• Title/Summary/Keyword: Temporary Building

Search Result 217, Processing Time 0.024 seconds

Meta-server Model for Middleware Supporting for Context Awareness (상황인식을 지원하는 미들웨어를 위한 메타서버 모델)

  • Lee, Seo-Jeong;Hwang, Byung-Yeon;Yoon, Yong-Ik
    • Journal of Korea Spatial Information System Society
    • /
    • v.6 no.2 s.12
    • /
    • pp.39-49
    • /
    • 2004
  • An increasing number of distributed applications will be achieved with mobile technology. These applications face temporary loss of network connectivity when they move. They need to discover other hosts in an ad-hoc manner, and they are likely to have scarce resources including CPU speed, memory and battery power. Software engineers building mobile applications need to use a suitable middleware that resolves these problems and offers appropriate support for developing mobile applications. In this paper, we describe the meta-server building for middleware that addresses reflective context awareness and present usability with demonstration. Metadata is consist of user configuration, device configuration, user context, device context and dynamic image metadata. When middleware send a saving or retrieval request to meta-server, it returns messages to middleware after the verification of the request. This meta-server has the application for multimedia stream services with context awareness.

  • PDF

The Way of Improving the Working Environment for Female Workers on Construction Site Based on Construction Welfare Facilities

  • Pak, Sungsine;Shin, Chang-Keun;Lee, Sang-Hak
    • Architectural research
    • /
    • v.22 no.2
    • /
    • pp.63-73
    • /
    • 2020
  • This paper reports problems of current working environment on construction site in South Korea from a female laborers' point of view and proposes solutions to improve the environment. To investigate and analyze the problems, a questionnaire survey and a focus group interview were conducted with 341 engineers and 557 laborers. Among them female engineers and female laborers were 51 and 136 respectively. Findings are the facilities related with welfare facilities such as lavatories, shower rooms, lounges and changing room, etc. for women were not sufficient and even not installed only for women because all of the planners for the facilities were men and The Standard of Estimate does not consider gender distinction. The data on the trade and the number of female laborers were not recorded and this study confirmed the number and the proportion of female laborers according to construction progress i.e. the proportion of female laborers were 0% ~ 11% (average 6%) at 26 construction sites having 2% ~ 92 % construction progress. In order to solve these problems, gender education for the welfare facility planner is required and the current Standard of Estimate should be revised considering female laborers after collecting the site data for the number of female laborers according progress and the increase in the construction cost should be reflected in the contract amount accordingly. Conclusively temporary work planning related with welfare facilities should be established and conducted in terms of gender equality at construction sites. In addition, improving working environment on construction sites for female laborers will enhance the company's image and also helping solve the labor shortage problem by women laborers engaging in construction industry easily.

Optimization for Precast Prestressed Wide-U Beams with the Least Depth (최소깊이 프리캐스트 프리스트레스트 U형보의 최적화)

  • Yul Sung-Yong
    • Journal of the Korea Concrete Institute
    • /
    • v.16 no.1 s.79
    • /
    • pp.18-26
    • /
    • 2004
  • The cost of underground work is a dominant factor to determine the total construction fee. It is generally 2 ${\~}$ 2.5 times higher than that of above ground for building with the same height. 'A new precast prestressed framing plan for underground parking building' was suggested with the beam of the least depth - U-type beams. The depth of regular rectangular reinforced concrete beam which is currently used in the underground parking of apartments could be reduced up to 12 ${\~}$ 34cm/story due to the development of a U-beams from the optimum process. Two full scale prototype U-beams were tested in this study. It was found that the Wide U-beams in the test showed higher strength than calculated nominal and design, however need to provide temporary supports to meet the flexural moment of construction load at the simply supported state before the lopping concrete hardens.

A Study on The Evaluation Criteria of Carbon Emission and the Development of the Evaluation Method in Apartment House (공동주택을 대상으로 한 탄소배출 평가기준 구축 및 평가방법 개발)

  • Choi, Doo-Sung;Chun, Hung-Chan
    • KIEAE Journal
    • /
    • v.13 no.5
    • /
    • pp.79-88
    • /
    • 2013
  • This study creates the evaluation criteria to analyze the $CO_2$ emission quantity in the complex of apartment house among domestic buildings and proposes how to calculate the $CO_2$ emission quantity by the only simple information of apartment house. The study shows that in order to create the index of carbon emission evaluation criteria, $CO_2$ emission quantity for its input materials in these 27 apartment houses are 445,412g-$CO_2/m^2$ for apartment building, 474,322g-$CO_2/m^2$ for the basement parking lot, 483,523g-$CO_2/m^2$ for welfare facility, 729,957g-$CO_2/m^2$ for sales facility, 743,560g-$CO_2/m^2$ for other facility, 26,782g-$CO_2/m^2$ for public facility, 43,659g-$CO_2/m^2$ for landscape, 1,113g-$CO_2/m^2$ for indoor facility, 11,251g-$CO_2/m^2$ for outdoor facility and 891g-$CO_2/m^2$ for common temporary based on the average $CO_2$ emission by facility. We can also see the analysis data that in case of using the selected factors only, the rate of error is 7.51% comparing with the emission quantity by using simplified LCA method this study suggests for the whole range of apartment houses and the rate of error is average 3.24% using selective and main materials. And this it is evaluated that we can get the result which is similar to the actual $CO_2$ emission quantity with only the simple information about the apartment house.

A Study on the Construction Methods of Sealer of Injection Type for Leakage Maintenance for Water Leakage and Cracks in Concrete (콘크리트 누수균열의 유지관리를 위한 누수보수용 주입형 실링재 시공방법 연구)

  • Kwon Shi-Won;Oh Mi-Hyun;Kwak Kyu-Sung;Oh Sang-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.87-91
    • /
    • 2006
  • Since water leakage and cracks are not the source of serious problems such as long-term lowering of performance and durability of a stricture, including damages to operating facilities of a structure, damages to internal finishing materials, exhibition, and goods, and pollution of residential environment, they might have led to development of positive coping skills; however, an instant loss of lives or property due to earthquake, explosion, typhoon, or a fire was indeed neglected. In these days, repair materials for leakage cannot help but being taken in temporary way without any noticeable countermeasure. This kind of repair is socially criticized many times that is defective construction even if this costs a lot. It was not arrange the standard for construction methods of sealer of injection type for leakage maintenance, even it has been used various type of construction methods for leakage part. In conclusion, we suggest that the construction methods of sealer of injection type for leakage maintenance for leakage to establish the leakage repairing technology as increase of structure demand. Therefore, it would be possible to provide a stage-by-stage solution by developing systematic research activities among the industry, schools, and research institutes to spread maintenance management techniques globally through technical solution to water leakage and cracks, acquisition of structural safety with prolonged durability for life cycle, reduction of water leakage repair expense s, and so on.

The Conceptual Framework of Concurrent Construction Method for EIFS in Apartment (공동주택용 외단열 적층시공 공법 개념모델 개발)

  • Lim, Hyunsu;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.413-423
    • /
    • 2015
  • Exterior Insulation and Finishing System(EIFS) is recognized as a promising alternative for energy reduction as energy reduction ratio of apartment is to be increased from 40% to 60% in 2017. However, EIFS is not actively applied to apartment because additional construction costs and duration are required for the current existing construction method of EIFS. Therefore, this study proposes a conceptual framework for concurrent construction method of EIFS which can reduce construction costs and duration by working sequentially from frame work to exterior insulation finishing work, and then verify the method's feasibility by analyzing a case study. It has been proven from the analysis that concurrent construction method of EIFS reduces 6.7% of construction duration and 13% of construction costs compared with the conventional exiting method. The proposed method is expected to contribute to invigorated application of EIFS to apartment.

Elastoplastic FEM analysis of earthquake response for the field-bolt joints of a tower-crane mast

  • Ushio, Yoshitaka;Saruwatari, Tomoharu;Nagano, Yasuyuki
    • Advances in Computational Design
    • /
    • v.4 no.1
    • /
    • pp.53-72
    • /
    • 2019
  • Safety measures for tower cranes are extremely important among the seismic countermeasures at high-rise building construction sites. In particular, the collapse of a tower crane from a high position is a very serious catastrophe. An example of such an accident due to an earthquake is the case of the Taipei 101 Building (the author was the project director), which occurred on March 31, 2002. Failure of the bolted joints of the tower-crane mast was the direct cause of the collapse. Therefore, it is necessary to design for this eventuality and to take the necessary measures on construction sites. This can only be done by understanding the precise dynamic behavior of mast joints during an earthquake. Consequently, we created a new hybrid-element model (using beam, shell, and solid elements) that not only expressed the detailed behavior of the site joints of a tower-crane mast during an earthquake but also suppressed any increase in the total calculation time and revealed its behavior through computer simulations. Using the proposed structural model and simulation method, effective information for designing safe joints during earthquakes can be provided by considering workability (control of the bolt pretension axial force and other factors) and less construction cost. Notably, this analysis showed that the joint behavior of the initial pretension axial force of a bolt is considerably reduced after the axial force of the bolt exceeds the yield strength. A maximum decrease of 50% in the initial pretension axial force under the El Centro N-S Wave ($v_{max}=100cm/s$) was observed. Furthermore, this method can be applied to analyze the seismic responses of general temporary structures in construction sites.

An Analysis on the Change of Existing Building-related System in Urban Parks (도시공원 내 기존 건축물 제도의 변천 과정 분석)

  • Oh, Chang-Song;Sim, Ji-Soo
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.10
    • /
    • pp.115-126
    • /
    • 2019
  • Existing buildings in urban parks are a kind of thing that has been settled and occupied on the site of an unexecuted park. The aim of this study is to identify nature by analyzing the causality and path-dependency through the transformation of the relevant system. The scope of the study was set up as a system for the occupancy of urban parks from 1934 when the building restriction system was established to 2000 when purchase claim (매수청구권) was introduced. The method of study was to get correlation by harmonizing the external and internal mechanisms affecting the relevant institution. The related system showed a modest change in the fourth stage, polymerizing the initial system. In the 1950s and 1960s, the existing buildings in urban parks were 'disguised' by government and the 'regulation' principle was applied since 1967. In the 1980s, the principle of 'protection' and 'support' for parks was added, but in the 1990s, the principle of regulation began to be lifted as the long-term unexecuted urban park (장기미집행 도시공원) problem continued for more than 60 years. Although the public concept of land ownership (토지공개념) has worked strongly for nearly 30 years since 1960, the system has developed into a form of deregulation since 1980. The nature of the relevant institution is first, dependent on the higher-level system and vertical. Second, it implies a conflict of restrictions and acceptance. Third, it is a temporary measure of the park problem. Therefore, the relevant system has long been enhancing the encroachment requirements on urban parks, so fundamental readjustment is needed in the future.

A Study on the Evacuation of the National Treasures and the National Museum of Korea's Activities in Busan during the Korean War (한국전쟁기 문화재 부산 소개(疏開)와 국립박물관의 부산 활동 연구)

  • JANG, Sanghoon
    • Korean Journal of Heritage: History & Science
    • /
    • v.55 no.2
    • /
    • pp.114-129
    • /
    • 2022
  • Securing a safe place to keep its collections in Busan, the interim capital during the Korean War, the National Museum of Korea could fulfill its mission to protect the national treasures. Right before Seoul was recaptured by the Communist forces, the museum managed to evacuate its collections to Busan in December of 1950. Until the armistice in 1953, a Korean government warehouse in Busan had to function as a temporary museum building. Protecting the national treasures in this small building, the National Museum of Korea had to maintain its role as a national museum and contribute in revitalizing cultural functions of Busan, the interim capital. The efforts led to hope for reconstructing the museum.

A Study on Stability of Arch-Type Vinyl House Structures (아치형 비닐하우스 구조의 안정성 연구)

  • Jung, Hwan-Mok;Yoon, Seok-Ho
    • Journal of Korean Association for Spatial Structures
    • /
    • v.14 no.4
    • /
    • pp.81-88
    • /
    • 2014
  • Construction of vinyl house structures is increasing because they do not have a large cross section as non-permanent structures. Vinyl house structures are apt to collapse by snow load because they have a small size member as a temporary building. Therefore, it is very important to ensure not only the stiffness of the individual member, but also the overall stability of three-dimensional arch-type vinyl house structures. The purpose of this study is to estimate the stability of arch-type vinyl house structures that have a various curvature under the vertical load such as snow load. As a result of the study, the buckling load of V27 model is the largest, and the values of buckling load have a tendency to increase with increasing H(height of arch) in the case of $H{\leq}2.75m$, but to decrease with increasing H in the case of $H{\geq}2.75m$.