles were excavated located near big and small rivers or streams. Of course there are some ruins located in a fixed distance, but the distance may be enough to endure the impact put on tiles from the overland movement. Therefore, in case of direct inflow form long distance, transportation must be finished by overland movement after waterway movement.

Analysis of the Adequacy Check Dam according to Soil Loss using RUSLE (RUSLE 모형으로 토사유실에 따른 사방댐 적정성 분석)

  • Choi, Hyun
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.34 no.5
    • /
    • pp.515-524
    • /
    • 2016
  • Damage such as landslides has been caused by natural phenomenon like a heavy rain. As appropriate countermeasures, rather than analysing the cause of the landslide, we used methods of check dam installation and maintenance mountain basin. A check dam is a small, sometimes temporary, dam constructed across a swale, drainage ditch, or waterway to counteract erosion by reducing water flow velocity. In this study, we analysed the adequacy of check dam built to prevent further damage after landslides through GIS and examined the sediment erosion in the existing check dams for an ideal location of check dam, considering the accessibility and size. As a result of reviewing soil loss in the study watershed according to RUSLE(Revised Universal Soil Loss Equation), the basin I had about 2% soil loss reduction, the basin II showed less than 1 % soul loss reduction, and basin III showed the reducing effect of 5 % soil erosion.