• 제목/요약/키워드: Temporary Building

검색결과 217건 처리시간 0.029초

Interior Partitioned Layout and Daylighting Energy Performance in Office Buildings

  • Kim, Gon
    • Architectural research
    • /
    • 제1권1호
    • /
    • pp.31-40
    • /
    • 1999
  • In this age of "Information", many people consider it a deterrent to information flow to provide a hierarchy with private rooms in a modern office layout. There are others, however, who insist that visual and acoustical privacy are more important than any other design factor in achieving higher productivity. The debate may never end, but the partitioned open plan, which is a new form of the vast open plan, has merits of each concept - open and closed layout. Consequently, office design has dramatically shifted to partitioned open planning, with shorter, temporary walls or partitions, originally intended for increasing privacy and diminishing hierarchy, yet still keeping flexibility in spatial organization. The introduction of low-level partitioned spaces in an office layout, however, produces a complicated lighting design problem. Obviously, accurately predicted daylighting performance data are needed not only for daylighting design but for artificial lighting system design. Scale models of 12 sets of unit partitioned spaces are constructed and extensive scale model measurements of both daylight and reflected sunlight have been performed within an artificial sky simulator. The prototype-building interior is modeled with different partition configurations, each of which is modeled using the different envelope geometry and exterior configurations, and then the variations in interior light levels are estimated. The result indicates that partitioned spaces employed in an open plan of modern offices still offer a large potential for daylighting and energy saving as well. Much of the savings may derive from the cumulative effect of reflected sunlight. Optimal design for building envelope geometry and exterior configuration promises additional savings.

  • PDF

그리드상의 가상 자원 조직에 대한 자동 인증 시스템 연구 (A Study of Automatically Authentication System for Virtual Resource Organization on Grid)

  • 최병선;이원구;이재광
    • 한국콘텐츠학회:학술대회논문집
    • /
    • 한국콘텐츠학회 2004년도 춘계 종합학술대회 논문집
    • /
    • pp.301-306
    • /
    • 2004
  • 그리드 VO(Virtual Organization)는 내부 규정과 정책의 집합에 의하여 제어되는 기존의 VO 개념에서 벗어나 그리드 환경의 특성을 반영하고 임시적, 동적 기반의 자원 공유와 협업을 지원하기 위해서 개인 또는 기관, 시스템 자원이 모이도록 규격화된 임시적인 VO이다. 본논문에서는 그리드 VO 구성에서 자원을 할당할 경우에 발생할 수 있는 보안 문제 중 인증과 관련된 문제를 해결하고자 XML 정보보호기술을 토대로 경량화 된 그리드 VO 인증 시스템을 제안하였다. 본 논문에서 제안한 그리드 VO상의 자원에 대한 인증 시스템은 기존 인증 서비스 구성을 위한 PKI 기반 시스템에 그리드 VO를 구성하는 자원 인증 모듈을 중간 관리 시스템으로 포함하는 유형을 포함하고 있으며, 동적으로 변하는 그리드 VO에서의 자원에 대한 효율적인 인증 서비스를 제공할 수 있다.

  • PDF

이중버블시트를 이용한 단열양생공법의 한중콘크리트 현장적용 (Field Application of Insulation Curing Method with Double Bubble Sheets Subject to Cold Weather)

  • 홍석민;백대현;김종;전충근;한민철;한천구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 춘계 학술논문 발표대회
    • /
    • pp.57-60
    • /
    • 2008
  • This study investigated the results of insulation heat curing method using double layer bubble sheet in slab concrete and mass concrete in cold weather environment. First of all, when double bubble sheets are applied, it was shown that slab concrete was protected from early freezing by remaining between 6 and 15℃ even in case outside temperature drops -9℃ below zero until the 2nd day from piling, and in the case of mass concrete, with the maximum temperature difference between the center and surface less than 4℃, crack occurrence index was close to 2 and no hydration heat crack occurred by internal constraint. The insulation heat preservation curing method using the double bubble sheet applied in this field prevented early freezing owing to stable curing temperature management, deterring concrete strength development delay at low temperature, and obtained the needed strength. Also, it was proven that the method is highly effective and economic for cold weather concrete quality maintenance through curing cost reduction like construction period shortening and labor cost reduction, etc by reducing the process of temporary equipment installation and disassembling.

  • PDF

CWS공법(Buried Wale Continuous Wall System)을 적용한 Up-Up 시공사례 (Field Application of Up-Up Construction Using Buried Wale Continuous Walt System Method)

  • 이정배;임인식;김동현;오보환;하인호;임홍철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 춘계학술논문 발표대회 제6권1호
    • /
    • pp.1-4
    • /
    • 2006
  • A down construction method is frequently used in these days to reduce popular discontent and to assure sufficient working space at early stage in downtown area. There are two main problems in the existing down construction method. One is a confliction between frame works and excavation works, and the other is a cold joint in retaining wall which is unavoidable due to a sequence of concrete placement and induces a water leakage. Therefore, a new method is needed to overcome these problems. The CWS (buried wale Continuous Wall System) method was developed by authors. By replacing RC perimeter beam with embedded steel wale, the steel frame works of substructure can be simplified and the water leakage can be prevented using continuous retaining wall. Consequently, the improved duality and reduction of construction period can be obtained from CWS method.

  • PDF

버팀보 해체시 안전성 확보를 위한 응력 해제용 굴절지지대 개발 및 성능 평가 (Development and Performance Evaluation of Rotational Strut Segment for Releasing Stress when uninstalled)

  • 박철용;구일근;김현숙;양지연;김형오
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.109-110
    • /
    • 2018
  • Preloading Strut applied during installation of the wall jack, but additionally serves to minimize the displacement of soil pressure acting upon dissolution due to the difficulty. In this study, we developed an index of support for the release of stress to facilitate the dismantling of the strut uninstall. The refractive support the axial force acting on the strut are supportable, is refracted at minimum load, disassembly should be easy. In order to find the optimal shape and structural stability of the refractive support We have performed the numerical analysis and performance test to determine the final model. We carried out model tests and UTM test in order to understand the refractive performance and durability of the refractive support for optimal model. Results of the test UTM is refracted all shot 5 times within a target hit number, it was found that there is no problem of the refractive performance. Further, the results of model experiments, it was found that to ensure sufficient durability more than the performance target value of the pin joint support structure.

  • PDF

건축 구조체를 이용한 개량 역타공법의 변천 과정과 적용 사례연구 (A Case Study on the Application and History of Improved Method Top-Down Support by the Building Structure)

  • 이중재;정경식;노배영;홍원표;김종호
    • 기술발표회
    • /
    • 통권2006호
    • /
    • pp.45-53
    • /
    • 2006
  • Top-Down Construction Method has been considered as the steadiest and the most reasonable method of construction since 1984 when it was applied to LG Da-Dong building and its usage in the field construction has since grown rapidly. With increased cases, engineers not only pursue their studies of R & D continuously but also develop various technical methods based on Top-Down Construction in an era of rapid technological change to adopt them to the field construction. Top-Down Construction meets the needs of these challenging points, such as reduction and eliminates of temporary equipment for supporting permanent structures on the ground, improved method of construction, shortening construction periods, cost reduction, and allows for minimal environmental impact.

  • PDF

프랭크 로이드 라이트의 '텔리에센 웨스트'의 건축화 과정에 관한 연구 (A Study on the Architectural Thought and Its Construction shown in F. L. Wright's Taliesin West')

  • 박종성
    • 한국실내디자인학회논문집
    • /
    • 제16권3호
    • /
    • pp.3-9
    • /
    • 2007
  • Taliesin West is a meaningful historic site in architecture field, because its place had still been existing only one in the world as a ideal architectural community for working and living as well as learning by doing for Taliesin Fellowships and others based on F. L. Wright's idea of Organic Architecture. The main purpose of this study was to follow up the architectural thought and its construction shown in F. L. Wright's 'Taliesin West'. A study on the key notes are as follows; 1) The key-clue of the construction background for Taliesin West was based on the project of 'Complex Campus Building' which was early planed by F. L. Wright. 2) A basic design idea for Taliesin West was admiring from its own site characters as well as the Experimental construction methods and materials. 3) Design motive of Taliesin West was based on American Indian's movable shelter which called 'Tepee.' 4) A construction of F. L. Wright's temporary studio, Ocotilla, was a good opportunity to construct for Taliesin West which construction methods, covered and framed, were same as Ocotilla. 5) A concept idea of the master plan for Taliesin West came from combining Taliesin's Hillside Home School and Complex Campus Building project. 6) Construction of Taliesin West was a final accomplished place as F. L. Wright's utopia architecture and community.

CWS공법(buried wale Continuous Wall System)의 개발에 관한 연구 (Study on Development of CWS (buried wale Continuous Wall System) Method)

  • 이정배;임인식;천성철;오보환;하인호;임홍철
    • 한국건축시공학회지
    • /
    • 제6권2호
    • /
    • pp.81-89
    • /
    • 2006
  • A down construction method is frequently used in these days to reduce popular discontent and to assure sufficient working space at early stage in downtown area. There are two main problems in the existing down construction method. One is a confliction between frame works and excavation works, and the other is a cold joint in retaining wall which is unavoidable due to a sequence of concrete placement and induces a water leakage. Therefore, a new method is needed to overcome these problems. The CWS (buried wale Continuous Wall System) method was developed by authors. By replacing RC perimeter beam with embedded steel wale, the steel frame works of substructure can be simplified and the water leakage can be prevented using continuous retaining wall. Consequently, the improved qualify and reduction of construction period can be obtained from CWS method.

교량 상판 콘크리트 타설용 거푸집 시스템의 기하학적 타당성 분석의 기초연구 (Basic study about Geometric feasibility Analysis of the System form for the Bridge Slab)

  • 성수진;임지영;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.197-198
    • /
    • 2014
  • The concrete work of bridge decks is performed in a high place, which may reduce safety and productivity. In addition, the conventional method for deck forms require a great deal of manpower, and a form (sheathing) board is damaged when removed after curing. As a result, the concrete deck work of bridge construction becomes the cause of delayed construction and increased cost. To solve these problems, SMART form, a system form, is developed. SMART form is a temporary device for easier installation and removal, by mounting it to the lower flange of a bridge girder and using a mechanical behavior of the form system for deck concrete pouring. For stable installation and removal of the developed SMART form, geometric behaviors should be analyzed to prove its validity. Furthermore, the validity of geometric behaviors when the SMART form size is altered in response to the various arrangement of bridge girders should be proved. Thus, the study is intended to analyze the geometric validity of the form system for bridge deck concrete pouring. The structural stability of the form system for bridge deck concrete pouring can be secured, which will be applied in the field.

  • PDF

교량 상판(바닥판) 콘크리트 타설용 시스템 거푸집 개발을 위한 요구조건 분석 (Requirement Analysis of the System Form for the Bridge Slab)

  • 김태구;임지영;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.195-196
    • /
    • 2014
  • Unlike general construction works, bridge construction is mostly done in a high place. The conventional deck form of bridge is installed between precast concrete girders using sleepers, bridging joints and plywoods, and after concrete is poured to the deck, the form materials are removed at high altitudes. When removing the form, it may be dropped on ground, damaging the materials and resulting in economic loss. In addition, safety accidents are likely as the works are performed in a high place, and as the manpower increases, the cost increases. Also, it is difficult to install and remove temporary equipment. Therefore, it is required to develop a system form that allows easier and quicker installation and removal by unskilled workers and ensures safety of workers. In this regard, the study is intended to analyze requirements for the system form for pouring concrete to bridge decks, which can be easily installed and removed. The study result will be used as basic information for development of the system form for pouring concrete to bridge decks.

  • PDF